ROADS & BUILDINGS DEPARTMENT From

ROADS & BUILDINGS DEPARTMENT From

ROADS & BUILDINGS DEPARTMENT From : To Sri M.Venugopala Rao The Chief Engineer, (R&B), M.Tech. M.D., APRDC Superintending Engineer (R&B) Errummunzil, Seethammadhara, Andhra Pradesh, Visakhapatnam – 530 013, Hyderabad. e-mail : [email protected] Fax : 0891-2553265 Lr.No.3042/AP second Highway Report/2005, dated: 10 -12-2005. Sir, Sub:- A. P. Second Highway Project-Justification for qualifying the roads- Particulars submitted-Reg. Ref:- 1. Circular Memo.No.AP SM.II/RR/GM.I/2002 dt.29.11.2005 of Chief Engineer(R&B) & M.D.,APRDC, Hyderabad ### I submit herewith the particulars in the prescribed Proforma (a) to (k) of roads identified under Ist phase of A.P. Second High way Project pertaining to (R&B) circles (i) Visakhapatnam (ii) Vizianagaram (iii) Srikakulam for favour of taking further necessary action. Yours faithfully Sd/- Superintending Engineer(R&B) Visakhapatnam Encl: Project Report for For six roads along With maps and combined map INDEX S.No Name of the Road Page No. 1 Narsipatnam-Sabbavaram-Kottavalasa- 1 to 6 Vizianagaram-Palakonda-Haddubangi 2 Polavaram-Narsipatnam-Tallapalem 7 to 9 3 Calingapatnam-Parlakhemudi 10 to 11 4 Nrsipatnam-Devipatnam 12 to 13 5 Anakapalli-Anandapuram 14 to 15 6 Kakinada - Polamanipeta,Venkatanagaram- 16 to 19 Pentakota-Pudimadaka-Atchutapuram- Gajuwaka-Visakhapatnam(Item 7 of C E.Circular dt.24.11.05) 7 Combined Map 20 1) NARSIPATNAM- SABBAVARAM- KOTHAVALASA - VIZIANGARAM- PALAKONDA-HADDUBANGI ROAD A.P. SECOND HIGHWAY PROJECT - PARTICULARS ON ROADS Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No. Forest road connectivity problems if value in due to poor laning APSHP RUBs condition vehicles per Land MDR/SH any mm/km subgrade surveys day a b c d e f g h I j k 1 2 3 4 5 6 7 8 9 10 11 12 13 1)Narsipatnam- NH5 Sabbavaram- NIL KM110/5 to SH 38 km757/8is Sarpa Plain terrain NIL fair 4300=23km's 1618 Nil Kottavalasa- 108/0 of BN at distance LWW 60M Traffic=7000MT/day 7200=15.50km's No's Vizianagaram- Road of 30km's atkm104 of Width in M Palakonda- (Narsipatnam from Narsi- BN road km0/0to0/500=5.50 Haddubangi Road village) patnam i.e km110/0to109/0=10.00 I Bheemunipatnam km110/5of km109/0to108/0=5.50 Narsipatnam km83/500to BN road . km108/0to107/0=10.00 -Road from 82/0ofBN road km107/0to90/0=5.50 KM110/5toKM72/0 (Ravikamat NH5 km90/0to88/0=3.66 (Project chainage -am village) km745/0 km88/0to86/0=5.50 KM 0/0to38/500) km72/800to is at a Pedderu km86/0to83/2=3.66 72/0of BN road distance LWW 80M km83/2to82/0=10.00 (Waddadi of 26 atkm72/4 km82/0to80/0=5.50 village) km's from of BN road km80/0to79/0=3.66 Waddadi km79/0to73/2=5.50 I.ekm72/0 km73/2to72/450=7.00 of BN road km72/450to72/355=5.50 km72/355to72/0=10.00 II Bheemunipatnam NIL km66/0to SH 38 NH km 745/0 Plain terrain NIL fair 4300=15km's 2630 Nil Narsipatnam 63/0of is at a Sarada Traffic=8000MT/day 7200=7km's No's -Road from km BN road distance LWW 120M Carriage way km72/0to50/0 (Chodavaram of 12 atkm60/10 Width in M (Project chainage Village) km's from of BN road km72/0to64/600=7.00 km38/500to60/500) km60/6to Venkanna km64/600to63/4=15.00 58/0of BN road palem km63/4to61/0=5.50 (Govada village) I.ekm 58/2 km61/0to59/6=10.00 of BN road km59/6to58/650=5.50 km58/650to58/395=15.00 km58/395to57/600=5.50 km57/6to50/0=7.00 III Bheemunipatnam NH km 745/0 Plain terrain Narsipatnam NIL Nil SH38 is at a NIL Traffic=71535 MT/day fair 4300=11.20km's Nil -Road from km distance Carriage way NIL 4500 km50/0to38/8 of 17km's Width in M (Project chainage from Sabba- km50/0to38/8=7.00 km60/500to71/700) varam i.e km58/2of BN road Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No. Forest road connectivity problems if value in due to poor laning APSHP RUBs condition vehicles per Land MDR/SH any mm/km subgrade surveys day a b c d e f g h I j k 1 2 3 4 5 6 7 8 9 10 11 12 13 IV Sabbavaram to Kotthavalasa Road NIL Nil MDR NH is at RLC in Plain terrain NIL fair 7200=12.40km's km 0/0to12/400 distance km84/0to100 Traffic=5000M T/day 1500 Nil (Project chainage of 18 LC No 482 Carriage way km71/700to84/150) km's from RLY km Width in M km71 852/19-21 km0/0to12/400=3.75 Project TVU>110000 Chainage Interuption app.10hours/day V Vizianagaram- NIL (a) 32/8 to 31/0; MDR 20 kms from (a)Railway crossing Plain terrain : Required km.4/4 to a)4KM - 2900 2079 K M . 26 / 3 t o Kothavalasa road MDR & SH NH.5 from is at km.23/8-10 (in Traffic: 24623 T/Day land 12/8 - Fair b)6KM-4300 32/8 km.32/8 to 4/4. j o i n ing p o in t a t Rajapulova. km.93.15) Km.4/4 to 8/2 - 7.0M; 8/2 acquisition (104.15 to c)10KM-7200 (84.15 to Project km.84.15 + Kothavalasa Kantakapalli gate to 8/8 - 10Mt; 8/8 in Builtup 112.55); 90.65) 28.4 = 112.55kms) village limits LC No: 475 to 11/4 - 7.0Mt; area at 12/8 to 26/3 - Heavy Iron (km.84.15 to Railway KM 843/3- 11/4 to 11/885 - 10.0Mt; K o t h avalas Fair (90.65 ore 85.95) (b)12/0 5 TVU> 100000 11/885 to 12/8 - 7.0Mt; a , t o 104 .15) transportati to 8/0 interuption app. 10 12/8 to 31/0 - 5.50Mt; B heemasin 26/3 to 32/8 - on trucks Bheemasingi hours needs ROB. 31/0 to 32/8 - 10Mt; gi & Poor (84.15 having 45 Sugar Factory (b)Alamanda gedda 31/339 to 31/565 - CC road; K o r u k o nd a t o 90 . 65) to 50 MT area, B.S.road at km.18/6 (88.35) 31/895 to 32/095 -CC road. villages. ply on this and Lakkidam and narrow section of road junction (c) Intermediate lane Roads km.7/0 to 6/0 old and weak throughout (109.95 to bridge and needs day. 110.95) Sainik reconstruction. School Bus Bay (c)Rail crossing at required at km.10/6-8 (106.35) Korukonda. Bheemasingi gate LC No: 96 Rly KM 831/13-15 TVU > 100000 interuption approx 10 hours needs ROB (d)km.10/4 (Gostani River) (106.55) bridge Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No. Forest road connectivity problems if value in due to poor laning APSHP RUBs condition vehicles per Land MDR/SH any mm/km subgrade surveys day a b c d e f g h I j k 1 2 3 4 5 6 7 8 9 10 11 12 13 VIVizianagaram- NIL 4/4 to 0/0 M DR Originates from NIL Plain terrain Required Poor 3/0 4 - 3,000 1250 3/0 to 4/4 Padmanabham road (112.55 to NH43 at Traffic:6709T/Day l a nd to 4/4 (km.112.5 km.4/4 to 0/0. 116.95) km.549/2 of 0/0 to 4/4 - 7Mt. a c qu isition (km.112.55 5 to Project km.112.55 + Raipur- (112.55 to 116.95) in wet to 113.95) 113.95) 4.4 = 116.950) Visakhapatnam lands. road in Vizianagaram town limits. VIIkm.549/2 to 546/6 of ..N.H. OVER LAP ALREADY IMPROVED FOR FOUR LANES… NH.43 (Raipur- Visakhapatnam road) Project 116.950 + 2.70 = 119.650 VIIIRajiv statue to km.2/6 NIL 1/4 to 5/948 M DR Originates from NIL Plain terrain : Required Poor 11 - 7900 1504 3/0 to 4/0 of Vizianagaram- (121.05 to NH43 at Traffic 22773T/Day l a nd 3/0 to 4/0 (km.122.6 Palakonda road junction 125.598) in km.546/5 of 0/0 to 1/4 - 14 Mt. acquisition (122.65 to 5 to (via) Balajee theatre Vizianagaram Raipur- (119.650 to 120.4 ) in 123.65) 123.65) junction km.0/0 to town limits (Ring Visakhapatnam & 1/4 to 5/948 - 7.0Mt. Vizianagara 5/948. road) road in (120.40 to 124.948) m town Project: 119.650 + Vizianagaram limits. 5.948 = 125.598. town limits. Pavement Traffic values Constraints Classifica- Land Pavement Road Sections Distances from Major river and in terms of S. regarding tion of Homogeneous part of road/ acquisition roughness sections Name of the Road requiring four NH or improved crossings/ ROBs/ shoulder Commercial No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    22 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us