STATE HIGHWAY 114: (IRVING SIGNATURE BRIDGE) PROJECT FACT SHEET TEXAS DEPARTMENT OF TRANSPORTATION DNT CURRENT ACTIVITY . 35E e k p 635 Removal of the frontage roads 114 635 T ush 77 e B Roadway excavation rg eo DFW Int’l. t G Royal Ln. en Site preparation for the 132,667 square feet of retaining walls2 d Airport si Walnut Hill Ln. re P 12 UPCOMING ACTIVITY 161 Northwest Hwy. 114 Love Field Begin constructing bridge foundations Airport 183 DNT 12 BRIDGE FACTS 35E 75 DALLAS CO. DALLAS 77 TARRANT CO. TARRANT Detail Area The project will actually consist of five individual bridges S Belt Line Rd. including the ramps that are also being built to the main truss Singleton Blvd. DALLAS 161 bridge. Bridge 1A, 1B, and 1C will all span over SH 114, bridge MacArthur Blvd. MacArthur 30 30 2 will span over the eastbound frontage road, bridge 3 will 180 span over the westbound frontage road and DART orange 2 miles 12 35E line. Bridges 1A, 1B, and 1C, are all 235 feet long. Bridge 2 is 156 feet long and bridge 3 is 180 feet long. Over the five bridges SOURCE: TxDOT research TxDOT graphic there will be 62,838 square feet of bridge deck which will use 5,143 cubic yards of concrete and have 1.4 million pounds OVERVIEW of rebar (reinforcing steel used to strengthen the concrete). The City of Irving will soon have its own bragging rights over An item unique to this bridge will be the concrete and steel a new signature bridge being built by TxDOT. pylon and truss. The four pylons will consist of 325.6 cubic yards of concrete and the steel truss with cable system will weigh Along with the bridge there will be frontage road improvements 357,962 pounds. The pylons will reach 112 feet into the air and and the creation of a new roadway/pedestrian crossing over the steel truss will span over the bridge a total of 504 feet. SH 114 near the former stadium site. The project is expected to take 20 months to substantially complete. This will allow future development of the area. Engineering plans for the “Diamond Interchange” that surrounds the site are expected to be complete in January of 2019. Construction is estimated to begin on that project in the fall of 2019. PROJECT DETAILS Contractor: Webber, LLC Construction Start: March 2, 2018 Estimated Substantial Completion: September 2019 Bid Amount: $39.5 million Funding for the bridge: 20% Federal/80% State TxDOT image Construction begins on the Signature Bridge over SH 114 in Irving. Funding for the aesthetics: 100% City of Irving 0907_040418 SH 114 (IRVING SIGNATURE BRIDGE) • PROJECT FACT SHEET SUMMER • 2018 SH 114 (IRVING SIGNATURE BRIDGE) • PROJECT FACT SHEET SUMMER • 2018 RIVERSIDE DR 354 WALNUT HILL LN 35E E lm F o r k 77 T MANANA DR MANANA DR r in it y IRVING R HARRY HINES BLVD iv e r NORTHWEST DALLAS 348 LUNA RD LUNA GOODNIGHT LN W NORTHWEST HWY LOMBARDY LN CALIFORNIA CROSSING RD 35E RIVERSIDE DR 348 77 12 354 SHADY TRAIL SHADY WILDWOOD DR WILDWOOD DALLAS 114 12 University STORY LN 35E Of Dallas 77 E NORTHGATE DR SH 114 SIGNATURE BRIDGE 114 482 TOM BRANIFF DR E l m F 12 o Elm Fork r Former Texas k D T V r Greenbelt Park Stadium site i IRVING L n B i t y R R E i v T T e N r 183 N E E C C 114 Y 183 Y R R U AIRPORT FRWY U T T N N E E C DALLAS IRVING E AIRPORT FRWY JOHN W CARPENTER FRWY PETERS RD DR MARYLAND 12 CARL RD E GRAUWYLER RD 183 SOURCE: TxDOT research TxDOT graphic PROJECT CONTACTS Michelle Releford Texas Department of Transportation PIO Dallas District 4777 East Highway 80 (214) 320-4485 Mesquite, Texas 75150-6643 [email protected] 0907_040418 SH 114 (IRVING SIGNATURE BRIDGE) • PROJECT FACT SHEET SUMMER • 2018.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages2 Page
-
File Size-