1.48 Ha Village –Phalsoond, Tehsil –Bhaniyana, District - Jaisalmer (Raj.) Pre -Feasibility Report

1.48 Ha Village –Phalsoond, Tehsil –Bhaniyana, District - Jaisalmer (Raj.) Pre -Feasibility Report

Gypsum Permit, Ref No-2017160585 Production Capacity -1925 TPA, Area- 1.48 ha Village –Phalsoond, Tehsil –Bhaniyana, District - Jaisalmer (Raj.) Pre -Feasibility Report INDEX 1 EXECUTIVE SUMMARY ................................................................................................... 06 2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION ................ 10 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT ......................................... 10 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION .......... 11 2.3 DEMAND – SUPPLY GAP ....................................................................................................... 12 2.4 IMPORTS VS. INDIGENOUS PRODUCTION ........................................................................ 12 2.5 EXPORT POSSIBILITY ............................................................................................................ 12 2.6 DOMESTIC/EXPORT MARKETS ............................................................................................ 12 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT ..... 12 3 PROJECT DESCRIPTION .................................................................................................. 13 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY ............................................................................................................................................ 13 3.2 LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, AND PROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATES; ................. 13 3.3 DETAILS OF ALTERNATE SITES CONSIDERED AND THE BASIS OF SELECTING THE PROPOSED SITE, PARTICULARLY THE ENVIRONMENTAL CONSIDERATIONS GIVEN INTO SHOULD BE HIGHLIGHTED . ......................................................................... 15 3.4 SIZE OR MAGNITUDE OF OPERATION ............................................................................... 15 3.4.1 REGIONAL GEOLOGY ......................................................................................................... 15 3.4.2 MINERAL RESERVES .......................................................................................................... 17 3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS (A SCHEMATIC DIAGRAM / FLOW CHART SHOWING THE PROJECT LAYOUT, COMPONENTS OF THE PROJECT ETC. SHOULD BE GIVEN) ...................................................................................................... 17 3.5.1 YEAR WISE PRODUCTION DETAILS................................................................................ 17 3.5.2 PROPOSED METHOD OF MINING: .................................................................................... 17 3.5.3 EXTENT OF MECHANIZATION ......................................................................................... 18 3.5.4 CONCEPTUAL MINING PLAN ............................................................................................ 18 3.5.5 DRILLING ............................................................................................................................... 19 3.5.6 BLASTING ................................................................................................................................. 19 6 Gypsum Permit, Ref No-2017160585 Production Capacity -1925 TPA, Area- 1.48 ha Village –Phalsoond, Tehsil –Bhaniyana, District - Jaisalmer (Raj.) Pre -Feasibility Report 3.6 RAW MATERIAL REQUIRED ALONG WITH ESTIMATED QUANTITY, LIKELY SOURCE, MARKETING AREA OF FINAL PRODUCTS, MODE OF TRANSPORT OF RAW MATERIAL AND FINISHED PRODUCT ..................................................................... 19 3.7 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, SHOULD BE BRIEFLY OUTLINED ...................................................... 19 3.8 AVAILABILITY OF WATER & ITS SOURCE, ENERGY / POWER REQUIREMENT AND SOURCE ..................................................................................................................................... 19 3.9 QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL .............................................................................. 20 4 SITE ANALYSIS ................................................................................................................... 20 4.1 CONNECTIVITY (Mine Site) .................................................................................................... 20 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP .......................................................... 20 LAND OWNERSHIP ........................................................................................................................... 21 4.3 TOPOGRAPHY .......................................................................................................................... 21 4.4 EXISTING LAND USE PATTERN (AGRICULTURE, NON-AGRICULTURE, FOREST, WATER BODIES (INCLUDING AREA UNDER CRZ)), SHORTEST DISTANCES FROM THE PERIPHERY OF THE PROJECT TO PERIPHERY OF THE FORESTS, NATIONAL PARK, WILD LIFE SANCTUARY, ECO SENSITIVE AREAS, WATER BODIES (DISTANCE FROM THE HFL OF THE RIVER), CRZ. IN CASE OF NOTIFIED INDUSTRIAL AREA, A COPY OF THE GAZETTE NOTIFICATION SHOULD BE GIVEN. ..................................................................................................................................................... 21 4.5 EXISTING INFRASTRUCTURE .............................................................................................. 22 4.5.1 WATER ................................................................................................................................... 22 4.5.2 BASIC AMENITIES ............................................................................................................... 22 4.6 SOIL CLASSIFICATION .......................................................................................................... 22 4.7 CLIMATE ................................................................................................................................... 22 4.8 SOCIAL INFRASTRUCTURE AVAILABLE .......................................................................... 22 5 PLANNING BRIEF ............................................................................................................... 23 5.1 PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, AND TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/ DEVELOPMENT AUTHORITY CLASSIFICATION .................................................................................................................... 23 7 Gypsum Permit, Ref No-2017160585 Production Capacity -1925 TPA, Area- 1.48 ha Village –Phalsoond, Tehsil –Bhaniyana, District - Jaisalmer (Raj.) Pre -Feasibility Report 5.2 POPULATION PROJECTION ................................................................................................... 23 5.3 LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.) ........................ 23 5.4 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL) .............. 24 5.5 AMENITIES/FACILITIES ......................................................................................................... 24 6 PROPOSED INFRASTRUCTURE ..................................................................................... 24 6.1 INDUSTRIAL AREA (PROCESSING AREA) ......................................................................... 25 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) ............................................................. 25 6.3 GREEN BELT ............................................................................................................................ 25 6.4 SOCIAL INFRASTRUCTURE .................................................................................................. 25 6.5 CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO /WATER WAYS ETC.) .............................................................................................................................. 25 6.6 DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER) ....................... 25 6.7 SEWAGE SYSTEM ................................................................................................................... 25 6.8 INDUSTRIAL WASTE MANAGEMENT ................................................................................ 25 6.9 SOLID WASTE MANAGEMENT ............................................................................................ 25 6.10 POWER REQUIREMENT & SUPPLY/SOURCE .................................................................... 26 7 REHABILITATION AND RESETTLEMENT (R & R PLAN)........................................ 26 7.1 POLICY TO BE ADOPTED (CENTRAL/STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUSTEES, LAND OUSTEES AND LANDLESS LABOUR (A BRIEF OUTLINE TO BE GIVEN). ............................................... 26 8 PROJECT SCHEDULE AND COST ESTIMATES .......................................................... 26 8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR THE PROJECT WILL BE GIVEN). ................................................ 26 8.2 ESTIMATED PROJECT COST AND ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT .......................................................................... 26 9 ANALYSIS OF PROPOSAL ................................................................................................ 27 10 ENVIRONMENT MANAGEMENT PLAN .......................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us