Maps of JICA Major Projects Egypt (P)Technical Cooperation (D)Development Study /Technical Cooperation for Development Planning (L)Loan (G)Grant Aid

Maps of JICA Major Projects Egypt (P)Technical Cooperation (D)Development Study /Technical Cooperation for Development Planning (L)Loan (G)Grant Aid

as of July 1, 2020 Maps of JICA Major Projects Egypt (P)Technical Cooperation (D)Development Study /Technical Cooperation for Development Planning (L)Loan (G)Grant Aid <Cairo and it's environs> (P*) The Project for Enhancement of Technical Secondary Education/2017.4-2021.2 (L) Greater Cairo Metro Line No.4 Phase I Project/2012.3 (G) The Project for Construction of Outpatient Facility at Cairo University Specialized Pediatric Hospital /2015.12 <Alexandria and it's environs> (P) Egypt-Japan University of Science and Technology (E-JUST) Project Phase3/2019.2-2025.1 (L) Borg El Arab International Airport Extension Project/2016.2 (G) The Project for Procurement of Education and Research Equipment for Egypt-Japan University of Science and Technology (E-JUST)/2016.7 (G) The Project for Procurement of Education and Research Equipment for Egypt-Japan University of Science and Technology (E-JUST) (Phase 2)/2017.12 <Alexandria, Cairo, North Delta> (L) Electricity Distribution System Improvement Project/2016.2 <Cairo, Alexandria> (P) Project forImprovement of Inclusion of People with Disabilities through Improvement of Information Accessibility/2019.3-2021.3 (L) Electricity Sector Rehabilitation and Improvement Project/2016.10 <Cairo, Luksor, Alexandria> Kafr el- Alexandria Sheikh ○ (P*) Grand Egyptian Museum Joint Cooperation Museum ○ New Borg El Arab City Activities Project (GEM-JCMAP)/2016.11-2021.3 Cairo <Cairo (Giza)> Giza○ (P*) Capacity Development Project for Management and Exhibition of Grand Egyptian Museum /2016.4-2020.9 Minya (L) The Grand Egyptian Museum Construction Project (II) /2016.10 ○ Hurghada Asyut <Hurghada> Luksor ○ (L) Hurghada Photovoltaic Power Plant Project/2016.2 (L) The Project for Construction of the New Dirout Group of Regulators/2015.3 <All Area/Wide Area> (P) The Project for Creating Environment for Quality Learning /2017.3-2021.2 (P) The Project for Quality Improvement of Early Childhood Development /2017.6-2020.10 100km (P) Project for Quality Improvement of Hospitals/2019.4-2024.4 (P) Project for Capacity Development on Energy Efficiency and Conservation/2020.1-2022.2 (L) Egypt-Japan Education Partnership (EJEP): Human Resource Development Project/2017.5 Technical Cooperation : Ongoing and planned (R/D signed) projects, *Technical Assistance Project related to ODA Loan Development Study /Technical Cooperation for Development Planning: Ongoing projects Loan : Ongoing and planned (L/A signed) projects Grant Aid : Ongoing projects (G/A or E/N signed).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us