M/S.Padmasree Steels Private Limited - OLD

M/S.Padmasree Steels Private Limited - OLD

M/S. PADMASREE STEELS PRIVATE LIMITED Survey No. 106/4,109/4, 6, 7, 110/1, 2, 3, 4 and 112, Devarapalli Village, Ravulapalem Mandal, East Godavari District, Andhra Pradesh Updated Form I 1. FORM 1 2.Pre feasibility report SUBMITTED BY STUDIES AND DOCUMENTATION BY M/s Padmasree Steels Private Limited, TEAM Labs and Consultants Devarapalli Village, B-115 to 117 & 509, Annapurna Block, Ravulapalem Mandal, Aditya Enclave, Ameerpet, East Godavari District - 533 223 Hyderabad-500 038 Andhra Pradesh Phone: 040-23748 555/616, Ph: +91 – 9849664455 Telefax: 040-23748666 E mail: [email protected] Email: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENTAL IMPACT ASSESSMENT AUTHORITY ANDHRA PRADESH GOVERNMENT OF INDIA M/S. PADMASREE STEELS PRIVATE LIMITED Survey No. 106/4,109/4, 6, 7, 110/1, 2, 3, 4 and 112, Devarapalli Village, Ravulapalem Mandal, East Godavari District, Andhra Pradesh FORM 1 SUBMITTED BY STUDIES AND DOCUMENTATION BY M/s Padmasree Steels Private Limited, TEAM Labs and Consultants Devarapalli Village, Ravulapalem Mandal, B-115 to 117 & 509, Annapurna Block, East Godavari District - 533 223 Aditya Enclave, Ameerpet, Andhra Pradesh Hyderabad-500 038 Ph: +91 – 9849664455 Phone: 040-23748 555/616, E mail: [email protected] Telefax: 040-23748666 Email: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENTAL IMPACT ASSESSMENT AUTHORITY ANDHRA PRADESH GOVERNMENT OF INDIA Padmasree Steels Private Limited Form-1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s M/s. Padmasree Steels Private Limited 2 S. No in the Schedule 1(d) Power Plants 3(a) Secondary metallurgical processing industry 3 Proposed capacity/area/length/tonnage to be Capacity S.No Description Units handled/command area/lease area/number of Consented Proposed Total wells to be drilled 1 M S Ingots* / MS TPD 65 250 315 Billets 2 Steel rerolling rods TPD 72 250 322 of Various Sizes (Rebars) 3 Power generation MW 3 9 12 (Gas based) MW - 4* 4* *Standby Additional land of 1.73 ha is proposed for acquisition. 4 New/Expansion/Modernization Expansion Cost estimated for the project Rs. 21 Crores 5 Existing Capacity/Area etc. MS Ingots: 65 TPD, Steel Rerolling rods of various sizes (Rebars)- 72 TPD and Captive Power plant (Natural Gas)- 3 MW 6 Category of Project i.e 'A' or 'B' B 7 Does it attract the general condition? If yes, please No specify 8 Does it attract the Specific condition? If yes, please No specify. 9 Location Plot/Survey/Khasra No. 106/2,3,4,5,6,8,9 ,109/6,7,110/1,2,3 and 110/4 Village Devarapalli Tehsil Ravulapalem District East Godavari State Andhra Pradesh. 10 Nearest railway station/airport along with distance Railway Station: Tanuku- 19 km - NW in kms. Airport: Rajahmundry - 43 km- NW 11 Nearest Town, City, District Headquarters along Town: Ravulapalem – 4.0 km –NW with distance in kms. District headquarters: Kakinada – 45 km -SE 12 Village Panchayats, ZillaParishad,Municipal Village Panchayat: Devarapalli Corporation, Local body (complete postal address Ravulapalem Mandal, with telephone nos. to be given) East Godavari District 13 Name of the Applicant Sri C. Subba Rao 14 Registered Address M/s. Padmasree Steels Private Limited Devarapalli Village, Ravulapalem Mandal, East Godavari District - 533 223 F-1 Padmasree Steels Private Limited Form-1 S. Item Details No 15 Address for Correspondence: Name Sri C. Subba Rao Designation(Owner/Partner/CEO) Managing Director Address M/s. Padmasree Steels Private Limited Devarapalli Village, Ravulapalem Mandal, East Godavari Pin Code 533 223 E-mail [email protected] Telephone Number +91 9849664455, 0883-2445575. Fax No. 040-23748666 16 Details of alternative Sites examined, if any. Not Applicable Location of these sites should be shown on a topo sheet. 17 Interlinked Projects Not applicable 18 Whether separate application of interlinked -NA- project has been submitted? 19 If yes, date of submission -NA- 20 If no, reason 21 Whether the proposal involves approval/clearance -NA- under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any Government Order/Policy No relevant/relating to the site? 23 Forest land involved (hectares) No 24 Whether there is any location pending against the No project and /or land in which the project is propose to be set up? (a)Name of the Court (b) Case No (c) Orders/directions of the Court, if any and its relevance with the proposed project. F-2 Padmasree Steels Private Limited Form-1 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist S. No. Yes/No quantities /rates, wherever possible) with confirmation source of information data 1.1 Permanent or temporary change NO The proposal is for expansion of the existing in land use, land cover or plant. Additional land of 1.73 ha is proposed topography including increase in for acquisition. The present land use is intensity of land use (with respect Industrial use. Site area is 7.01 ha to local land use plan) 1.2 Clearance of existing land, NO The proposal is for expansion of the existing vegetation and buildings? unit. Additional land of 1.73 ha is proposed for acquisition. 1.3 Creation of new land uses? NO Existing land use – Industrial. 1.4 Pre-construction investigations YES Soil test done and soil load bearing capacity e.g. bore houses, soil testing? established 1.5 Construction works? YES Construction activity involves additional sheds, utilities, erection only. 1.6 Demolition works? NO No structures for demolition 1.7 Temporary sites used for NO The construction labor from local villages construction works or housing of shall be employed. construction workers? 1.8 Above ground buildings, YES Storage facilities for raw material and final structures or earthworks products shall be constructed. No major cut including linear structures, cut and fill or excavation is anticipated. and fill or excavations 1.9 Underground works including NO No underground works like mining and mining or tunneling? tunneling. 1.10 Reclamation works? NO 1.11 Dredging? NO 1.12 Offshore structures? NO 1.13 Production and manufacturing YES Enclosed in Annexure – I processes? 1.14 Facilities for storage of goods or YES Storage facility for raw materials (sponge materials? iron) is proposed. 1.15 Facilities for treatment or YES Domestic wastewater shall be sent to septic disposal of solid waste or liquid tank followed by soak pit. Solid waste is effluents? generated from the furnace but is minor in amount and sold to Cement manufacturers / reused. 1.16 Facilities for long term housing of NO Operational workers stay in surrounding operational workers? villages 1.17 New road, rail or sea traffic YES Construction materials shall be transported during construction or operation? to the site. There will be an increase of about 10 trucks per day. The traffic density of the existing connecting road is negligible. F-3 Padmasree Steels Private Limited Form-1 Details thereof (with approximate Information/Checklist S. No. Yes/No quantities /rates, wherever possible) with confirmation source of information data 1.18 New road, rail, air waterborne or NO other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing NO transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission NO lines or pipelines? 1.21 Impoundment, damming, NO culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO 1.23 Abstraction or transfers of water YES Total water required shall be met from Bore form ground or surface waters? wells. Present permitted water consumption is 142 KLD. Total water required after expansion shall be 250 KLD. 1.24 Changes in water bodies or the NO land surface affecting drainage or run-off? 1.25 Transport of personnel or YES The construction material shall be drawn materials for construction, from local sources within 10 – 15 km. There operation or decommissioning? is no transport of personnel, as the construction workers shall be drawn from local villages. 1.26 Long-term dismantling or NO decommissioning or restoration works? 1.27 Ongoing activity during NO decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in YES The proposed project shall increase either temporarily or employment potential and required persons permanently? will be employed locally. Hence the development may not lead to migration from surrounding villages. 1.29 Introduction of alien species? NO 1.30 Loss of native species or genetic NO There are no major losses of tree/shrub diversity? species. 1.31 Any other actions? NO F-4 Padmasree Steels Private Limited Form-1 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Yes Information/checklist Details thereof (with approximate quantities /rates, S.No / Confirmation wherever possible) with source of information data No 2.1 Land especially undeveloped No The proposal is for expansion of the existing unit. No or agricultural land (ha) additional land is required. 2.2 Water (expected source & YES Total water required shall be met from Bore wells. competing users) unit: KLD Present permitted water consumption is 142 KLD. Total water required after expansion shall be 250 KLD. (water balance enclosed in Annexure –II) 2.3 Minerals (MT) NA 2.4 Construction material– stone, YES Stone 20mm- 1500m3, stone 40mm- 800m3, and sand aggregates, sand/soil(expected -2000m3 sourced locally.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    46 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us