Immensely Complex &High Risk*

Immensely Complex &High Risk*

ONLY BOCA CHICA, TX CAPE CANAVERAL, FL RENDEZVOUS 3 W/ ORION IN NRHO NATIONAL TEAM RENDEZVOUS LAUNCHES W/ ORION IN NRHO WITH PROVEN SYSTEMS 10 STARSHIP/ SUPER HEAVY LAUNCHES FOR JUST ONE 8+ REFUELERS TRANSFER TO TANKER 8+ REFUELERS TRANSFER TO LUNAR LANDING LUNAR STARSHIP: IMMENSELY COMPLEX &HIGH RISK* There are an unprecedented number of just a single Starship lunar landing, this technologies, developments, and operations must all be done more than 10 times that have never been done before for flawlessly.This is so that Starship can get to Starship to land on the Moon. This includes the surface and back with a single-stage developing Super Heavy – not only the ascent/descent vehicle, without dissimilar largest launch vehicle stage ever produced, redundancy in abort engines. but one that has to be reusable – and Starship – the first ever reusable second NATIONAL TEAM: SAFE, LOW-RISK, FAST stage. Then, the two systems must work The National Team’s architecture only together. A launch site in Boca Chica, Texas requires three launches and is flexible to that has never conducted an orbital launch fly on multiple existing launch vehicles must demonstrate the ability to do so 7-11 with far fewer in-space rendezvouses. times within 1-week increments. And Further, the system is entirely built on FT FT cryogenic fluid transfer – a process that has heritage systems and proven technologies also never been done – must work to refuel that are flying today. up to 100 MT of propellants from Starship to Starship that also requires development of 32 126 a new tanker Starship variant. Finally, for DISTANCE FROM GROUND TO HATCH *FROM NASA SOURCE SELECTION STATEMENT: “While I find the positive aspects of SpaceX’s technical approach to be notably thoughtful and meritorious, these aspects are, however, tempered by its complexity and relatively high-risk nature... I acknowledge the immense complexity and heightened risk associated with the very high number of events necessary to execute the front end of SpaceX’s mission, and this complexity largely translates into increased risk of operational schedule delays.”.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us