Details of Sites under Krishna Circle SL. Name of Site District Type of Site Remarks 12 3 4 5 A. UPPER KRISHNA DIVISION, CWC, PUNE I. Upper Krishna Sub‐Division, CWC, MIRAJ 1 Karad Satara GDSQ, T 2 Warunji Satara GDSQ (S) 3 Nivali Ratnagiri G 4 Targaon Satara GD Site opened on 08/11/2016 5 Arjunwad Kolhapur GDSQ, T 6 Kurunwad Kolhapur GDSQ 7 Samdoli Sangli GDSQ (S), T 8 Sadalga Belgaum GD (S), T 9 Terwad Kolhapur GD (S) 10 Nandre Sangali GD Site opened on 03/11/2016 11 Mahabaleshwar T‐I 12 Pandegaon T‐1 II. Upper Bhima Sub Division, CWC, PUNE 12 Mangaon Raigad GDSQ( S) 13 Badlapur Thane GDSQ 14 Nagathone Raigad GD 15 Pen Raigad GD 16 Mahad Raigad G 17 Muradpur/Chiplun Ratnagiri GDQ Site opened on 10/11/2016 18 Phulgaon Pune GDQ (S) 19 Paragaon Pune GD Opened on 29/11/2014 20 Mirawadi Pune GD Opened on 29/11/2014 III. Lower Bhima Sub Division,CWC, SOLAPUR Solapur Solapur T‐1 Boriomerga Solapur T‐1 21 Dhond Pune G 22 Narasingpur Solapur GD, T, FCS 23 Takli Solapur GDSQ, T 24 Sarati Pune GDSQ 25 Wadakbal Solapur GD,T 26 Kokangaon Bijapur G 27 Shirdhon Bijapur G B. LOWER KRISHNA DIVISION I Middle Krishna Sub‐Division‐II, CWC, KURNOOL 28 Huvenhedgi Raichur GDSQ, T, W/L 29 Deosugur Raichur G, T, W/L 30 P D Jurala Mahaboob Nagar G, W/L 31 K Agraharam Mahaboob Nagar G, T, W/L 32 Yadgir Yadgir GDSQ, T, W/L 33 Malkhed Gulbarga GDSQ, T 34 Jewangi Ranga Reddy G, T 35 Suddakallu Mahaboob Nagar GDSQ, T Opened on 20/11/2014 II. Lower Tungabhadra Sub‐Division, CWC, KURNOOL 36 Mantralayam Kurnool GDSQ, T, W/L 37 Bawapurm Kurnool GDSQ, T 38 T Ramapuram Bellary GDQ, T 39 Oollenur Raichur G (S), W/L 40 Tungabhadra Dam Bellary G, W/L 41 Almatti Dam Bijapur G, W/L 42 Narayanpur Dam Yadgir G, W/L 43 Deongaon Bridge Gulbarga G, T, W/L 44 Doddipadu Kurnool GD. T Opened on 18/11/2014 45 Megalnur Kurnool GD Opened on 24/10/2016 46 Sunkesla Anicut T‐II 47 Kurnool T‐I 48 Venisompuram T‐I 49 Medalkatti T‐I Kurunward Kolhapur W/L Gokak falls W/L Cholachiguda W/L Shimoga W/L Wirless stations maintained by Honnalli W/L LTSD, Kurnool Harlahali W/L Marol W/L Takli W/L IV. Lower Krishna Sub‐Division‐I, CWC, N S DAM 50 N S Dam Nalgonda G, W/L 51 Halia Nalgonda GDQ, T 52 Damercherla Nalgonda GDSQ, T 53 Marella Prakassam GDSQ 54 Vikkiralepeta Prakassam GD Opened on 22/03/2017 55 Srisailam Kurnool G, W/L 56 Yakunathpet* Guntur GD Opened on 19/10/2016 57 Veerlapalem Nalgonda GD Opened on 21/10/2016 58 Anantharam Nalgonda GD Opened on 27/10/2016 III. Lower Krishna Sub‐Division‐II, CWC, VIJAYAWADA 59 Wadenepalli Nalgonda GDSQ, T, W/L 60 Paleru Bridge Krishna GDSQ, T, W/L 61 Vijayawada Krishna GDSQ 62 Keesara Krishna GDSQ, T, W/L 63 Madhira Khammam GDSQ, T, W/L 64 Polampalli(S) Krishna G,T,W/L 65 Prakassam Barrage Krishna G, W/L 66 Munugodu Guntur GD Opened on 24/10/2016 67 Daredu Khammam GD Opened on 26/10/2016 68 Pulichintala Project T‐II 69 Avanigadda T‐II 70 Kolluru T‐I 71 Pindiprolu T‐I 72 Korvi/Kuravi T‐I Details of sites under Godavari Circle Sl.No Name of Site District Type of site Remarks 12334 A UPPER GODAVARI DIVISION I Upper Godavari Sub‐Division, CWC, AURANGABAD 1 Jaikwadi Dam Aurangabad G, T, W/L 2 Kopergaon Ahmednagar GDSQ, T, W/L 3 Lasur Aurangabad G, T, W/L 4 Nasik Nasik G, T, W/L 5 NMD Wier Nasik G, T, W/L 6 Pachegaon Ahmednagar GDSQ, T, W/L 7 Palkhed(Seasonal) Nasik G & W/L 8 Prattapur Ahmednagar GD Site opened on 31/10/2016 II Purna Sub‐Division, CWC, NANDED 9 G.R.Bridge Parbhani GD, T 10 Gangakhed W/L Station Parbhani G, T, W/L 11 Nanded Nanded GDQ, T 12 Purna Parbhani GDSQ, T, W/L 13 Yelli Nanded GD, T 14 Zari Parbhani GD, T, W/L 15 Dhalegaon Parbhani GDSQ, T, W/L 16 Saigaon Bidar GDSQ, T, W/L 17 Janwada Bidar GD Site opened on 19/12/2016 III Manjeera Sub‐Division, CWC, NIZAMABAD Nizamabad Nizamabad T‐1 18 Betmogrra Nanded GD, T, W/L 19 Bhainsa Adilabad G, T, W/L 20 Degloor Nanded GD, T, W/L 21 Gandlapet Nizamabad GDQ 22 Nizam Sagar Nizamabad G, T, W/L 23 Singur(Seasonal) Medak G, T, W/L 24 Sriram Sagar G 25 Saloora Nizamabad GDSQ Site opened on 21/11/2016 26 Janepally Nizamabad GD Site opened on 21/11/2016 27 Dandepally T‐1 28 Jagtial T‐I 29 Kaddam project(SRSP) T‐II 30 Nandgur T‐I 31 Sirikonda T‐I 32 Venkatapoor T‐I IV. Middle Godavari Sub Division, Warangal (New Sub‐Division) 33 Somanpally (Seasonal) Karimnagar GD, T 34 Kaleswaram Karimnagar G, T, W/L 35 Ankushapur Jaysankar Bhupalpally GD Site opened on 01/08/2014 36 Nagaram Karimnagar GD Site opened on 01/08/2014 37 Garimillapalli Jaysankar Bhupalpally GD Site opened on 19/12/2016 38 Allamvari Ghanpur Jaysankar Bhupalpally GD Site opened on 06/12/2016 39 Eturunagaram Warangal G, T, W/L 40 Perur Khammam GDSQ, FCS, T, W/L 41 Mancherial Adilabad GDSQ, T, W/L 42 Gaddapaka Warangal T‐I 43 Nagaram Karimnagar T‐I 44 PVN Rao Kanthanapally T‐II Yet to be installed. 45 Sri Pada Yellampalli Project T‐II 46 Racharla Gollapally T‐I 47 Gollet T‐I B LOWER GODAVARI DIVISION, HYDERABAD I Lower Godavari Sub‐Division‐I, CWC, BHADRACHALAM 1 Bhadrachalam Badradri‐Kothagudem GDSQ, T 2 Dummagudem Khammam G, T, W/L 3 Konta Dantewara GDSQ, T, W/L 4 Sangam (Kinnerasani) Khammam GQ 5 Sangam (Murredu) Khammam GD, T 6 Sukma Dantewara G, T, W/L 7 Talnar Sukma GD Site opened on 01/08/2014 8 Kerlapal Sukma GD Site opened on 01/08/2015 9 Elchireddipalle Kottagudem G Site opened on 01/12/2016 Basaguda T‐I 10Taliperu T‐II 11Chinturu(Tallegudem) T‐II II INDRAVATHI SUB‐DIVISION, CWC, JAGDALPUR 12 Ambabal Bastar GD, T 13 Cherribeda Bastar GD, T 14 Chindnar Dantewara GD, T, W/L 15 Jagdalpur Bastar GDSQ, T 16 Kiwaibalenga Bastar GD, T 17 Kosagumda Nowrangpur GD, T, W/L 18 Murthahandi Koraput GD, T 19 Nowrangpur Nowrangpur GDQ, T, W/L 20 Pathagudem Dantewara GDSQ, T, W/L 21 Sonarpal Bastar GD, T 22 Tumnar Dantewara GD,T, W/L 23 Upper Indravati Reservoir Nowrangpur G Site opened on 01/01/2018 24 Sangampalli Bastar GD Site opened on 29/11/2016 25 Kahdabari T‐I 26 Pegadpalli(Bandepare) T‐I 27 Gatam T‐I 28 Jiramtarai T‐I III Kolab Sileru Sub Division, Vishakapatnam (new sub d) 30 Potteru (Seasonal) Malkangiri GD, T 31 Saradaput Malkangiri GD, T, W/L 32 Kunturla Visakhapatnam GD Site opened on 31/03/2017 33 Sirmoda Koraput GD Site opened on 29/03/2017 34 Jeeraguda Koraput GD Site opened on 28/03/2017 35 Balimela Reservoir Malkangiri G Site opened on 01/01/2018 36 Machkund(Jalaput Dam) Koraput G Site opened on 11/01/2018 37 Upper Kolab Reservoir Koraput G Site opened on 03/01/2018 38 Tikra Pada T‐1 IV Lower Godavari Sub‐Division‐II, CWC, RAJAHMUNDRY 39 Dowlaiswaram East Godavari G, T 40 Godavari Rly Bridge East Godavari G, T 41 Koida Khammam G, T, W/L 42 Kunavaram East Godavari G, W/L, T1 43 Polavaram West Godavari GDSQ, T, W/L 44 Valamur East Godavari GD Site opened on 01/06/2016 45 Kanuru Agraharam West Godavari GD Site opened on 21/12/2016 46 Vadapalli East Godavari GD, T‐II Site opened on 22/12/2016 47 Kothapalle East Godavari GD Site opened on 21/12/2016 48 Indirasagar Polavarm T‐II Yet to be installed.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages5 Page
-
File Size-