Open House Display Boards

Open House Display Boards

Joint Lead Agencies Cooperating Agency U.S Bureau of Reclamation U.S Department of the Utah Reclamation Central Utah Water Interior, Central Utah Mitigation and Conservancy District Project Completion Act Conservation Office Commission ULS of the Bonneville Unit Colorado River Storage Project Develop Colorado River water Authorized by Congress April 11, 1956 Central Utah Project Develop a portion of Utah’s Colorado River water under CRSP. The CUP is divided into 6 units: Bonneville, Jensen, Vernal (unbuilt Upalco, Uintah, Ute Indian) Congress passes P.L. 102‐575 in 1992 and authorizes the Central Utah Project Completion Act (CUPCA) for completion of the Bonneville Unit Bonneville Unit The Bonneville Unit is part of the CUP and is divided into 6 systems: Starvation Collection, Strawberry Aqueduct and Collection, Diamond Fork, Municipal and Industrial, Wasatch County Water Efficiency Project, and Utah Lake Drainage Basin Water Delivery (ULS) Reaches •Spanish Fork (currently under construction) •South Fields •Salem •Payson •Spring Lake •Santaquin • ULS Environmental Impact Statement (ULS EIS) – completed in 2005 • ULS EIS Evaluated 54‐inch Pipeline • South Fields Reach is proposed to be a 60‐inch pipeline • Potential Alignment Changes • No Action Alternative was evaluate in the ULS EIS • Proposed Action includes evaluation of two alternatives and an option •Air Quality •Land Use Policy and Plans •Soils and Geotechnical •Visual Resources •Threatened and Endangered Species •Cultural Resources •Wildlife •Recreation •Water Resources •Noise •Water Quality •Transportation/Access •Groundwater •Energy •Wetlands and Waters of the U.S. •Hazardous Waste •Economics •Vegetation and Invasive Species •Agricultural Resources •Social/Environmental Justice •Wild and Scenic Rivers •Public Health and Safety •Indian Trust Assets Alternatives •Alternative A – 400 East •Alternative B – Woodland Hills Drive •No Action Alternative – ULS EIS •Option – Salem and South Fields Canal •All alternatives include this Option All Alternatives Include an Option on Powerhouse Road or on Salem and South Fields Canal Comment Form: southfields.cuwcd.com Email: [email protected] Mail: Central Utah Water Conservancy District Attn: Sarah Sutherland 355 West University Parkway Orem Utah, 84058‐7303 Comments Due Submit Comments Tonight by Friday October 6, 2017.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us