72Nd OCC Meeting Agenda

72Nd OCC Meeting Agenda

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/3002 Jabalpur, dated:15.11.2019 To As per distribution list Sub: Agenda of 72nd meeting of Operation and Coordination Committee of MP. … nd The Agenda of 72 meeting of the Operation and Coordination Committee of MP th scheduled on 19 November 2019 at Conference Hall, SLDC, MPPTCL, Jabalpur has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email- [email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar, Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected] 8. The Chief Engineer(EHT:Const.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2661618, E-mail- [email protected]. 9. The Chief Engineer(EHT:Maint&insp.), MP Power Transmission Co. Limited, Jabalpur. Fax-0761-2665593, E-mail- [email protected]. 10. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected] 11. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 12. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected] 13. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]. 14. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 15. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 16. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 17. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]. 18. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected] 19. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected] 20. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] [email protected] 21. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M- 9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR). 22. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected] 23. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected]. 24. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected] 25. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected] [email protected], 26. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected] 27. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected] 28. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected] AGENDA FOR 72nd MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 19th NOVEMBER 2019 AT 11:00 AM AT Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur. ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 71st meeting of Operation & Coordination Committee of MP held on 09th July 2019 at Conference Hall, SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2886 Jabalpur dated 31.09.2019. No comments have been received. [OCC may confirm the minutes] ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUGUST 2019 TO SEPTEMBER 2019. 2.1. Frequency Particulars: During AUGUST 2019 the system frequency was below 49.90 Hz for 7.28% of time against 4.57% of time during SEPTEMBER 2019. The system frequency was above 50.05 Hz for 20.03% of time during AUGUST 2019 against 20.18 % of time during SEPTEMBER 2019. The system frequency was within the IEGC range of 49.90-50.05 Hz for 72.69 % of the time during AUGUST 2019 against 75.25 % of time during SEPTEMBER 2019. The average monthly frequency was 50.00 Hz during month of AUGUST 2019 and 50.01 Hz during month of SEPTEMBER 2019. The detailed frequency particulars for the month of AUGUST 2019 and SEPTEMBER 2019 are enclosed at Annexure-2.1. The brief detail of frequency profile is given here under:- Minimum Maximum Instantaneous Instantaneous Average Integrated integrated Month Minimum Maximum frequency frequency over frequency over an Frequency Frequency an hour hour AUGUST 50.00 Hz 49.81 Hz 50.26 Hz 49.55 Hz 50.32 Hz 2019 SEPTEMBER 50.01 Hz 49.80 Hz 50.14 Hz 49.62 Hz 50.27 Hz 2019 [Committee may like to note] 2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months AUGUST 2019 & SEPTEMBER 2019 is as given below for discussion by the committee : % of time % of time frequency % of time Frequency Average monthly Month Frequency within the permissible above 50.05 Hz frequency Below 49.90 Hz range of 49.90-50.05 Hz. AUGUST 7.28% 20.03% 72.69% 50.00 Hz 2019 SEPTEMBER 4.57% 20.18% 75.25% 50.01 Hz 2019 [Committee may like to note] 2.2.2 Voltage Profile: During the months AUGUST 2019 & SEPTEMBER 2019 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:- Name of Sr. AUGUST 2019 SEPTEMBER 2019 400 KV No. Max. Voltage Min. Voltage Max. Voltage Min. Voltage Substation Observed Observed Observed Observed Agenda of 72nd OCCM of MP 1 Voltage Voltage Voltage Voltage Date Date Date Date KV KV KV KV 1 Bhopal 420.09 15.08.19 400.18 18.08.19 418.89 29.09.19 401.53 30.09.19 2 Bina 418.99 15.08.19 398.21 18.08.19 417.39 29.09.19 397.42 13.09.19 3 Gwalior 414.94 15.08.19 388.23 18.08.19 414.33 20.09.19 390.14 02.09.19 4 Indore 418.75 15.08.19 403.46 19.08.19 417.95 21.09.19 403.28 13.09.19 5 ISP 420.3 07.08.19 407.1 05.08.19 420.9 13.09.19 408.7 13.09.19 6 Julwaniya 429.15 10.08.19 412.47 19.08.19 431.7 10.09.19 403.47 13.09.19 7 Katni 425.25 08.08.19 403.26 18.08.19 426.14 13.09.19 405.63 13.09.19 8 Nagda 423.04 15.08.19 391.08 02.08.19 421.77 29.09.19 403.28 13.09.19 9 Pithampur 419.24 15.08.19 403.72 19.08.19 419.99 13.09.19 403.66 13.09.19 10 Birsinghpur 430.43 15.08.19 413.35 18.08.19 427.38 29.09.19 409.68 13.09.19 11 Singhaji 422.33 27.08.19 409.5 19.08.19 424.53 22.09.19 405.59 13.09.19 12 Satpura 426.14 16.08.19 413.84 18.08.19 427.31 12.09.19 410.9 13.09.19 13 Itarsi 424.97 15.08.19 407.39 18.08.19 424.97 29.09.19 409.73 30.09.19 14 Ashta 426.42 15.08.19 410.84 18.08.19 427.58 21.09.19 410.55 30.09.19 15 Chhegaon 424.82 10.08.19 410.74 19.08.19 427.88 12.09.19 412.63 30.09.19 16 Kirnapur 447.53 08.08.19 419.8 08.08.19 439.67 29.09.19 427.36 27.09.19 Badnawar 425.15 15.08.19 408.15 18.08.19 425.33 21.09.19 410.95 06.09.19 17 [Committee may please note & discuss] 2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 31th MAY 2019 as submitted by DISCOMs is detailed below: Capacitor bank Capacitor Capacitor bank Require Requiremen Capacitor Balance installed in good Banks healthy installed but ment of t against banks already capacitor condition (No) but not in defective & are repair non- covered under banks to be service due to repairable (No) against repairable ADB T-V covered in DISCOM control ckt each capacitor other problem unit (No) banks schemes 600 1200 1500 600 1200 1500 600 1200 1500 No of 100 600 1200 600 1200 600 1500 KVAR KVAR KVAR KVA KVA KVA KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR KVAR R R R Units required EZ - - - - - - - - - - - - - - - - CZ 1 685 875 - - - 0 0 0 3 0 0 0 0 0 0 WZ 613 550 725 10 3 1 23 12 15 207 08 16 - - - 0 The details has not been provided by East Discom.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    71 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us