5.Loading Infrastructure

5.Loading Infrastructure

RAIL AND MGR DESPATCH INFRASTRUCTURE IN ECL Dated :18.9.08 Colly to Sdg Crushing Stacking Mode of PilotwiseLinked Pilotwise linked Weighbridge AREA PILOT SIDING Sdg.capacity L I N K E D C O L L I E R Y distance KM arrangement Capacity FLoading consumer/sector Weighbridge Type/Owner (Box-N) (Rake) Pandaveswar PAW-I (M/N) Manderboni 29 Manderboni Below 3 UG Coal* 0.7 Mech Power/Industry PAW-I EPS-in-Motion/ECL Madhaipur 40 Madhaipur Below 3 UG Coal* 1 Man/Mech PAW-II (PD) Dalurband 46 Pandaveswar, Daluband, Kendra Below 3 UD Coal* 1.2 Mech Power Dalurband(PAW-II) Converted EPS- In-Motion/ECL PAW-II(SS) Sel.Samla 64 Khottadih OCP Above 3 to 10 Feeder Breaker 1.7 Mech Power Dalurband(PAW-II) Do PAW-II (K) Khottadih CHP 42 Khotadih UG Below 3 UG Coal* 0.7 CHP Steel/Power Dalurband(PAW-II) Do Jhanjra PAW-I (POCP) POCP No.1 63 Jhanjra 1 & 2 Incline 5 to 6 UG Coal* 1.7 Mech Power PAW-I EPS-in-motion/ECL No.1 MIC 8 to 9 UG Coal* Jhanjra 3 & 4 Incline 9 to 10 UG Coal* South Samla Below 3 UG Coal* Bankola PAW-I (POCP) POCP No.2 59 Nakrakonda OCP 4 to 5 By Dozer 1.5 Mech Power/Industry PAW-I EPS-in-Motion/ECL No.2 Nakrakonda Colliery Above 3 to4 UG Coal* Kumardihi B Above 3 to 4 UG Coal* UKA-IV(B) Bankola No.1 59 Bankola Gr. B Below 3 UG Coal* 1.5 Man-cum- Indus/Defence/ Andal EPS-in-Motion/Rly Tilaboni 5.9 UG Coal*Mech Power/Export/Cmt Kumardihi-A 4.6 UG Coal* S.S.Pur UG 4 UG Coal* S.S.Pur UG Old 6.3 UG Coal* Moira 4.9 UG Coal* Khandra Below 3 UG Coal* Shankarpur UG 3.8 UG Coal* Bankola No.2 26 Bankola Gr. C Below 3 UG Coal* 0.8 Do Sonepur UKA-V Sankarpur 59 Sonepur Bazari OCP 5 to 6 By Crusher 2 Mech Power UKA-V EPS-in-Motion/ECL Kajora UKA-I(P/W) Parascole(W) 58 Jambad OCP Above 3 to 10 By Dozer 1.5 Mech Power Andal EPS-in-Motion/Rly. UKA-I (N/K) Naba Kajora 59 Naba Kajora 7 Pit Above 3 to 10 UG Coal* 1.5 Man-cum- Power/Steel/ Andal EPS-in-Motion/Rly. Naba Kajora 5 Pit Below 3 UG Coal* Mech Defence/Cement Madhabpur Patch Above 3 to 10 By Dozer Madhabpur UG Below 3 UG Coal* UKA-II (KK/PE) Parascole(E) 20 Parascole East & West Below 3 UG Coal* 0.5 Man-cum- Power/Steel/ Andal EPS-in-Motion/Rly. Khas Kajora 32 Khas Kajora Below 3 UG Coal* 0.8 Mech Industry/Defence Madhujore Asstd. 20 Madhusudanpur Below 3 UG Coal* 0.5 Cement Kenda CHA-I (Bahula) Pure Jambad 58 All Colliery/OCP of Kenda Area Above 3 to 10 Feeder Breaker 1.5 CHP/Mech Power Sonachara EPS-in-Motion/ECL except New Kenda CHA-II (N/K) New Kenda 29 New Kenda Below 3 By Crusher & 0.5 CHP Power Sonachara Do West Kenda OCP Above 3 to 10 Feeder Breaker Satgram RNG-(I / III) East Nimcha(RNG-I) 59 Nimcha 4 Pit & 7/8 Pit Below 3 UG Coal* 1.5 Man-cum- Power/Industry Asansol EPS-in-motion/ECL Nimcha OCP (Damalia Patch Extn) Not working Manual Kuardih (RNG-III) 20 Kuardih Below 3 UG Coal* 0.5 Do DN-I Modern Satgram 59 Jemehari, Pure Searsole Below 3 UG Coal* 1.5 Man-cum- Power/Industry Nimcha EPS-in-motion/ECL Satgram Inc 9.7 UG Coal* Mech Cement Sitaldas OCP 4.9 Manual J K Nagar 3 Pit 4.5 UG Coal* J K Nagar 1/2 Pit 5.4 UG Coal* Satgram Project 4.5 UG Coal* Kalipahari, Muslia 13 to 15 UG Coal* SSI, Ningha 6 to 7 UG Coal* KDI, Bhanora West Block 14 to 16 UG Coal* Kunustoria CHA-II (P) Parasea 59 Belbaid,6&7 Incline Above 3 to 10 UG Coal* 1.5 Man-cum/ Indus/Export/ Sonachara EPS-in-Motion/ECL Parasea Below 3 UG Coal* Mech Power KNST Kunustoria 29 Kunustoria UG Below 3 By Crusher 0.5 CHP Power/Steel Sonachara EPS-in-Motion/ECL TOP-I (BNS) Bansra 40 Bansra UG Below 3 UG Coal* 1 Mech Power Sonachara EPS-in-Motion/ECL Bansra OCP Above 3 to 10 Manual TOP-I (BEL) Parasea OCP 59 N.Searsole, Amrasota Inc. Above 3 to 10 UG Coal* 1.5 Mech Power Sonachara EPS-in-Motion/ECL Belbaid Patch, Below 3 Feeder Breaker Mahabir OCP, Amritnagar UG Above10 to 20 & Dozer Sodepur ABM Bejdih 14 Bejdih Below 3 UG Coal* 0.4 Mech Power Radhanagar EPS-in-Motion/ECL Methani 18 Methani/Patmohana Below 3 UG Coal* 0.5 Mech PBH Parbelia 30 Parbelia, Dubeswari Below 3 UG Coal* 0.8 Mech Power Parbelia EPS-in-Motion/ECL CKI 1 Chinakuri-I&2 Pit 29 Chinakuri 1 Below 3 UG Coal* 0.5 Mech Steel Radhanagar EPS-in-Motion/ECL CKI III Chinakur-III Pit 29 Chinakuri III, Sodepur 9 & 10 Pit Below 3 UG Coal* 0.7 Mech Power Radhanagar EPS-in-Motion/ECL RAIL AND MGR DESPATCH INFRASTRUCTURE IN ECL Dated :18.9.08 Sodepur 3A pit Above 3 to 4 UG Coal* Mouthdih 5 to 6 UG Coal* Mugma MMU-IIIA Mugma-III A 59 Chapapur/Badjna/Hariajam/ Above 3 to 10 UG Coal* 1.5 Man-cum- Power Pandra/ECL EPS-in-Motion/ECL Shampur A, Khoodia, Gopinathpur UG Coal* Mech Lakhimata, Mandman, Shampur B UG Coal* Rajpura OCP 8 to 9 Manual Barmuri OCP, Kumardhubi 11 to 12 Manual EX-CHC Ex-CHC 56 Kumardhubi, Barmuri OCP Below 3 Manual 1.3 Man-cum- Power Kumardubi EPS-in-Motion/BCCL (40 + 16) Rajpura OCP 7 to 8 Manual Mech S P Mines JMT Jamtara 64 Chitra OCP 27 to 28 By Dozer 1.7 Mech Power Jamtara EPS-in-Motion/ECL Salanpur SLS-I Bonjemehari 59 Gourandih OCP 28 to 29 Manual/Dozer 6 Man-cum- Power Dalmiya EPS-in-Motion/ECL Dabor UG, Sangramgarh OCP 7 to 8 Mzanual/Dozer Mech Chakballavpur 16 to 17 UG Coal* Manoharbahal 21 to 22 UG Coal* Begunia 31 to 32 UG Coal* Khoirabad OCP 29 to 30 Manual/Dozer Mohanpur OCP 22 to 23 Manual/Dozer Bonjemehari OCP Below 3 Manual/Dozer Rajmahal PPT Pirpainti 59 Rajmahal OCP 32 to 33 By Crusher 1.5 Mech Power Pirpainti EPS-in-Motion/ECL SILO Point SILO Point (MGR) MGR RAKE Rajmahal OCP Below 3 By Crusher by Crusher * UG coal is produced as - 250 mm through blasting & other mech. means..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us