Notice Inviting Tenders

Notice Inviting Tenders

NOTICE INVITING TENDERS Sealed tenders based on item rates issued by Finance Department for District Jhelum forming basis of T.S. Estimates, are hereby invited for the works mentioned below from the Contractors/Firms enlisted in C&W/EDO (W&S) Jhelum in the field of roads works. Tenders Document can be obtained from the office of the undersigned on behalf of District Tender Board constituted by the Government of the Punjab, LG&CD Department vide No SODG (Dev) (LG) 9- 7/2009 through written requests accompanied with attested copies of enlistments/ upto date renewal letters & fee deposit receipts from P.E.C, license, authority letter on letter head of contractor/firm with copy of I.D card of contractor or managing partner of the firm along with dully registered Power of Attorney on payment of the prescribed tender fee. The amounts of tenders/rates should be filled in figures as well as in words and tender should be signed as per general directions given in the tender documents. Tenders will be issued on 14-02-2011 and received upto 18-02-2011 at (11:30 A.M) and will be opened immediately thereafter in presence of all the members of the said District Tender Board & the intending contractors or their representative. Any person can come and witness the tender opening proceeding/process. Conditional tenders and tenders not accompanied with E/Money (2% of estimated cost), copies of registered partnership deed and power of attorney in case of firms, shall not be entertained. The District Tender Board reserve the right of rejecting any or all of the tenders without assigning any reason thereto. For any omission or type mistake in NIT original/basic document shall be consulted and such omissions (if any) shall be rectified in the all right thereof. In case the total tendered amount is less than 5% of the approved estimate/(DNIT) amount, the lowest bidder shall have to deposit an additional performance security in shape of deposit call from any scheduled bank within 15 days of issuance of notice or within the expiry period of bid, which ever is earlier. Estimated Last date Tender S. Completion Tender Name of Work Cost & TS. No & Date for issue opening No Time Fee E/ Money tender Date I MPA’s Development Program 2010-11 Ch. Muhammad Saqlain MPA (PP-24) 1 Rehabilitation of Road from Dhoke 5.400 (M) DO (Roads) JM No. Khalas Khan to Paghwari 1,08,000/- 4 Months 2700/- 14-02-2011 18-02-2011 51-53 dt 24-01-11 Length: 2.44 KM Mehr Muhammad Fayyaz MPA (PP-25) 2 Rehabilitation of Road from G. T. 5.400 (M) DO (Roads) JM No. Road Bura Jungle to Kaluwal Length 1,08,000/- 4 Months 2700/- 14-02-2011 18-02-2011 51-53 dt 24-01-11 2.40 KM Ch. Nadeem Khadim MPA (PP-26) 3 Rehabilitation of Link Road No. 1 0.810 (M) Alnag Nara Road to Village Jagta 16,200/- DO (Roads) JM No. 2 Months 410/- 14-02-2011 18-02-2011 Tehsil & District Jhelum 51-53 dt 24-01-11 Length: 0.41 KM 4 Construction of Missing Link Road 1.386 (M) DO (Roads) JM No. No. 2 in Village Jagta (House of 28,000/- 3 Months 700/- 14-02-2011 18-02-2011 51-53 dt 24-01-11 Allah Ditta) Length: 0.43 KM 5 Construction of Link Road Alang 3.204 (M) DO (Roads) JM No. Nara Road to House of Haji Lal 64,100/- 3 Months 1610/- 14-02-2011 18-02-2011 51-53 dt 24-01-11 Khan Length: 3.204 KM Nawabzada Syed Shamas Haider MPA (PP-27) 6 Construction of Link Road Pither 5.400 (M) DO (Roads) JM No. Kalan to Pither Nadi 1,08,000/- 4 Months 2700/- 14-02-2011 18-02-2011 Length: 1.52 KM 51-53 dt 24-01-11 II Punjab Development Program (MPA’s Package) Ch. Muhammad Saqlain MPA (PP-24) 7 Rehabilitation of Raod from Lubana 8.000 (M) EDO No. 302/D-2D Hail to Matheen Chowk 160,000/- 6 Months 4000 14-02-2011 18-02-2011 Length: 4.00 KM dt 28-01-2011 Mehr Muhammad Fayyaz MPA (PP-25) 8 Construction of PCC Street village 0.699 (M) DO (Roads) JM No. Langerpur (Attique Resi to Dehri 14,000/- 2 Months 350 14-02-2011 18-02-2011 51-53 dt 28-01-11 PCC Street) (L: 698 ft) 9 Construction of Street village 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Dhoke Rajjo (L: 640 ft) 10,000/- 51-53 dt 28-01-11 10 Construction of PCC Road Gujjarpur 1.001 (M) DO (Roads) JM No. 2 Months 510 14-02-2011 18-02-2011 (L: 800 ft) 20,050/- 51-53 dt 28-01-11 11 Construction of PCC Street Village 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Nakki (L: 744 ft) 10,000/- 51-53 dt 28-01-11 12 Construction of Road at Rehana 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Jattan (L: 220 ft) 10,000/- 51-53 dt 28-01-11 13 Construction of PCC Street at Jada 0.800 (M) DO (Roads) JM No. (from H. Farman to Mosque, from 16,000/- 2 Months 400 14-02-2011 18-02-2011 51-53 dt 28-01-11 House Abid to Sajid) (L: 710 ft) 14 Construction of R/wall 10’ high 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Dhoke Padhal (L: 115 ft) 10,000/- 51-53 dt 28-01-11 15 Construction of PCC Street Village 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Maldev (L: 812 ft) 10,000/- 51-53 dt 28-01-11 16 Construction of Nullah Village Chak 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Isa (L: 520 ft) 10,000/- 51-53 dt 28-01-11 17 Construction of PCC Street at 0.500 (M) Village Jhangir (from H. Gullu to 10,000/- DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Fayyaz Ch. Azeez to Hanif, Gulu 51-53 dt 28-01-11 Chowk (L:573 ft) 18 Construction of Water Pond at 1.500 (M) DO (Roads) JM No. 3 Months 750 14-02-2011 18-02-2011 Village Chak Doulat 30,000/- 51-53 dt 28-01-11 19 Construction of PCC Street Nazir 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Butt H. at Village Ghagar (L:330 ft) 10,000/- 51-53 dt 28-01-11 Ch. Nadeem Khadim MPA (PP-26) 20 Construction of PCC Road i/c Nullah 2.000 (M) DO (Roads) JM No. at Wara Ahmed Dakhli Jamarghal 40,000/- 3 Months 1000 14-02-2011 18-02-2011 51-53 dt 28-01-11 (L:1300 ft) 21 Construction of PCC Street Village 0.500 (M) DO (Roads) JM No. Nakka Kalan (Chowk to General 10,000/- 2 Months 250 14-02-2011 18-02-2011 51-53 dt 28-01-11 Tassawr Resi) (L: 418 ft) 22 Construction of PCC Street Village 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Mamyan (L:730 ft) 10,000/- 51-53 dt 28-01-11 23 Construction of 3’ span culvert i/c 2.200 (M) DO (Roads) JM No. approaches Village Kantrila 44,000/- 3 Months 1100 14-02-2011 18-02-2011 51-53 dt 28-01-11 (L: 248 ft) 24 Construction of Street Village 0.600(M) DO (Roads) JM No. Langerpur (Aslam Butt to Ashraf 12,000/- 2 Months 300 14-02-2011 18-02-2011 51-53 dt 28-01-11 (late) Shop Phase-II) (L:373 ft) 25 Construction of PCC Street Major 0.800 (M) DO (Roads) JM No. Nawaz Shaheed Colony Jhelum (Sh. 16,000/- 2 Months 400 14-02-2011 18-02-2011 51-53 dt 28-01-11 Ijaz PCC Street) (L:570 ft) 26 Construction of PCC Road (L:525 ft) 1.400 (M) DO (Roads) JM No. 3 Months 700 14-02-2011 18-02-2011 Arsal Town i/c Nullah (L:1350 ft) 28,000/- 51-53 dt 28-01-11 27 Restoration of Dismantled Road in 11.574 (M) EDO No. 137/D-2G Jhelum City for laying of sewer pipe 4 Month 9610 14-02-2011 18-02-2011 2,31,500/- Dated 13-01-2011 line (cutting done by PHED Jhelum) Nawabzada Syed Shamas Haider MPA (PP-27) 28 Construction of PCC Street and Drain at Jalalpur Sharif from House Lumberdar to House Haji 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 Muhammad Walayat, from Main 10,000/- 51-53 dt 28-01-11 Street House Imran Khan to House of Mistry Bashir (L:740 ft) 29 Construction of PCC Street and Drain Dheri Arraian & Dhok Bagh 0.500 (M) DO (Roads) JM No. 2 Months 250 14-02-2011 18-02-2011 from Dhoke Bagh to House Attique 10,000/- 51-53 dt 28-01-11 (L:681 ft) 30 Construction of PCC Street and Drain at Pindi Saidpur from House Muhammad Nazir to Malik Majeed, 1.000 (M) DO (Roads) JM No.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us