PW Integrated Template

PW Integrated Template

Preliminary Design Environmental Assessment Report Volume 2: Appendices Appendix G. Noise G.1 Baseline Survey Locations Figure G-1: Site Locations C1-1 to C1-3 Figure G-1: Site Locations C2-1 to C5-1 Revision C06 Page 278 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Figure G-2: Site Locations C5-1 to C5-3 Figure G-1: Site Locations C6-1 to C6-3 Revision C06 Page 279 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices G.2 Construction Activities Vs. Assessment Locations Table G-1: Day LAeq,12hr (0700 – 1900) Gantry Earthworks Gantry Excavate, Surfacing - Removal of Install Gantry Installation - Sheet Earthworks Site Installation Lay and Surfacing, Removing Address Existing Ducts and Installation - Install Earthworks Piling for - Casting Surfacing Clearance - Casting Backfill Sub-Layers Existing Structures Cabling - Piling Signals Retaining Pile Caps Pile Caps Ducts Surface and Signs Walls 77 Cottingley Drive, 0.6 -9.2 -0.2 -13.8 -18.5 -7.7 2.4 -2.9 -13.7 -18.3 -25.3 -23.9 -31.1 LS11 0JR 76 Cottingley Drive, 7.8 8.4 6.7 -2.0 -6.7 -4.4 9.3 3.7 -0.9 -5.5 -14.0 -12.5 -19.8 LS11 0JP 2 Cottingley Drive, -23.8 -19.3 -24.6 -29.9 -34.5 -32.6 -22.0 -27.7 -29.9 -34.5 -33.7 -32.2 -39.5 LS11 0JG 255 Elland Road, -19.3 -16.1 -20.3 -24.8 -29.4 -27.9 -17.7 -22.8 -26.5 -31.2 -22.8 -21.4 -28.6 LS11 8TU 277 Elland Road, -18.9 -17.8 -19.7 -24.4 -29.1 -27.7 -17.1 -22.4 -27.9 -32.6 -24.6 -23.2 -30.4 LS11 8TU 35 Noster Terrace, 12.8 -15.0 11.8 -4.0 -8.7 -4.5 14.4 2.0 -10.1 -24.8 5.6 7.0 -0.2 LS11 8QF 6 Baron Close, -21.2 -13.3 -12.0 -15.1 -19.8 -19.1 -9.4 -24.3 -34.1 -28.8 -4.0 -2.5 -9.8 LS11 8SB Revision C06 Page 280 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate, Surfacing - Removal of Install Gantry Installation - Sheet Earthworks Site Installation Lay and Surfacing, Removing Address Existing Ducts and Installation - Install Earthworks Piling for - Casting Surfacing Clearance - Casting Backfill Sub-Layers Existing Structures Cabling - Piling Signals Retaining Pile Caps Pile Caps Ducts Surface and Signs Walls 89 Normanto n Place, 3.7 -1.9 2.8 -5.4 -10.0 -7.3 5.4 0.7 -18.6 -33.2 0.3 1.8 -5.5 LS11 8LE 9 Tilbury Road, -12.6 -23.0 -13.5 -26.1 -30.7 -23.0 -10.9 -17.1 -25.9 -30.5 -39.9 -38.5 -45.7 S11 0BW 2 Recreatio n Place, -2.2 5.4 -2.2 -20.0 -24.6 -18.3 0.4 -12.1 -34.2 -28.8 -8.1 -6.7 -13.9 LS11 0AN 2 Recreatio n Mount, 0.0 0.0 0.8 -9.9 -14.5 -5.2 3.4 -6.5 -24.2 -28.9 -7.3 -5.9 -13.1 LS11 0AS 80 Holbeck Moor -9.1 -8.6 -10.7 -15.2 -19.9 -18.3 -8.1 -12.5 -15.7 -20.3 -11.9 -10.5 -17.7 Road, LS11 9QL 94 Northcote Drive, -5.1 -10.8 -5.9 -16.4 -21.1 -13.5 -3.3 -8.4 -13.9 -23.6 -8.1 -6.7 -13.9 LS11 6NH 83 Moor Crescent Chase, -11.4 -8.1 -12.2 -20.4 -25.1 -22.0 -9.6 -16.6 -24.4 -29.0 -15.5 -14.1 -21.3 LS11 5UL Revision C06 Page 281 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate, Surfacing - Removal of Install Gantry Installation - Sheet Earthworks Site Installation Lay and Surfacing, Removing Address Existing Ducts and Installation - Install Earthworks Piling for - Casting Surfacing Clearance - Casting Backfill Sub-Layers Existing Structures Cabling - Piling Signals Retaining Pile Caps Pile Caps Ducts Surface and Signs Walls 71 Longroyd View, -4.2 -2.9 -5.3 -18.8 -23.4 -12.5 -2.7 -7.8 -16.6 -16.3 -24.8 -23.4 -30.6 LS11 5ET 20 Royal Place, -7.0 -14.8 -7.7 -15.5 -20.1 -15.7 -5.1 -10.4 -12.3 -27.0 -25.5 -24.1 -31.3 LS10 2RS 1 Ebor Terrace, -5.7 -8.7 -7.1 -43.0 -47.6 -27.7 -4.5 -17.9 -22.9 -17.5 -47.9 -46.5 -53.7 LS10 2EQ 12 Nursery Mount -5.2 -0.9 -4.0 -31.4 -36.0 -13.0 -1.4 -9.0 -10.8 -15.5 -37.8 -36.4 -43.6 Road, LS10 3EU 1 Parnaby Street, -6.6 -5.9 -7.4 -36.7 -41.3 -18.3 -4.8 -11.0 -12.9 -17.5 -39.5 -38.1 -45.3 LS10 3BX 26 East Grange Drive, -10.3 -9.7 -10.8 -29.2 -33.9 -18.8 -8.3 -13.6 -15.5 -20.2 -34.0 -32.5 -39.8 S10 3EH 48 Westbury Place 8.1 0.2 5.5 -37.1 -41.7 -9.0 8.1 -0.3 -2.7 -7.4 -39.5 -38.1 -45.3 North, LS10 3DE Revision C06 Page 282 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate, Surfacing - Removal of Install Gantry Installation - Sheet Earthworks Site Installation Lay and Surfacing, Removing Address Existing Ducts and Installation - Install Earthworks Piling for - Casting Surfacing Clearance - Casting Backfill Sub-Layers Existing Structures Cabling - Piling Signals Retaining Pile Caps Pile Caps Ducts Surface and Signs Walls 16 Tilbury View, 8.2 -8.3 3.7 -23.3 -27.9 -14.7 6.3 4.4 -11.3 -16.0 3.8 15.3 8.0 LS11 0BH Table G-2: LAeq,4hr (1900 – 2300) Gantry Earthworks Gantry Excavate Surfacing, Removal of Install Gantry Installation - Sheet Earthworks Surfacing, Site Installation Lay and Removing Address Existing Ducts and Installation - Install Earthworks Piling for , Casting Sub- Surfacing Clearance - Casting Backfill Existing Structures Cabling - Piling Signals Retaining Pile Caps Layers Pile Caps Ducts Surface and Signs Walls 77 Cottingley 0.2 -9.7 -0.7 -14.3 -18.9 -8.1 1.9 -3.4 -14.1 -18.8 -25.8 -24.3 -31.6 Drive, LS11 0JR 76 Cottingley 7.3 7.9 6.3 -2.5 -7.1 -4.8 8.9 3.2 -1.3 -6.0 -14.4 -13.0 -20.2 Drive, LS11 0JP 2 Cottingley -20.2 -15.7 -21.0 -26.2 -30.9 -28.9 -18.4 -24.0 -26.2 -30.9 -30.0 -28.6 -35.8 Drive, LS11 0JG 255 Elland Road, -14.8 -11.7 -15.8 -20.3 -25.0 -23.5 -13.2 -18.3 -22.1 -26.7 -18.4 -17.0 -24.2 LS11 8TU Revision C06 Page 283 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate Surfacing, Removal of Install Gantry Installation - Sheet Earthworks Surfacing, Site Installation Lay and Removing Address Existing Ducts and Installation - Install Earthworks Piling for , Casting Sub- Surfacing Clearance - Casting Backfill Existing Structures Cabling - Piling Signals Retaining Pile Caps Layers Pile Caps Ducts Surface and Signs Walls 277 Elland Road, -14.5 -13.4 -15.3 -20.0 -24.6 -23.3 -12.7 -17.9 -23.5 -28.1 -20.2 -18.8 -26.0 LS11 8TU 35 Noster Terrace, 12.3 -15.4 11.4 -4.5 -9.2 -4.9 14.0 1.6 -10.6 -25.2 5.1 6.5 -0.7 LS11 8QF 6 Baron Close, -21.8 -13.8 -12.6 -15.7 -20.4 -19.7 -10.0 -24.9 -34.7 -29.3 -4.6 -3.1 -10.4 LS11 8SB 89 Normanto 3.2 -2.4 2.3 -5.8 -10.5 -7.8 4.9 0.3 -19.0 -33.7 -0.1 1.3 -5.9 n Place, LS11 8LE 9 Tilbury Road, -8.0 -18.5 -8.9 -21.5 -26.2 -18.4 -6.3 -12.5 -21.3 -26.0 -35.3 -33.9 -41.1 S11 0BW 2 Recreatio 2.4 10.0 2.4 -15.4 -20.1 -13.8 5.0 -7.5 -29.7 -24.3 -3.6 -2.2 -9.4 n Place, LS11 0AN 2 Recreatio 4.5 4.6 5.3 -5.3 -10.0 -0.7 7.9 -1.9 -19.7 -24.4 -2.8 -1.3 -8.6 n Mount, LS11 0AS 80 Holbeck Moor -9.5 -9.1 -11.2 -15.7 -20.3 -18.8 -8.6 -13.0 -16.1 -20.8 -12.4 -10.9 -18.2 Road, LS11 9QL Revision C06 Page 284 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate Surfacing, Removal of Install Gantry Installation - Sheet Earthworks Surfacing, Site Installation Lay and Removing Address Existing Ducts and Installation - Install Earthworks Piling for , Casting Sub- Surfacing Clearance - Casting Backfill Existing Structures Cabling - Piling Signals Retaining Pile Caps Layers Pile Caps Ducts Surface and Signs Walls 94 Northcote -0.6 -6.2 -1.3 -11.9 -16.5 -9.0 1.3 -3.9 -9.4 -19.0 -3.6 -2.2 -9.4 Drive, LS11 6NH 83 Moor Crescent -10.3 -7.1 -11.1 -19.4 -24.0 -20.9 -8.5 -15.5 -23.3 -27.9 -14.4 -13.0 -20.2 Chase, LS11 5UL 71 Longroyd -4.7 -3.4 -5.8 -19.2 -23.9 -13.0 -3.2 -8.3 -17.1 -16.7 -25.3 -23.9 -31.1 View, LS11 5ET 20 Royal Place, -7.5 -15.3 -8.2 -15.9 -20.6 -16.2 -5.6 -10.8 -12.8 -27.4 -26.0 -24.6 -31.8 LS10 2RS 1 Ebor Terrace, -1.7 -4.7 -3.1 -38.9 -43.6 -23.6 -0.5 -13.9 -18.8 -13.5 -43.9 -42.5 -49.7 LS10 2EQ 12 Nursery Mount -4.0 0.2 -2.8 -30.2 -34.9 -11.9 -0.2 -7.8 -9.6 -14.3 -36.6 -35.2 -42.4 Road, LS10 3EU 1 Parnaby Street, -2.4 -1.7 -3.2 -32.5 -37.1 -14.1 -0.6 -6.8 -8.7 -13.3 -35.3 -33.9 -41.1 LS10 3BX 26 East Grange -5.7 -5.2 -6.3 -24.7 -29.3 -14.3 -3.7 -9.1 -11.0 -15.6 -29.4 -28.0 -35.2 Drive, S10 3EH Revision C06 Page 285 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Gantry Earthworks Gantry Excavate Surfacing, Removal of Install Gantry Installation - Sheet Earthworks Surfacing, Site Installation Lay and Removing Address Existing Ducts and Installation - Install Earthworks Piling for , Casting Sub- Surfacing Clearance - Casting Backfill Existing Structures Cabling - Piling Signals Retaining Pile Caps Layers Pile Caps Ducts Surface and Signs Walls 48 Westbury Place 9.8 1.9 7.3 -35.3 -40.0 -7.3 9.9 1.4 -1.0 -5.6 -37.7 -36.3 -43.5 North, LS10 3DE 16 Tilbury View, 12.7 -3.8 8.2 -18.7 -23.4 -10.2 10.8 8.9 -6.8 -11.4 8.4 19.8 12.6 LS11 0BH Revision C06 Page 286 of 386 Preliminary Design Environmental Assessment Report Volume 2: Appendices Table G-3: Night - LAeq,8hr (2300 – 0700) Gantry Earthworks Gantry Excavate, Surfacing - Removal of Install Gantry Installation - Sheet Earthworks Surfacing, Site Installation Lay and Removing Address Existing Ducts and Installation - Install Earthworks Piling for - Casting - Sub- Surfacing Clearance - Casting Backfill Existing Structures Cabling - Piling Signals Retaining Pile Caps Layers Pile Caps Ducts Surface and Signs Walls 77 Cottingle y Drive, 3.9 -5.9 3.0 -10.5 -15.2 -4.4 5.6 0.3 -10.4 -15.0 -22.0 -20.6 -27.8 LS11 0JR 76 Cottingle y Drive, 11.1 11.6 10.0 1.2 -3.4 -1.1 12.6 6.9 2.4 -2.3 -10.7 -9.3 -16.5 LS11 0JP 2 Cottingle y Drive, -17.9 -13.4 -18.7 -24.0 -28.6 -26.7 -16.1 -21.8 -24.0 -28.6 -27.8 -26.3 -33.6 LS11 0JG 255 Elland Road, -12.6 -9.4 -13.6 -18.1 -22.8 -21.3 -11.0

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    83 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us