LPG IMPORT JETTY AT DAHEJ, GUJARAT PRE - FEASIBILITY REPORT JUNE 5, 2021 HINDUSTAN PETROLEUM CORPORATION LIMITED MUMBAI PFR for the proposed construction of LPG Import Jetty with dispatch station and Onshore pipeline to Vadadora at Dahej village, Bharuch District, Gujarat. Table of Contents EXECUTIVE SUMMARY .................................................................................................................... 4 1 INTRODUCTION ....................................................................................................................... 5 1.1 Identification of Project & Proponent .............................................................................. 5 1.2 Description & Nature of the Project ................................................................................. 6 1.3 Need for the Project ......................................................................................................... 7 1.4 Demand-Supply Gap ......................................................................................................... 7 1.5 Imports vs Indigenous Production .................................................................................... 8 1.6 Employment Generation due to the Project .................................................................... 8 1.7 Codes and Standards ........................................................................................................ 8 2 PROJECT DESCRIPTION ......................................................................................................... 10 2.1 Types of Project including Interlinked and Interdependent Project, if any. .................. 10 2.2 Location of the Project ................................................................................................... 10 2.3 Details of alternate sites considered and selection criteria ........................................... 12 2.4 Bathymetry ..................................................................................................................... 12 2.5 Size or Magnitude of Operation ..................................................................................... 13 2.6 Project Description with Process Details ........................................................................ 14 2.6.1 Jetty Facilities .......................................................................................................... 14 2.6.2 Marine Loading Arm (MLA) ..................................................................................... 15 2.6.3 LPG Handling ........................................................................................................... 16 2.7 Vessel Characteristics ..................................................................................................... 18 2.8 Vessel Pumping Capacity ................................................................................................ 18 2.9 Berth Occupancy ............................................................................................................. 18 2.10 Methodology ............................................................................................................... 19 2.11 Raw Materials required and Quantum ....................................................................... 20 2.12 Resource optimization / recycling .............................................................................. 20 2.13 Water & Power Requirement ..................................................................................... 20 2.14 Quantity of Wastes ..................................................................................................... 20 2.15 Manpower Requirement ............................................................................................. 21 2.16 Preliminary Cost Estimate Summary........................................................................... 21 3 SITE ANALYSIS ....................................................................................................................... 22 3.1 Connectivity .................................................................................................................... 22 3.2 Land Ownership .............................................................................................................. 22 3.3 Topography ..................................................................................................................... 22 1 | P a g e PFR for the proposed construction of LPG Import Jetty with dispatch station and Onshore pipeline to Vadadora at Dahej village, Bharuch District, Gujarat. 3.4 Soil Profile ....................................................................................................................... 22 3.5 Climatic Conditions ......................................................................................................... 23 3.6 Winds .............................................................................................................................. 23 3.7 Rainfall ............................................................................................................................ 23 3.8 Temperature and humidity............................................................................................. 24 3.9 Visibility ........................................................................................................................... 24 3.10 Tide Levels ................................................................................................................... 24 3.11 Wave Parameters ........................................................................................................ 24 3.12 Cyclonic Storms ........................................................................................................... 25 3.13 Existing land use pattern ............................................................................................. 25 3.14 Existing Infrastructure ................................................................................................. 25 3.15 Social Infrastructure available..................................................................................... 25 4 PLANNING (BRIEF) ................................................................................................................ 26 4.1 Planning Concept ............................................................................................................ 26 4.2 Population Projection ..................................................................................................... 26 4.3 Land use planning ........................................................................................................... 26 4.4 Assessment of infrastructure Demand ........................................................................... 27 4.5 Amenities / Facilities ....................................................................................................... 27 4.6 Work Elements and Scope .............................................................................................. 27 5 PROPOSED INFRASTRUCTURE .............................................................................................. 28 5.1 Industrial Area (Processing Area) ................................................................................... 28 5.2 Residential Area (Non – Processing Area) ...................................................................... 28 5.3 Green belt ....................................................................................................................... 28 5.4 Social Infrastructure ....................................................................................................... 28 5.5 Connectivity .................................................................................................................... 28 5.6 Drinking Water management ......................................................................................... 28 5.7 Sewerage System ............................................................................................................ 28 5.8 Industrial Waste Management ....................................................................................... 28 5.9 Solid waste management ............................................................................................... 28 6 REHABILITATION & RESETTLEMENT (R&R) PLAN ................................................................ 30 7 PROJECT SCHEDULE AND COST ESTIMATES ......................................................................... 31 7.1 Start of Construction & Completion ............................................................................... 31 7.2 Estimated Project Cost.................................................................................................... 31 8 ANALYSIS OF PROPOSAL & RECOMMENDATIONS .............................................................. 32 2 | P a g e PFR for the proposed construction of LPG Import Jetty with dispatch station and Onshore pipeline to Vadadora at Dahej village, Bharuch District, Gujarat. 8.1 Financial Assessment ...................................................................................................... 32 8.2 Social Benefit .................................................................................................................. 32 9 CONCLUSION ......................................................................................................................... 33 List

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    34 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us