HS2 Environmenta Response by the HS2 Environmental Statement

HS2 Environmenta Response by the HS2 Environmental Statement

HS2 Environmental Statement Consultation Response by the London Borough of Hillingdon 1. Executive Summary 9 1.1. Objections and Concerns 9 1.2. Summary of Significant Effects: Route Wide 10 1.3. Summary of Significant Effects: Hillingdon Specific 11 1.4. Summary of Hillingdon’s Suggested Mitigation 14 2. Improper and Unfair Decision Making 18 2.1. Parliament as a Planning Authority 18 2.2. Decision Making Process 18 2.3. Lack of Scrutiny of Assessment 20 2.4. Conclusion 22 3. Economic Merits of HS2 and Alternatives 23 3.1. Background 23 3.2. Optimised Alternative 23 3.3. Alternative Option: Route 4 24 3.4. There will be no Re-balancing of the UK Economy 25 3.5. Capacity of Trains 27 3.6. North of Birmingham 27 3.7. Additional Costs 28 3.8. Conclusion 28 4. Rushed and Inadequate Assessment 29 4.1. Background 29 4.2. Construction Route through Uxbridge Golf Course 29 4.3. Lack of details about West Ruislip Railhead 30 4.4. Public Rights of Way Diversions 32 4.5. Grassland Mitigation 33 4.6. General Understanding of the Construction Routes 34 4.7. Impacts from the Dumping of Soil 35 4.8. Northolt Tunnel and Earthworks Main Compound 37 4.9. Further Implications for Public Resources 38 5. Non Compliance with HS2 Ltd’s Own Design Aims 39 5.1. Design Aims 39 5.2. Conclusion 41 2 6. Non Compliance with EIA Regulations 43 6.1. Background 43 6.2. Schedule 4 Requirements 43 6.3. Conclusion 46 7. Environmental Statement Comments 48 7.1. Approach to Comments 48 7.2. Hillingdon as Local Authority and Landowner 48 7.3. Use of Maps 48 8. HS2 in Hillingdon 50 8.1. Areas lost to HS2 50 9. Sustainable Placement of Excavated Material 53 9.1. Background 53 9.2. Location of Excavated Material – North of New Years Green Lane 53 9.3. Location of Excavated Material – West of Breakspear Road South 54 9.4. Location of Excavated Material – North of Harvil Road 55 9.5. Appearance 56 9.6. Conclusion 56 9.7. London Borough of Hillingdon Proposal 56 10. Heathrow Spur 57 10.1. No Business Case 57 11. Route Wide Effects: Carbon Emissions 59 11.1. Conclusions from the Final ES 59 11.2. Problems with the Assessment 59 11.3. Problems with Assessing Flights 60 11.4. Conclusion 61 12. Agriculture 62 12.1. General Comments 62 12.2. CFA6 62 12.3. CFA7 62 12.4. Conclusion 63 13. Air Quality 64 3 13.1. General Comments 64 13.2. South Ruislip to Ickenham Community Forum Area 6 65 13.3. Assessment of Significance 66 13.4. Colne Valley Community Forum Area 7 68 13.5. Assessment of Significance 68 13.6. Operational Effects 69 13.7. Proposed Mitigation 70 14. Community 71 14.1. General Comments 71 14.2. Public Rights of Way 71 14.3. CFA6 79 14.4. Assessment of Significance 80 14.5. CFA7 80 14.6. Cumulative Effects CFA6 and 7 83 14.7. Unassessed Impacts in CFA6 and 7 84 14.8. Conclusion 84 14.9. Proposed Mitigation 84 15. Cultural Heritage 86 15.1. General comments 86 15.2. Colne Valley 86 15.3. Archaeology 88 15.4. Conclusion 90 15.5. Proposed Mitigation 90 16. Ecology 92 16.1. General Comments 92 16.2. CFA6 and 7 96 16.3. Species 97 16.4. HS2 Ltd proposed Mitigation 97 16.5. Conclusion 98 16.6. Proposed Mitigation 99 17. Landscape 100 4 17.1. General Comments 100 17.2. CFA6 104 17.3. CFA7 106 17.4. Conclusion 109 17.5. Proposed Mitigation 109 18. Land Quality 111 18.1. General Comments 111 19. Socio Economic 114 19.1. General 114 19.2. Local impacts 115 19.3. CFA6 118 19.4. CFA7 118 19.5. Conclusion 118 19.6. Proposed Mitigation 119 20. Sound and Vibration 120 20.1. General Comments 120 20.2. Operational assessment (SV-004-006) 122 20.3. Volume 5 Technical Appendices (SV-001-000) 123 20.4. CFA6 125 20.5. CFA7 127 20.6. Conclusion 130 20.7. Proposed Mitigation 130 21. Traffic and Transport 132 21.1. General Comments 132 21.2. CFA6 134 21.3. Significant Effects in CFA6 and 7 140 21.4. Conclusion 142 21.5. Proposed Mitigation 142 22. Water Resources 143 5 22.1. General 143 22.2. CFA6 146 22.3. Colne Valley CFA7 149 22.4. Conclusion 150 22.5. Proposed Mitigation 151 23. Additional Topics 152 23.1. Electromagnetic Interference 152 23.2. Waste 152 24. Health Impact Assessment 155 24.1. General points 155 24.2. Employment, economy and health 156 24.3. Housing and health 157 24.4. Noise 157 24.5. Air quality 158 24.6. Local environment 159 24.7. Transport 159 24.8. Conclusions 160 25. Conclusion 161 25.1. Objection in Principle 161 25.2. Decision Making 161 25.3. Quality of the ES 161 25.4. Proposed Mitigation 162 26. London Borough of Hillingdon Landowner Response 164 26.1. Introduction 164 26.2. Petitioning 165 26.3. Fairness of Decision Making 165 27. General Observations 166 6 27.1. Introduction 166 27.2. Quality of roads 166 27.3. Flood Risk Management 166 27.4. Severance of agricultural land 167 27.5. Footpaths and diversions 167 27.6. Residual Noise Impacts on Hillingdon land 168 27.7. Alternative recreational offerings 170 28. Ruislip Golf Course and Club House 171 28.1. Background 171 28.2. Impacts of HS2 171 29. Park Lodge Farm (including Dews Farm) 176 29.1. Background 176 29.2. Impact of HS2 176 30. Hillingdon Outdoor Activity Centre [HOAC] 183 30.1. Background 183 30.2. Impact of HS2 183 31. Denham Quarry 189 31.1. Background 189 31.2. Impact of HS2 190 32. Uxbridge Golf Course 193 32.1. Background 193 32.2. Impact of HS2 193 33. Other Land Impacted 197 33.1. Bourne Farm 197 33.2. Scout Hut, New Pond Hall 198 33.3. Land to the rear of 93 Bridgwater Road 198 33.4. New Pond Parade Shops 198 33.5. Priors Farm 200 33.6. Dews Lane and Dews Farm Sand Pits 201 33.7. Additional Concerns 202 34. Conclusion 203 34.1. Main Concern 203 7 It is the intention that Hillingdon will lodge a petition against the Bill, and this response to the Environmental Statement is without prejudice to anything that may be said in the petition. Hillingdon also fully reserves its right to raise any additional points in relation to the Environmental Statement in the petition and indeed at other stages of the HS2 process as it deems appropriate. 8 1. Executive Summary 1.1. Objections and Concerns 1.1.1. The London Borough of Hillingdon will not benefit from HS2 in any way. There will be up to 10 years of disruption during construction along with the long term effects of having a high speed rail line run through relatively unspoiled landscape. 1.1.2. HS2 Ltd and the Government have never presented a case that all the negative impacts will be outweighed by the benefits. The business case is entirely questionable and this environmental statement (ES) unwittingly presents further evidence that the rhetoric from the Government about balancing the economy or increasing the capacity is also flawed. 1.1.3. The questionable business case must be judged against the environmental effects of the scheme which are set out in the ES. The Council considers the assessment submitted to be of a particularly poor standard. There are omissions, misrepresented effects, its presentation is deliberately misleading, and the findings are scattered across a vast array of documents. This is far from reflective of a multi billion pound public project. 1.1.4. The ES finds that the scheme will have significant adverse effects as set out below. It provides no clear benefits. In normal planning circumstances, there would be no likelihood that this scheme would be approved based on the poor assessment and environmental conclusions. 1.1.5. However, it would appear that the quality of the ES is immaterial to HS2 Ltd and in turn the Government because this scheme will not be processed through normal planning routes. The decision to go through a Hybrid Bill allows HS2 Ltd to present an inadequate assessment and an unacceptable scheme safe in the knowledge there is no independent expert scrutiny from a public inquiry. The decision to amend standing Order 22a requires an independent assessor which is misleading, since all they are required to do is summarise the consultation responses, rather than understand the implications or provide any technical advice. 1.1.6. Parliament will debate the scheme with no independent expert analysis of the 50,000 pages of ES, or the responses from interested parties and the public. The whole approach is further undermined by the fact that many senior ministers appear to have made up their mind and lobbied for support for the scheme long before the ES was 9 submitted. For this reason, the Council does not believe that HS2 will get a fair, impartial and technical hearing which the public deserve. 1.1.7. Finally, aside from the decision making process, the Council is disappointed by the quality of the assessment. It has clearly been rushed through to meet a contrived deadline which has resulted in a poorly evidenced and inappropriately presented assessment. The budget for designing the scheme has already significantly overrun by millions. However, due to the failings of the scheme, the Council will now have to use its own funds to seek improvements to the scheme or to complete the design work for HS2 Ltd through the petitioning stages.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    203 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us