570 Hazeldean Road, Ottawa, on Transportation Brief Mattamy Homes

570 Hazeldean Road, Ottawa, on Transportation Brief Mattamy Homes

570 Hazeldean Road, Ottawa, ON Transportation Brief Mattamy Homes Prepared By: Stantec Consulting Ltd. Project Number: 163600871 March 2013 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013 TIA GUIDELINES CHECKLIST – TRANSPORTATION BRIEF Report Context ☒ Municipal Address Comment:___ Section 1.1___________________________________________________________ ☒ Location relative to major elements of the existing transportation system (e.g. the site is located in the southwest quadrant of the intersection of Main Street/First Street, 600m from the Maple Street Rapid Transit Station) Comment:____Section 1.3___________________________________________________________ ☒ Existing land uses or permitted use provisions in the Official Plan, Zoning By-Law, etc. Comment:____Section 1.2___________________________________________________________ ☒ Proposed land uses and relevant planning regulations to be used in the analysis Comment:____Section 1.3___________________________________________________________ ☒ Proposed development size (building size, number of residential units, etc.) and location on site Comment:____Section 1.3___________________________________________________________ ☒ Estimated date of occupancy Comment:_____Section 3.1__________________________________________________________ ☒ Planned phasing of development Comment:_____Section 3.1__________________________________________________________ ☐ Proposed number of parking spaces (not relevant for Registration of Plans of Subdivision) Comment:_____ N/A – Draft Plan of Subdivision__________________________________________ ☒ Proposed access points and type of access (full turns, right-in/right-out, turning restrictions, etc.) Comment:_____Figure 3, Figure 12____________________________________________________ ☒ Study area Comment:_____Figure 1_____________________________________________________________ ☒ Time periods and phasing Comment:_____Section 1.4__________________________________________________________ ☒ Horizon years (including reference to phased development) Comment:_____Section 1.4__________________________________________________________ Existing Conditions ☒ Existing roads, ramps in the study area, including jurisdiction, classification, number of lanes and posted speed limit Comment:____Section 2.1___________________________________________________________ ☒ Existing intersections, indicating type of control, lane configurations, turning restrictions and any other relevant data (e.g. extraordinary lane widths, grades, etc.) Comment:____Section 2.1___________________________________________________________ ☒ Existing access points to adjacent developments (both sides of all roads bordering the site) Comment:____Figure 3______________________________________________________________ ☒ Existing transit system, including stations and stops Comment:____Section 2.2___________________________________________________________ ☒ Existing on- and off-road bicycle facilities and pedestrian sidewalks and pathway networks Comment:____Section 2.3___________________________________________________________ ☒ Existing system operations (V/C, LOS) Comment:__As per the pre-consultation, intersection capacity analysis was not required for this study ☒ Major trip generators/attractors within the study area should be indicated 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013 Comment:____Section 2.4___________________________________________________________ Demand Forecasting ☒ Trip generation rates Comment:____Section 3.3.2__________________________________________________________ Impact Analysis ☒ Qualitative assessment of impacts on capacity; non-auto modes; on-site circulation; community Comment:____Section 3.8, 3.9, 3.10___________________________________________________ Mitigation Measures and Site Design Characteristics ☒ Location and timing of proposed changes to existing traffic controls at intersections (e.g. new traffic signals, Stop signs, etc.) Comment:____Section 4.0___________________________________________________________ ☒ Mitigation measure required to offset impacts on the surface and Rapid Transit networks Comment:_____Section 4.0__________________________________________________________ ☒ New or modified elements of the bicycle and pedestrian networks Comment:_____Section 4.0__________________________________________________________ ☒ Community impact mitigation measures Comment:_____Section 4.0__________________________________________________________ ☒ Proposed TDM features or programs to support the site development. Comment:_____Section 4.0__________________________________________________________ 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013 Table of Contents 1.0 INTRODUCTION .............................................................................................................. 1.1 1.1 PURPOSE ........................................................................................................................ 1.1 1.2 CONTEXT ......................................................................................................................... 1.1 1.3 PROPOSED DEVELOPMENT .......................................................................................... 1.2 1.4 SCOPE OF THE ASSESSMENT ...................................................................................... 1.3 2.0 EXISTING TRANSPORTATION CONDITIONS ................................................................ 2.5 2.1 ROADS AND TRAFFIC CONTROL .................................................................................. 2.5 2.2 TRANSIT .......................................................................................................................... 2.7 2.3 CYCLING AND WALKING ................................................................................................ 2.8 2.4 TRAFFIC VOLUMES AND MAJOR TRIP GENERATORS ................................................ 2.9 3.0 FUTURE TRANSPORTATION CONDITIONS ................................................................ 3.12 3.1 HORIZON YEARS AND DEVELOPMENT PHASING ..................................................... 3.12 3.2 MODE SHARE ASSUMPTIONS ..................................................................................... 3.12 3.3 TRAFFIC FORECASTS .................................................................................................. 3.13 3.3.1 Transportation Model ....................................................................................... 3.13 3.3.2 Fernbank Community Traffic Forecasts / Generation ....................................... 3.13 3.4 TRAFFIC DISTRIBUTION AND ASSIGNMENT .............................................................. 3.17 3.5 2021 FUTURE BACKGROUND CONDITIONS ............................................................... 3.19 3.6 2021 TOTAL FUTURE CONDITIONS ............................................................................. 3.21 3.7 2026 FUTURE CONDITIONS (5 YEARS BEYOND SITE BUILD-OUT) .......................... 3.21 3.8 TRANSIT SERVICE ........................................................................................................ 3.24 3.9 ACTIVE MODES ............................................................................................................. 3.24 3.10 COMMUNITY IMPACTS ................................................................................................. 3.25 3.11 TRANSPORTATION DEMAND MANAGEMENT............................................................. 3.25 4.0 SUMMARY AND CONCLUSIONS .................................................................................. 4.26 ml w:\active\163600871_fernbankdraftplancommunitytransportationstudy\reports\fernbank tb - final222.docx i 570 HAZELDEAN ROAD, OTTAWA, ON TRANSPORTATION BRIEF MARCH 2013 List of Tables Table 1 Future Mode Share Assumptions .............................................................................. 3.12 Table 2 ITE Land Use Categories and Trip Rates .................................................................. 3.14 Table 3 Fernbank Community Traffic Generation ................................................................... 3.15 Table 4 Traffic Distribution from the Kanata / Stittsville Traffic Zone ....................................... 3.17 List of Figures Figure 1 Fernbank Community Design Plan and Location of Mattamy’s Lands ........................ 1.2 Figure 2 Site Plan ................................................................................................................... 1.4 Figure 3 Existing Intersection Configuration ............................................................................. 2.6 Figure 4 Study Area Transit Routes ........................................................................................ 2.7 Figure 5 Existing Cycling Network ........................................................................................... 2.8 Figure 6 Existing and Planned Pedestrian Network .................................................................. 2.9 Figure 7 2012 Existing Traffic Volumes .................................................................................. 2.11 Figure 8 Fernbank Community Traffic Zones ......................................................................... 3.13 Figure 9 Site Traffic Assignment ............................................................................................ 3.18 Figure 10 2021 Future Background Traffic Volumes .............................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    87 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us