
From To Thiru. G. Ajay Anand M.F. Sc., The Director, (Infra-2), Assistant Director of Fisheries Ministry of Environment, Forest and Climate Tiruvallur@ Ponneri Change, India Paryavaran Bhawan, Jor Bagh Road, New Delhi-110003. Date: 03/02/2021 Dear Sir, Subject: Submission of Additional Information Sought for the proposed “Construction of Training Walls for Permanent Stability of Bar Mouth” at Pulicat village, Ponneri Taluk, of Thiruvallur District -Environmental Clearance-Reg Reference: 1. ToR vide F.No.10-39/2019-IA-III, dated: 16th October 2019 issued by MoEF&CC. 2. Proposal No IA/TN/NCP/186694/2019; File No 10- 39/2019-IA.III 3. Minutes of the 249th meeting of Expert Appraisal Committee held on 14th December 2020 Adverting to the reference 3rd cited, we submit the Additional Information Sought pertaining to the above project mentioned in the subject for your kind perusal. S.No Query Reply 1. Form-1 for project attracting CRZ Notification, 2011 as per Annexure-IV in Form-1 for project attracting CRZ Notification, the said notification is not available, 2011 as per Annexure-IV is enclosed as which is one of the statutory documents Annexure I as per the CRZ regulations. 2. It was also observed that the proposed As a wetland ecosystem the Pulicat lake area project may affect the migratory bird, is important for the breeding and roosting birds since Pulicat Bird Sanctuary is located and several other fauna and flora. within 10 km of the project site. Therefore, report of the study already It is important for the development authorities conducted by Salim Ali Institute of to note that any construction activity must Ornithology may be submitted. commence and complete before the bird migratory season. M/s. Salim Ali Institute of Ornithology (SACON) has conducted study for assessing the Impact of dredging and opening of the sea mouth into the Pulicat lake at Rayadoruvu village of Vakadu Mandal on the habitat of Pulicat Bird Sanctuary at Andhra Pradesh and Proposed High Level Bridge across Pulicat Lake at Tamil Nadu with Special Focus on Birds, which is very near to the location of site for Permanent Stability of Bar Mouth. So the study by SACON towards migratory bird for the S.No Query Reply Bridge work is enclosed herewith for reference. Necessary mitigation measures must be undertaken to reduce indirect impact on the Pulicat Bar mouth at various phases of development to the surrounding wetland habitat, woody vegetative cover and the overall ecology of the site. The indirect impact may be due to the release of contaminated, polluted or untreated water, debris, or other materials from the construction phase. Abstract of the Study Report conducted by Salim Ali Institute of Ornithology enclosed as Annexure II 3. Data on fishery as to how much As per the marine fish production data from the reduction in fishery has been observed in Fishing Department, fish production capacity past years may be submitted was 12025 during the period 2004-2005, which was reduced to 9498 in 2018-2019. Detailed fishery data is enclosed as Annexure III. Ramanibai Ravichandran, Department of Zoology University of Madras, study which was carried out from September 2013 to August 2015 clearly indicates that fish samples collected were of 83 different fish species, 14 orders and 50 families. In which the major dominant order of the collections were observed as Perciformes which is nearly 44 species out of 83. However, according to the recent survey, the above mentioned fish species in the pulicat lake region are currently moving towards an extinction and they are recently specified as an endangered species in the vicinity. Therefore a serious conservation action/step is to be taken in view of preventing the loss of biodiversity. By opening of Bar mouth the species growth will be enhanced by the flow of Sea water in to the Pulicat Lake. 4. Since the proposal is related to making a Secondary data collected from the previous permanent opening at the bar mouth study highlights, the important trends in annual data on salinity of the lake is also and seasonal differences in mean salinities important, therefore available data on variations (in the range of 21 −36 ppt) as salinity of the lake over the past 10-20 observed in the period 1996–2015.The Study years shall be submitted report by M/s. Harini Santhanam & S Amal Raj (2019), Spatial and temporal analyses of salinity changes in Pulicat lagoon, a Construction of Training Walls for Permanent Stability of Bar Mouth At Pulicat village, Ponneri Taluk, of Thiruvallur District. FORM 1 (I) Basic Information: S.No. Item Details 1 Name of the project Construction of Training Walls for Permanent Stability of Bar Mouth at Pulicat Village, Ponneri Taluk and Thiruvallur District 2 S. No. in the schedule 7 (e) 3. Proposed The length of North training wall is 160m capacity/area/length/tonnage to and South training wall is 150m and be depth 4.5m. handled/command area/lease Total plot area-32501 Sq.m area/number of Wells to be drilled. 4. New/Expansion/Modernization New 5. Existing Capacity Area etc. Nil 6. Category of Project i.e.' A' or 'B' A 7. Does it attract the general The project site located ECO –Sensitive condition? If yes, Area Please specify. 8. Does it attract the specific No condition? If 'yes, Please specify. 9. Location Site Latitude Site Longitude North training wall North training 13°27'55.6"N wall 80°18'58.8"E South training wall South training 13°27'49 "N wall 80°19'5"E North training wall North training end 13°27'58"N wall end South training wall 80°19'4"E end 13°27'52"N South training wall end 80°19'7"E Plot/Survey/Khasra No. -- Village Tehsil Pulicat District Ponneri State Thiruvallur 10. Nearest railway station/airport Ponneri railway station- 19.0 Km (SW) along with Distance in Kms. Pulicat bus stop -5.0 Km (SSW) i | Page 2019 Construction of Training Walls for Permanent Stability of Bar Mouth At Pulicat village, Ponneri Taluk, of Thiruvallur District. 11. Nearest Town, city, District Ponneri -19 km Headquarters Along with distance in Kms. 12. Village Panchayats, Zilla Pulicat Panchayats Parishad, Municipal Corporation, Local body (complete postal Address with telephone nos. to be given) 13. Name of the applicant Government of Tamil Nadu, Department of Fisheries. 14. Registered Address Executive Engineer, Fishing Harbor Project Division,, II floor, Nandanam, Chennai-600035. Tele: 044 – 24330068 Fax: 044 – 24331708 15. Address for correspondence: Name Mr.Chinna Kuppan Designation Assistant Director (Owner/Partner/CEO) Address Fisheries Department, SH-56, Thiruvathiyur Ponneri Road, Ponneri Taluk Thiruvallur District , Pin Code 601204 E-mail E. mail: [email protected] Telephone No. 9443541226 Fax No. 16. Details of Alternative Sites No alternative sites were examined. examined, if any. Location of Department of Ocean Engineering, IIT these sites should be shown on a Madras to visit and identify coastal topo sheet. stretches of Pulicat Lake and suggest suitable location for estuary mouth training works to stabilize the mouth opening. In order to support fisherman livelihood of Pulicat and nearby village, the Fisheries Department, Government of Tamilnadu intends to Construction of Training Walls for Permanent Stability of Bar Mouth at Pulicat which will give access to fishermen in all seasons of the year. 17. Interlinked Projects No ii | Page 2019 Construction of Training Walls for Permanent Stability of Bar Mouth At Pulicat village, Ponneri Taluk, of Thiruvallur District. 18. Whether separate application of No interlinked Project has been submitted? 19. If yes, date of submission No 20. If no, reason No 21. Whether the proposal involves Yes approval / clearance under: if yes, This proposal require CRZ clearance Details of the same And their status to be given. under CRZ 2011 notification. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Order (G.O (D) No 70) Government Order/ Policy Enclosed in Annexure I. relevant/ relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation None pending against the project and /or land in which The project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its Relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, Which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No Information/Checklist confirmation Yes/ Details thereof (with No approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Construction of two training land use, land cover or topography walls to provide Permanent including increase in intensity of Stability of Bar mouth As such, land use (with respect to local land there will temporary change in use plan) land use. iii | Page 2019 Construction of Training Walls for Permanent Stability of Bar Mouth At Pulicat village, Ponneri Taluk, of Thiruvallur District. 1.2 Clearance of existing land, vegetation No Not required and buildings? 1.3 Creation of new land uses? No Not required 1.4 Pre-construction investigations e.g. Yes Topographical and bore houses, soil testing? mathematical survey has been carried out and DPR was prepared by IITM. 1.5 Construction works? Yes Construction of Permanent Stability of Bar mouth will be undertaken. North training wall 160m and south training wall 150m 1.6 Demolition works? No Not required 1.7 Temporary sites used for construction Yes A small area will be utilized works or housing of construction temporarily for construction of workers? sheds for the workers and storage of materials.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages76 Page
-
File Size-