Outfall Design and Construction

Outfall Design and Construction

OUTFALL DESIGN AND CONSTRUCTION CONTENTS: Drawing No. 1158-2413 Drawing No. 1158-2414 Drawing No. 1158-2415 Drawing No. 1158-2416 Drawing No. 1158-2417 Drawing No. 1158-241 8 Drawing No. 1 158-2419 Outline Description of Outfall Design and Construction For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47 - WWTP SITE BOUNDARY - PRIMARY DISCHARGE 1. ALL LEVELS SHOWN REWTETOORMiANCE IURYE" MWU AT MLLINHViD I I I I , Clnt For inspection purposes only. Consent of copyright owner required for any other use. LOUTH COUNTY COUNCIL DROGHEDA WASTE WATER DISCHARGE LICENCE APPLICATION PRIMARY D SCrlARGE PO hT COhSTR,CTION 8 DES GN <SECTION 1 ATTACHMENT C.2 L Pm* 0-r. MICHAEL F. GARRlCK EPA Export 25-07-2013:22:43:47 - WWTP SITE BOUNMRY I For inspection purposes only. Consent of copyright owner required for any other use. SECTION I ATTACHMENT CE EPA Export 25-07-2013:22:43:47 WWTP SITE BOUNDARY STORM WATER For inspection purposes only. Consent of copyright owner required for any other use. DROGHEDA WASTE WATER I DlSCnARGE LlCEhCE KEY PLAN SECTlONl#ZWtCHMENT C.B& mpnr(ql: cwSp we RK E S. SEPT '07 EPA Export 25-07-2013:22:43:47 WWTP SITE / CONCRETE APRON I BOUNDARY ON TlhdBER PILES % STDW WATER c OVERPLBW DWOHARGE For inspection purposes only. Consent of copyright owner required for any other use. DROGHEDA WMTE WRTER DISZHARGE LICEMCE rx. STORM WATER OVERFLOW DISCHARGE POIMTS CONSTRUCTION % DESIGN SHEET 1 OF 4 ,( ,( SECTIONd.ATPACHMENT l2.Z.k EPA Export 25-07-2013:22:43:47 STORM WATER OVERFLOWDISCHARGE POINTS For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47 STORM WATER OVERFLOW Q DISCHARGE POINTS For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47 STORM WATER . OVERFLOW DISCHARGE 1 POINTS For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47 OUTLINE DESCRIPTION OF OUTFALL DESIGN AND CONSTRUCTION 1.0 PRIMARY DISCHARGE POINT Location: Boyne Estuary Marsh Road (approximately 2km east of the WWTP) Diffuser - 4 no. Outlet Points: 312565E-275882N 312515E-275863N 312523E-275947N 312497E-275938N Receiving Water: Boyne Estuary Originates: Final Treated Effluent WWTP, Marsh Road, Drogheda Invert Level: -2.71111 Pipe Size: 1000mm0 pipe from WWTP 700mm0 pipe Across River 4 x 500mm0 pipe - Diffusers Design Criteria: Continuous Flow of Treated Effluent from WWTP Construction Detail: Diffusers Supported on Timber Piles 2.0 SECONDARY DISCHARGE POINT Location: 310245E-275473N Receiving Water: River Boyne Originates: Emergency Overflow Newtown Pumping Station, South Bank River Boyne, Drogheda Invert Level: - Pipe Size: 1600mm0 For inspection purposes only. Consent of copyright owner required for any other use. Design Criteria: Penstock Controlled EmergencylSafety Overflow Only to Operate in Case of Pump Failure Construction Detail: On Concrete Apron IGabion Mattress 3.0 STORM WATER OVERFLOW DISCHARGE POINTS 3.1 swo-1 Location: 312502E-275858N Receiving Water: Boyne Estuary Originates: Storm Water Holding Tanks WWTP, Marsh Road, Drogheda lnvert Level: Pipe Size: 700mm0 Design Criteria: To Relieve Surge Charges on Storm Water Holding Tank, Due to Heavy Precipitation Conditions Construction Detail: Concrete Apron on Timber Piles EPA Export 25-07-2013:22:43:47 3.2 SWO-2 Location: 309745E-275465N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: 375mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.3 SWO-3 Location: 309270E-275159N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: Unknown - Old Sewer Pipe to River Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.4 SWO-4 Location: 309055E-275029N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: 900mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.5 SWO-5 Location: 308783E-274989N (North Bank River Boyne, Drogheda) For inspection purposes only. Receiving Water: RiverConsent Boyne of copyright owner required for any other use. Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: 450mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.6 SWO-6 Location: 308576E-275079N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: 750mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River EPA Export 25-07-2013:22:43:47 3.7 SWO-7 Location: 308151E-275361N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: Unknown - Old Sewer Pipe to River Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.8 SWO-8 Location: 307648E-275426N (North Bank River Boyne, Drogheda) Receiving Water: River Boyne Originates: Manhole, North Bank River Boyne, Drogheda lnvert Level: Unknown - Old Sewer Pipe to River Pipe Size: 450mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown - Old Sewer Pipe to River 3.9 SWO-9 Location: 308625E-274998N Receiving Water: River Boyne Originates: Manhole, South Bank River Boyne, Drogheda lnvert Level: Unknown Pipe Size: Unknown Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown 3.10 SWO-10 Location: 308847E-274949N For inspection purposes only. Receiving Water: RiverConsent Boyne of copyright owner required for any other use. Originates: Manhole, South Bank River Boyne, Drogheda lnvert Level: Unknown Pipe Size: Unknown Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown 3.11 SWO-I1 Location: 309064E-275000N Receiving Water: River Boyne Originates: Manhole, Bull Ring, South Bank River Boyne, Drogheda lnvert Level: Unknown Pipe Size: 450mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown EPA Export 25-07-2013:22:43:47 3.12 SWO-12 Location: 309232E-275087N Receiving Water: River Boyne Originates: Manhole, Mary Street, South Bank River Boyne, Drogheda Invert Level: Unknown Pipe Size: 450mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown 3.13 SWO-13 Location: 309671E-275280N Receiving Water: River Boyne Originates: Manhole, Carmelite Cottages, South Bank River Boyne, Drogheda lnvert Level: Unknown Pipe Size: 375mm0 Design Criteria: To Relieve Surge Charges in Sewer Network, Due to Heavy Precipitation Conditions Construction Detail: Unknown For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 25-07-2013:22:43:47.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us