RTSP Template

RTSP Template

Washington Metropolitan Area Transit Authority Regional Transit System Plan (RTSP) Summary of Projects, Plans, and Strategies Analyzed As Part of the RTSP 2040 Base Case Constrained Long Range Plan (CLRP) Metro 2025 – District of Columbia – 100% 8-car trains • Anacostia Streetcar Phase 1 – Priority Corridor Network service improvements • K Street Busway from CLRP • DC Streetcar - H St/Benning Rd NE – Metro Center/Gallery Place Pedestrian • Tiger Grant Bus Priority Improvements Passageway – Maryland – Farragut North/Farragut West Pedestrian Passageway • Viers Mill Road Busway – Blue Line stub with 2nd Rosslyn Station • Corridor Cities Transitway: – Bus Fleet expansion for non-PCN routes • Purple Line: – Virginia Other Elements • Cherry Hill VRE Station – Round 8.2 Land Use • Columbia Pike Streetcar – Increase train frequencies to maximum • Crystal City Potomac Yard Bus Way supported by infrastructure • I-495 Express Lanes Transit Service – Removed 2020 capacity constraint • Van Dorn Busway – Modified bus routes to connect with CLRP • Potomac Yard Metro Station projects • Dulles Corridor Metrorail – Additional CLRP service improvements 2 Types of Projects, Plans, and/or Strategies Tested Core Capacity Access Surface Transit New Strategies Strategies Strategies Connections Strategies New rail lines In-fill stations & Enhanced bus Metrorail through the core pedestrian priority corridors extensions to connections activity centers Rail inter-lining Improved Enhanced Commuter rail pedestrian commuter rail extensions networks service Enhanced bus Park and Ride lots Enhanced BRT BRT/LRT/Streetcar priority corridors with shuttles to network extensions rail 3 Yellow and Green Line Separation Options Tested New Yellow Line Split Yellow Line to New Yellow Line on 2nd on 10th Street NW, maintain current Street SE/NE to connect to Red Line alignment and add new to Union Station, up line on 2nd Street SE/NE North Capitol Street. 4 New Rosslyn Tunnel and Blue or Silver Line Separation Options Tested New Blue Line along M Street, NW, and New Jersey NW and H St NW/NE New Blue Line along M Street, NW, Constitution Avenue and H St NW/NE Relocated Silver Line with Ballston-Rosslyn Express Line 5 Brown Line Tested New Brown Line along Wisconsin Ave, Constitution, and Georgia Ave. 6 Beltway Line Tested 7 End of Line Extensions Tested 1. Green Line to BWI 1 2. Orange Line to Bowie 3. Green Line to Charles County 2 4. Blue Line to Potomac Mills 5 5. Orange Line to Centreville 4 3 8 End of Line Extensions Tested 1. Red Line to 1 Metropolitan Grove 6 2. Blue Line to Bowie 3. Green Line to 2 National Harbor 4. Yellow Line to Lorton 5 5. Orange Line to Gainesville 3 6. Silver Line to Leesburg 4 9 Interline Connection Options Tested 1. Courthouse – Arlington Cemetery 2. Arlington Cemetery – L’Enfant Plaza 3. Pentagon – Waterfront SEU 4. Orange and Silver at West Falls Church Three new rail services: 1. VA-772 to Mount Vernon Square using connectors 1 and 2 (Silver1) 2. Dulles to Branch Avenue using connectors 1, 2, and 3 (Green2) 3. Dulles to Vienna using connector 4 (Silver2) 10 Infill Stations Tested Potential RTSP Infill Station Shady Grove Planned Infill Station Montgomery College Existing Infill Station Rockville Existing Adjacent Station Takoma Kansas Ave Fort Totten New York Ave - Florida Ave - Gallaudet U Minnesota Ave Anacostia St. Elizabeth’s Campus Congress Heights Ronald Reagan Washington National Airport Potomac Yard Braddock Road King Street Eisenhower Avenue Franconia-Springfield Huntington 11 Other Metrorail Strategies Tested • Add Park-and-Ride lots near end of line stations and connect with feeder service to rail stations. Increase pricing at over- subscribed park-and-ride lots. • Increase “walkability” within ¾ mile of transit stations • Use MWCOG Aspirations Land Use to shift some future jobs/households to regional activity centers and transit station areas 12 Light Rail Lines Tested COMSAT 1 1. Corridor Cities Transitway Revision: Shady Grove – COMSAT Shady Grove White Oak 2. Purple Line Spur: 2 Takoma – White Oak 3. Purple Line Extension: Takoma New Carrollton - New Alexandria Carrollton 3 Eisenhower @ Yellow Line) 13 Streetcar Lines Tested 1. 37-mile District network 2. New Connections • SW - Pentagon City • Georgetown – Rosslyn • Georgia Ave – Silver Spring 3. New Extensions • Columbia Pike – Lincolnia • Columbia Pike – Tysons on Rt. 7 • Crystal City/Potomac Yard to King Street 14 Metrobus Priority Corridor Network (PCN) • Increase limited stop BRT service • Improve running time for supporting bus service • Improved peak (10 min) and off-peak (15 min) frequency 15 Other Local Jurisdiction Bus Plans Tested • Montgomery BRT network (multiple proposals) • Northern Virginia Express Bus on HOT Lanes Network • Northern Virginia BRT Network • Fairfax Countywide Transit Network Study Corridors • Prince George’s Transitway Plan Corridors • Metrobus PCN route extensions 16 MARC Enhancements Tested • Extend MARC to Crystal City • Add bi-directional and off-peak service Line Peak/Off-Peak AM/PM/OP Direction Frequency: Frequency: Base Network Round 8.2 Network Inbound 25 25 AM Outbound 30 30 Peak Inbound 30 30 Penn PM Outbound 25 25 Inbound 50 50 Off-Peak OP Outbound 60 60 Inbound 35 35 AM Outbound 30 30 Peak Inbound 60 60 Camden PM Outbound 40 40 Inbound 0 60 Off-Peak OP Outbound 0 60 Inbound 30 (60 min on each 30 (60 min on each AM branch) branch) Peak Outbound - - Brunswick Inbound - - PM Outbound 30 30 Inbound - - Off-Peak OP 17 Outbound - 60 VRE Enhancements Tested • Extend VRE to Haymarket • Add bi-directional and off-peak service Line Peak/Off- AM/PM/OP Direction Frequency: Frequency: Peak Base Round 8.2 Network 2040 Network Inbound 20 20 AM Outbound 60 40 Peak Inbound 0 40 Manassas PM Outbound 40 20 Inbound 150 60 Off-Peak OP Outbound 150 60 Inbound 20 20 AM Outbound 0 40 Peak Fredericksbu Inbound 0 40 PM rg Line Outbound 20 20 Inbound 0 60 Off-Peak OP 18Outbound 0 60 Commuter Bus Enhancements Tested • Increase service frequencies Base Network Frequency Round 8.2 Network Frequency 60 min 40 min 40 min 30 min 30 min 20 min 20 min 15 min 15 min 12 min 19 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    19 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us