Hazza Bin Zayed Stadium and Mixed Use Development, Al Ain, Abu Dhabi, UAE

Hazza Bin Zayed Stadium and Mixed Use Development, Al Ain, Abu Dhabi, UAE

Project Hazza Bin Zayed Stadium and mixed use development, Al Ain, Abu Dhabi, UAE The Hazza Bin Zayed Stadium in Abu Dhabi has been completed after a 16-month ultra-fast track construction project. Built to FIFA standards, the stadium covers an area of 45,000 square metres with a capacity of 25,000 seats. The scope of the project further included a sports hall, commercial buildings and extensive exterior landscaping. The stadium is part of another further development that covers 500,000 square metres and includes 700 apartments, green spaces, two office buildings, 50 restaurants, shops and a 170-room hotel. The project is the first component of this broader development that will have its effect first on the city of Al Ain, but also on the wider region including the neighboring countries of the Gulf Cooperation Council. Location Al Ain, Abu Dhabi, United Arab Emirates Client AAFAQ Holding Engineer EC Harris Contractor BAM International Contract type Design & Build Contract period June 2012 – December 2013 Contract sum €145 million ‘Ultra-fast track FIFA-standard stadium in Abu Dhabi.’ January 2014 002456 - 235 One of the most characteristic elements of the stadium is the external façade which consists of fabric elements resembling the trunk of a palm tree that also can be lighted by LED lights in 15 different content modes. On the top of the stadium roof, 200 floodlights are fixed to provide the illumination of after-dark soccer games. Due to the extreme temperatures during the hot summer months, the palm bowl shape of the roof also provides pleasant conditions for both the players and the fans. It is one of the stadium’s uniqueness, which is designed in a way that matches can take place in the shadow after 5pm. On the inside, it reveals the complex geometry of its cantilivered steel trusses, which was achieved by using robotic cutting and welding technology. It was a design and build contract. BAM introduced a lot of value engineering proposals which had to be integrated into the design and therefore new building permits were required within the 18 months. BAM International started the project in mid-2012 and remained right on schedule with all aspects of the construction, making use of 10.5 million man hours. At peak there were 400 men staff up to the supervisor level and 4500 labourers on site. baminternational.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us