Urban Development

Urban Development

URBAN DEVELOPMENT VISION: “Make cities engine of economic growth through planned urbanization and provision of clean drinking water & adequate sanitation services, affordable housing and development of open public spaces in the major urban cities of the Punjab”. SECTOR POLICY: Urban Development sector includes the following major policy areas: 1. Define city boundaries and streamline functional and operational alignments of Municipal Corporations, Development Authorities (DAs), Water & Sanitation Agencies (WASAs) and Traffic Engineering & Planning Agency (TEPA). 2. Construction of low cost houses for the poor masses. 3. Installation of consumer water meters to mitigate non-revenue water (NRW). 4. Master Planning of cities and ensuring integrated cities development strategies to regulate development and direct future investments. 5. Sewerage / Waste Treatment Plants to be made an integral part of all future sewerage schemes. 6. Policy shift from ground water to surface water provision. 7. Attracting private sector to invest in public infrastructure project through public private partnerships OBJECTIVES: 1. Planned urbanization to cater the surging trend of migration from rural to urban areas. 2. Provision of clean drinking water 3. Improved sanitation services for safe disposal of waste water 4. Installation of waste water treatment plant to comply Punjab environmental quality standards and safe ground water from contamination 5. Promote physical health by establishment of model sports complexes 6. Mega infrastructure projects in urban areas for smart traffic management 7. Construction of low cost houses to shorten the gap between surging demand and constraint supply 8. Conservation of ground water through shifting from ground water to surface water treatment plant 475 TRENDS OF ALLOCATIONS (LAST 5 YEARS): (Rs. In millions) Budget FY Estimates Budget Allocations 2015-16 16,060 20,000 17,200 16,060 16,433 2016-17 17,200 15,000 13,500 2017-18 16,433 10,000 5,000 2018-19 5,000 5,000 0 2019-20 13,500 2015-16 2016-17 2017-18 2018-19 2019-20 STRATEGIC INITIATIVES IN ADP 2019-20: 1. Construction of Rawalpindi Ring Road at the cost of Rs.44 billion. 2. Construction of Eastern Wastewater Treatment Plant 45 MGD of Faisalabad City Phase-I (DANIDA Assisted), costs Rs.19.330 billion 3. A comprehensive package of amounting Rs.7,000 million has been ear-marked for (a) replacement of outlived sewer lines (b) sewer lines for un-served areas (c) replacement of outlived water supply pipelines and (d) water supply pipelines for un- served areas in Multan 4. Flyover at Nadirabad phatak to industrial estate Multan will be constructed with an amount of Rs.1,000 million to eliminate the traffic congestion in the Multan city. 5. Lahore Water and Waste Water Management Project - Construction of Surface Water Treatment Plant at BRBD Canal Lahore, costs Rs.20 billion 6. Distribution Centre, Rehabilitation of Old Jhal Khanaua Water Treatment Plant Phase-I costing Rs.6.972 billion for 3 MGD water/day will be constructed with grant in aid from JICA. 7. Remodeling of Ammar chowk Rawalpindi with an amount of Rs.754.29 million will be conducted for smooth traffic management in that area. 8. Consumer water meters will be installed in all WASASs through public private partnership mode for conservation of water and reduction in non-revenue water. 9. Construction of flyover at shshkam chowk Lahore has been proposed to be constructed through public private partnership mode. 476 MAJOR TARGESTS FOR ADP 2019-20: 1. 10 sewerage schemes by WASA (Southern Punjab), costs Rs. 28.17 billion. 2. Construction of Multan Southern Bypass (Dual Carriageway) along with Service Road from LMQ Road to Bahawalpur Chowk including Railway Over Head Bridge Multan, costs Rs. 17.87 billion. 3. Widening and improvement of road from MDA Chowk to Dera Adda Chowk Multan (Dual Carriageway), costs Rs. 574.719 million. 4. Establishment of Sports Complex Model Bazar China Scheme, Lahore (LDP), costs 490.127 million. 5. Construction of Road along Qila Mian Singh Minor from Alam Chowk to Gondlanwala Road to Samanabad Chungi, District Gujranwala, costs Rs. 490.127 million. 477 URBAN DEVELOPMENT: SUMMARY (PKR Million) Provision for 2019-20 No. of Projection for Projection Type / Sub Sector G. Total Schemes Capital Revenue Foreign Aid 2020-21 for 2021-22 (Cap + Rev) ON-GOING SCHEMES BDA 2 0.000 83.520 0.000 83.520 0.000 0.000 FDA 15 0.000 697.342 0.000 697.342 594.166 235.209 FMDA 8 0.000 62.988 0.000 62.988 303.666 167.289 Foreign Aided Projects 1 0.000 30.000 2,589.243 2,619.243 2,000.000 746.515 GDA 4 0.000 128.911 0.000 128.911 357.768 94.782 LDA 11 0.000 822.028 0.000 822.028 1,241.438 695.000 MDA 5 0.000 177.767 0.000 177.767 100.000 75.000 PHA D.G. Khan 7 0.000 235.638 0.000 235.638 134.514 0.000 PHA-Faisalabad 1 0.000 0.750 0.000 0.750 0.000 0.000 PHA-Lahore 2 0.000 11.190 0.000 11.190 0.000 0.000 RDA 5 0.000 261.657 0.000 261.657 240.000 75.000 WASA FDA 10 0.000 176.345 0.000 176.345 92.485 20.000 WASA GDA 6 0.000 318.089 0.000 318.089 519.327 130.000 WASA LDA 18 0.000 1,069.467 0.000 1,069.467 4,303.290 3,909.667 WASA MDA 8 0.000 491.245 0.000 491.245 402.975 0.000 WASA RDA 5 0.000 490.000 0.000 490.000 2,409.120 1,736.585 Total: ON-GOING SCHEMES 108 0.000 5,056.937 2,589.243 7,646.180 12,698.749 7,885.047 NEW SCHEMES DGK Development Authority 1 0.000 20.000 0.000 20.000 30.000 0.000 Foreign Aided Projects 5 0.000 2.500 2.500 5.000 0.000 0.000 GDA 2 0.000 45.000 0.000 45.000 167.600 160.000 HUD & PHED 1 0.000 60.000 0.000 60.000 0.000 0.000 LDA 5 0.000 70.000 0.000 70.000 205.000 209.012 MDA 5 0.000 115.000 0.000 115.000 650.000 814.690 PHA Bahawalpur 1 0.000 10.000 0.000 10.000 0.000 0.000 PHA-Lahore 1 0.000 5.000 0.000 5.000 20.000 25.000 PHATA 2 0.000 285.250 0.000 285.250 1,237.000 214.750 RDA 3 0.000 4,070.000 0.000 4,070.000 442.215 352.215 WASA FDA 2 0.000 50.000 0.000 50.000 3,049.180 1,983.000 WASA GDA 2 0.000 39.246 0.000 39.246 80.000 70.754 WASA LDA 21 0.000 373.324 0.000 373.324 831.118 165.000 WASA MDA 8 0.000 656.000 0.000 656.000 2,670.000 2,370.829 WASA RDA 4 0.000 35.000 0.000 35.000 770.000 10.000 Total: NEW SCHEMES 63 0.000 5,836.320 2.500 5,838.820 10,152.112 6,375.249 478 URBAN DEVELOPMENT: SUMMARY (PKR Million) Provision for 2019-20 No. of Projection for Projection Type / Sub Sector G. Total Schemes Capital Revenue Foreign Aid 2020-21 for 2021-22 (Cap + Rev) PPP PROJECT PPP 15 0.000 15.000 0.000 15.000 0.000 0.000 Total: PPP PROJECT 15 0.000 15.000 0.000 15.000 0.000 0.000 Grand Total 186 0.000 10,908.257 2,591.743 13,500.000 22,850.861 14,260.296 479 Urban Development (PKR Million) Accum. Provision for 2019-20 MTDF Projections Throw fwd GS Scheme Information Est. Cost Exp. G.Total Beyond No Scheme ID / Approval Date / Location Cap. Rev. 2020-21 2021-22 June, 19 (Cap.+Rev.) June, 2022 1 2 3 4 5 6 7 8 9 10 ON-GOING SCHEMES BDA 4635 Construction of Road from One Unit 127.311 47.000 0.000 80.311 80.311 0.000 0.000 0.000 Chowk to Kanju Chowk Bahawalpur City (L 1.6 Km) 01021700192 / 01-07-2017 / Bahawalpur 4636 Construction of Waiting Shed at 24.836 21.627 0.000 3.209 3.209 0.000 0.000 0.000 Bahawalpur City 01021703899 / 19-08-2017 / Bahawalpur Total: BDA 152.147 68.627 0.000 83.520 83.520 0.000 0.000 0.000 FDA 4637 Faisalabad Link Roads Development 695.500 518.000 0.000 30.000 30.000 0.000 0.000 0.000 Programme Links No. 1,5,6,7,13,14,15 (10% Cost Sharing by CDGF). 01091500829 / 26-01-2016 / Faisalabad 4638 Construction of Service Road from 346.910 263.805 0.000 25.605 25.605 57.500 0.000 0.000 Abdullah Pur to Gatwala along RB Canal, Faisalabad. 01091700149 / 01-07-2017 / Faisalabad 4639 Construction of Under Passes At 1,280.209 245.000 0.000 450.000 450.000 200.000 235.209 150.000 Kashmir Bridge Along Canal Faisalabad. 01091700150 / 01-07-2017 / Faisalabad 4640 Establishment of Sports Complex at 487.500 87.500 0.000 150.000 150.000 250.000 0.000 0.000 Faisalabad City (LDP) 01091800048 / 05-01-2018 / Faisalabad 4641 Construction of PCC different streets in 15.000 13.125 0.000 1.875 1.875 0.000 0.000 0.000 Muhammad abad,Haseeb Shaheed colony,Chamanzar colony,Satellite colony,Himatpura, District Faisalabad 01091703718 / 11-09-2017 / Faisalabad 4642 Construction of PCC/Road and 15.000 13.250 0.000 1.750 1.750 0.000 0.000 0.000 boundary wall in Peoples Colony No.2.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us