
EOE (NO.75) PTY LIMITED ABN: 95 006 829 787 Ardlethan Tin Mine Traffic Impact Assessment Prepared by Barnson Pty Ltd December 2016 Specialist Consultant Studies Compendium Volume 1, Part 4 This page has intentionally been left blank EOE (NO.75) PTY LIMITED ABN: 95 006 829 787 Traffic Impact Assessment Prepared for: R.W. Corkery & Co. Pty Limited 62 Hill Street ORANGE NSW 2800 Tel: (02) 6362 5411 Fax: (02) 6361 3622 Email: [email protected] On behalf of: EOE (No.75) Pty Limited ABN: 95 006 829 787 Level 2, 53 Berry Street NORTH SYDNEY NSW 2060 PO Box 1506 NORTH SYDNEY NSW 2059 Telephone: (02) 9959 5599 Fax: (02) 9959 5577 Email: [email protected] Prepared by: Barnson Pty Ltd "Riverview Business Park" Unit 1, 36 Darling Street DUBBO NSW 2830 Tel: (02) 1300 138 657 Email: [email protected] Ref No: : 25802-TIA01_B December 2016 Note: A colour version of this report is available on the digital version of this document This Copyright is included for the protection of this document COPYRIGHT © Barnson Pty Ltd 2016 and © EOE (No.75) Pty Limited 2016 All intellectual property and copyright reserved. Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright Act, 1968, no part of this report may be reproduced, transmitted, stored in a retrieval system or adapted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without written permission. Enquiries should be addressed to Barnson Pty Ltd. 4 - 2 SPECIALIST CONSULTANT STUDIES EOE (NO.75) PTY LIMITED Part 4 – Traffic Impact Assessment Ardlethan Tin Mine Report No. 754/09 Traffic Impact Assessment for the Rehabilitation and Tailings Reprocessing Project Ardlethan Tin Mine Client: EOE (NO.75) PTY LIMITED Dec-16 (Our Reference: 25802-TIA01_B) (Client Reference: 94502) © Barnson Pty Ltd 2016. Confidential. Subject to the Barnson Terms of Appointment EOE (NO.75) PTY LIMITED SPECIALIST CONSULTANT STUDIES Ardlethan Tin Mine Part 4 – Traffic Impact Assessment Report No. 754/09 LIST OF CONTENTS EXECUTIVE SUMMARY ................................................................................................................... 4-8 ABBREVIATIONS ............................................................................................................................. 4-9 1.0 INTRODUCTION .................................................................................................................. 4-10 1.1 Project Background................................................................................................... 4-10 1.2 Purpose and Scope ................................................................................................... 4-12 1.3 Proposed Development ........................................................................................... 4-12 1.3.1 Site Establishment ................................................................................................ 4-13 1.3.2 Operations ............................................................................................................ 4-13 1.3.2.1 Tailings Extraction .......................................................................................... 4-13 1.3.3 Tailings Reprocessing .......................................................................................... 4-15 1.3.3.1 Rehabilitation (Tailings Deposition) ............................................................ 4-15 1.3.4 Decommissioning ................................................................................................ 4-15 2.0 EXISTING KEY INFRASTRUCTURE ....................................................................................... 4-16 2.1 Road Network ............................................................................................................. 4-16 2.1.1 Function and Geometry .................................................................................... 4-17 2.1.1.1 Newell Highway ............................................................................................. 4-17 2.1.1.2 Burley Griffin Way .......................................................................................... 4-17 2.1.1.3 Mirrool Street/Ariah Street .......................................................................... 4-18 2.1.1.4 Bygoo Road .................................................................................................. 4-19 2.1.1.5 Tin Mines Road .............................................................................................. 4-20 2.1.2 Intersections ......................................................................................................... 4-21 2.1.2.1 Newell Highway/Burley Griffin Way intersection ................................... 4-21 2.1.2.2 Burley Griffin Way/Mirrool Street intersection ......................................... 4-22 2.1.2.3 Ariah Street/Bygoo Road Intersection ..................................................... 4-23 2.1.2.4 Bygoo Road/Tin Mines Road Intersection .............................................. 4-24 3.0 CONDITION......................................................................................................................... 4-25 3.1.1 Assumed Existing Pavement Design ............................................................... 4-25 3.1.2 New Pavements ................................................................................................. 4-26 3.1.3 Visual Condition Inspection Findings .............................................................. 4-26 4.0 FUTURE KEY INFRASTRUCTURE .......................................................................................... 4-34 5.0 TRAFFIC FORECASTING ..................................................................................................... 4-36 5.1 Existing Traffic Counts ................................................................................................ 4-36 5.2 Traffic Growth ............................................................................................................. 4-36 5.3 Background Traffic – Year of Opening (2017) and Design Year (2033) ......... 4-36 5.4 Traffic Generation ....................................................................................................... 4-37 5.4.1 Establishment Traffic/Decommissioning ......................................................... 4-37 5.4.2 Operational Traffic ............................................................................................. 4-38 5.4.3 Employee and General Traffic ........................................................................ 4-38 5.4.3.1 Staff Car Parking .......................................................................................... 4-38 5.4.4 Traffic Generation Summary ............................................................................ 4-38 5.5 Traffic Distribution ....................................................................................................... 4-38 4 - 4 SPECIALIST CONSULTANT STUDIES EOE (NO.75) PTY LIMITED Part 4 – Traffic Impact Assessment Ardlethan Tin Mine Report No. 754/09 6.0 ROAD AND INTERSECTION ASSESSMENT ....................................................................... 4-39 6.1 Road Performance – Level of Service ................................................................... 4-39 6.2 Intersection Performance ........................................................................................ 4-40 6.3 Geometric Assessment ............................................................................................. 4-40 6.3.1 Newell Highway, Burley Griffin Way and Bygoo Road ............................... 4-40 6.3.2 Tin Mines Road .................................................................................................... 4-41 7.0 RECOMENDATIONS ........................................................................................................... 4-43 7.1 Road Upgrades .......................................................................................................... 4-43 7.1.1 Capacity .................................................................................................................. 4-43 7.1.2 Condition ............................................................................................................. 4-43 7.1.3 Safety ........................................................................................................................ 4-43 7.1.3.1 Road Geometry ............................................................................................ 4-43 8.0 CONCLUSION ..................................................................................................................... 4-44 8.1 Secretary’s Environmental Assessment Requirements ....................................... 4-44 8.2 Mitigation Summary................................................................................................... 4-45 9.0 REFERENCES ........................................................................................................................ 4-46 4 - 5 EOE (NO.75) PTY LIMITED SPECIALIST CONSULTANT STUDIES Ardlethan Tin Mine Part 4 – Traffic Impact Assessment Report No. 754/09 LIST OF FIGURES Figure 1 –Location of Ardlethan Tin Mine. ............................................................................. 4-11 Figure 2 –Ardlethan Tin Mine Site Layout. .............................................................................. 4-14 Figure
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages58 Page
-
File Size-