Tennet at a Glance Huge Amounts of Offshore Wind COP21 Agreements Implies a Radical Change in Electricity Generation Mix for the North Seas Countries

Tennet at a Glance Huge Amounts of Offshore Wind COP21 Agreements Implies a Radical Change in Electricity Generation Mix for the North Seas Countries

North Sea Wind Power of the Future Connecting electrons and molecules Hoe houden we het licht aan ? Prof. OctoberMart -van20-2017 der Meijden TenneTJeroen / Delft Brouwers University of Technology The European energy transition Paris (COP21) agreement: Production Limit global avg. temperature to well below 2ºC above pre-industrial levels. Pursuing efforts to limit the temperature increase even further to 1.5ºC. EU Goals: 2030: 40% CO2 compared to 1990 levels. SunPV 2050: 80-95% CO reduction. 2 Wind Power sector decarbonized. Regional cooperation is essential Challenges:October-20-2017 TenneT Supportat a glance schemes | renewables goals | national focus TenneT Offshore track record Germany Netherlands • 12 grid connections for offshore • 5 grid connections for offshore wind farms wind farms • Only AC connections • 9 DC and 3 AC connections • 3.500 MW in 2023 • 5.200 MW at present • NorNed (2008): 700 MW • 7.132 MW in 2019 • BritNed (2010): 1.000 MW • NordLink: 1.400 MW (2020) • COBRAcable (2019): 700 MW By 2023 TenneT will have realised 14.400 MW (14,4 GW) of offshore connection capacity (10.600 MW for offshore wind energy, 3.800 MW for interconnector) September8-3- -13-2017 Cross border cooperation 2016 Solar Thermal Power plants Inspiration: Photovoltaics PAN European sustainable sources Wind on-/of-shore Hydro Biomass Geothermal September-13-2017 Cross border cooperation Source: DESERTEC foundation Electricity importance is growing Share (%) of electricity in total final energy consumption 40 % electrons 40% 39% 36% 30% 21% and 20% 18% 16% 60 % molecules 10% sector coupling 2006 2015 2030 2050 S o u r c e : IEA 2008, EC 2011 September-13-2017 Cross border cooperation the winner is…. however…. September-13-2017 Cross border cooperation Solar needs wind Complementary sources during the year October-20-2017 TenneT at a glance Huge amounts of offshore wind COP21 agreements implies a radical change in electricity generation mix for the North Seas countries Assumptions study1 • Full decarbonisation of electricity production • 50% reduction of the total energy demand by 2045 (relative to 2010) • Electrification level of 45% Outcome • 230 GW offshore wind capacity • 180 GW deployed in the North Sea • 50 GW deployed in ‘other seas’ (Baltic, Irish and Atlantic) 1 Translate COP21: 2045 outlook and implications for offshore wind in the North Seas (Ecofys 2017 by order of TenneT and Energinet). Countries: FR, BE, NL, UK, IE, LU, DE, DK, SE and NO) October-20-2017 TenneT at a glance North Sea infrastructure Three main functions • Connection of countries: price convergence • Transmission of offshore wind energy • Enhance system security and stability by allowing the exchange of power No consumption at sea Impact of failures differs • Cost of onshore failure 200 x cost of electricity not delivered • Cost of offshore failure 1 x cost of electricity not delivered September -13-2017 Cross border cooperation Solution: the Wind Connector The ‘wind-connector’: wind infrastructure and interconnector combined in one function Country A ~40% ~40% Country B Solution: the Wind Connector 100% Country A Country B ~100% ~100% September-13-2017 Cross border cooperation North Sea infrastructure Doggerbank plaatje October-20-2017 TenneT at a glance Combining wind with interconnectors Wind Connectors October-20-2017 TenneT at a glance Hub and spoke concept October-20-2017 TenneT at a glance Consortium Since13 September 2017: four participants North Sea Win Power Hub October-20-2017 TenneT at a glance How to get it at home? Connecting wind power to load pockets 1 4-5 GW GW 2-3 GW 5-6 GW 4-5 GW >8 GW October-20-2017 TenneT at a glance Solutions • Grid infrastructure (on-offshore-AC-DC) • Demand side integration (P2H, HP, B-EV, FC-EV) • Energy storage (P2G) October-20-2017 TenneT at a glance P2G in the energy transition, TSO2020 • Flexibility • Back-up power • Use in other sectors: mobility, chemicals • Act as a buffer to increase resilience September-13-2017 Cross border cooperation P2G multi sector coupling, TSO2020 TenneT research with TU Delft: Exploitation of Ancillary Services in Multi-Energy Sector Coupling to contribute to the stability in the Power System Real Time Digital Simulation Power Hardware in the Loop RTDS-PHIL Dr. José Rueda Torres October-20-2017 TenneT at a glance Press: Sector Coupling opportunities October-20-2017 TenneT at a glance Long term perspective 40 % electricity flexibility resilience 60% molecules green feedstock chemicals materials common target more RES -> far shore wind -> lower LCOE -> offshore sector coupling e + g -> Dogger Bank island October-20-2017 TenneT at a glance Energy transition North Sea Connecting electrons and molecules September-13-2017 Cross border cooperation The island October-20-2017 TenneT at a glance North Sea Wind Power of the Future Thank you for your attention OctoberProf. Mart-20-2017 van der Meijden JeroenTenneT Brouwers/ Delft University of Technology .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us