October 2020 Report , Item 4. PDF 704 KB

October 2020 Report , Item 4. PDF 704 KB

Director of Services Report South Central Area Committee Meeting 21st October 2020 SOUTH WEST INNER CITY ELECTORAL AREA South West Inner City Area Report Francis Street Environmental Improvement Scheme Contractors for Dublin City Council, KN Networks, are currently mobilising to site for a planned 10-month programme of public realm works at Francis Street. The programme will take place in stages with traffic management in operation for the duration of the works. Ongoing communication with businesses and residents will be provided by KN Networks. Meath Street and Environs Public Realm Improvement Project A design team led by SCAO, Roads Design and Construction and lead design Haslem & Co Architects is currently undertaking preliminary design work on planned public realm improvements for Meath Street. The aim is to bring a proposal to the Council for consideration under Part 8 in Q1 of 2021. Bridgefoot Street Park Construction work continues until the end of 2020. A call for tenders to undertake landscaping work to the central median on Bridgefoot Street is currently underway. It is proposed to complete this work in early 2020. Oisin Kelly Park/ Basin Lane The Area Office is working with the local parks team to undertake tree maintenance, landscaping works and boundary improvements to this amenity area. Work will continue into 2021. St James’s Walk Linear Park A first tranche of work to landscape the section of the linear park at MISA entrance/ Fatima Luas stop will begin shortly. The works are part of a longer term plan to develop the linear park from Basin Lane to Suir Road Bridge. School Zone Following on from John Dillon Street, a second school zone has been completed at Basin Lane in the vicinity of schools. The zone features markings and bollards that aim to deter vehicle parking and drop off congestion at the school entrance. Housing Updates SWIC. Bonham St .Dublin 8. Volumetric Build 57 On site Completion of scheme Q3 2021 26 x 1 bed 26 x 2 bed 5 x 3 bed DCC have designated a community liaison (Mark McInerney) to engage with residents regarding their concerns. Mark can be contacted on 087-7371254 [email protected] 1 Cork Street/ Weaver Street. Volumetric Build 55 On site Completion of scheme Q1 2022 32 x 1 bed 10 x 2 bed 13 x 3 bed DCC have designated a community liaison (Veronica Hand) to engage with residents regarding their concerns. Veronica can be contacted on 087-0997512 [email protected] Margaret Kennedy Square, Dublin 8. 54 On site Completion of scheme Q1 2021 8 x 1 bed 18 x 2 bed 28 x 3 bed St Michael’s Estate Emmet Road Dublin 8 Public consultations ongoing. Tyrone Place D8. Regeneration Study underway. Report due for completion. Liberties Cluster Dublin 8 Study underway. Oliver Bond Regeneration Dublin City Council met with the Robert Emmet CDP on Friday 9th October 2020 to finalise the next round of consultations with the residents of Oliver Bond. These consultations will include the short and long term proposals regarding the future regeneration of Oliver Bond. All tenants and key stakeholders will have an input into this plan. The Robert Emmet CDP in conjunction with the Oliver Bond residents group will facilitate this process starting on Monday 12th October 2020. This will take about two months to complete and once DCC have an agreement on the masterplan. DCC will present this to the Dept. to seek funding. Dolphin House Regeneration Masterplan Dublin 8 One consultation meeting has taken place with DCC and Dolphin House Regeneration Board regarding agreement for a Dolphin House Masterplan. Status: Ongoing Kilmainham Mill A construction team to carry out the enabling works for the mill has been appointed. Following a “cooling off” period, a meeting will be held between DCC and the contractor to agree a start date. Some basic works have been completed in order to assist with the construction process. Thorntons have completed a series of structural surveys on neighbouring properties. MCD Landscaping have also commenced some basic site (scrub) clearance of the mill race to allow for ease of access for workers on health and safety grounds. Newcomen Bank Building Five tender submissions were received for the appointment of a Conservation Architect Led, Multi-Disciplinary Design team to commence work on the building. A team from DCC evaluated the submissions on the 15th October and a team will be appointed in due course following the completion of the relevant processes. 2 Community The theme of The Liberties Haunt 2020 Festival is STAY HOME, STAY SAFE, THIS HALLOWEEN All are welcome to tune in to www.thelibertieshaunt.com on Saturday 31st October from 5.30 – 8.30pm. Viewers will be treated to a variety of performances by local and professional dancers, singers, storytelling, comedy workshops and mask challenge the much acclaimed Theatre on Your Doorstep performers of My First Holy Covid to name but a few. Workshops, recording, and filming will be taking place in Smock Alley prior to the big event. Local communities will be invited to decorate their windows, balconies, front doors for a best dressed/decorated window. Activity packs containing quizzes, puzzles and colouring pages will be available online to download. A limited number of hard copies will also be available to the local communities, through their community contact. A number of schools have been invited to participate in a mask challenge by accepting an activity pack with directions and materials to decorate each mask. All participants are invited to upload to the Liberties Haunt website. Follow the links below for regular updates THE LIBERTIES HAUNT Instagram trailer https://www.instagram.com/p/CGINjwjHZYt/?utm_source=ig_web_copy_link THE LIBERTIES HAUNT Youtube trailer https://youtu.be/rTAIX9wXvmM THE LIBERTIES HAUNT website https://thelibertieshaunt.com/ THE LIBERTIES HAUNT Facebook event Page https://fb.me/e/70axerDz1 This event is a collaborated project involving many community representatives from Michael Mallin House, Oliver Bond House, Robert Emmet Close/Walk, Basin Lane, Maryland, Pimlico, along with local community Groups S.W.I.C.N, SICCDA, RECDP, Solas Project, Liberties Training Centre, Digital Hub, Joined Up, & Happenings Event Companies and Dublin City Council’s Community & Social Development team. Environmental Enhancement Projects Rialto Cottages In recent weeks, the residents from Rialto Cottages and Dublin City Council have come together in an effort to enhance the appearance of their streetscape environmentally. Perimeter walls have been painted, fences have been stained and varnished, beautiful raised beds have been installed and planted in line with Dublin City Council's urban biodiversity plan. In addition to beneficial pollinator loving plants, there has also been a concerted effort to include plants of a culinary nature including rosemary, sage, thyme and mint. Residents are so thrilled with the improvements, they have gone so far as to organise a collection to purchase street furniture including tables, benches and attractive plant containers. Local neighbours and friends have also donated various plants and shrubs. In the coming weeks, additional planters will be installed at the entrance to the street. This project was a joint collaboration between Rialto Street residents, led by Dublin City Council’s Community & Social Development Section, Housing Maintenance , Civic 3 Maintenance, local Parks & Landscapes depot and Public Domain. In the coming weeks additional planters will be installed at the entrance to the street. Autumn Bulbs SWIC Local communities who have been working to enhance their areas, particularly during the Covid-19 lockdown, will be preparing their respective areas for some autumnal planting. Deliveries will be taking place before Halloween. All deliveries and planting will be in line with all Covid-19 safety protocol. St James’s CBS Parents, community and environment group 16 October 2020 “Walk a mile to make you smile” 162 students took part in a Covid-19 compliant event aimed at physical and mental health wellbeing. This event also raised funds for the new community group we have set up and their first goal to create a serenity/outdoor garden community space. With the help of Public Domain, we have helped clear out the existing overgrown space and readied it for planting and painting. We will deliver bulbs, winter planting and perennials in the next week and begin the process. Clanbrassil Close Environment project and residents Group, Spring Bulb and Winter Planting 26 October 2020 We will have series of planting days in the month of October for the residents to enhance the Close and provide colour in the spring. Socially distancing protocols will be adhered to at all times. South Inner City Drugs and Alcohol Task Force Community Dialogues The first of the SICDATF meetings via zoom, to address community engagement and collaboration around the issues with drugs and alcohol locally will take place on Monday 19th October. A member of the Community Development team will be part of the process going forward representing Dublin City Council in the SWIC area. Robinsons Court Environment Renewal Project An environment project began in conjunction with the residents with the replacement of flower boxes and painting and refiling of older ones. When restrictions are lifted, it is hoped to begin a small gardening group with the residents to maintain them. Dolphin House Halloween Hampers 30th October 2020 With funding from the Social Regeneration Fund, Dolphin House community development project will provide 95 Halloween Hampers to families in the complex filled with food and activities for the children. Dolphin Homework Club: A series of socially distanced and safe activities such as Arts and Crafts will be held in the marquee for children and young people to attend. Supported by the Social Regeneration Fund. Public Domain The Dog Warden Service was contracted to conduct patrols in the Pimlico Area, Oscar Square, Weaver Park, Marrowbone, Taylor’s lane and general environs on Saturday 16th, 22nd and 30th of August.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    13 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us