Land Acquisition and Involuntary Resettlement Due Diligence Report Document stage: Draft for consultation Project Number: 42486-018 November 2019 India: Madhya Pradesh Urban Services Improvement Project - Additional Financing Subproject Group Water Supply Scheme Towns- Bagli and Hatpiplya, District Dewas Prepared by Urban Development and Environment Department, Bhopal Madhya Pradesh for the Asian Development Bank. i CURRENCY EQUIVALENTS (As of June 05, 2018) Currency unit = Rupee (INR) Indian Rupee (INR) 1.00 = USD 0.015 United States Doller (USD) 1.00 = INR 67.15 ABBREVIATIONS ADB - Asian Development Bank BPL - Below Poverty Line GOI - Government of India GOMP - Government of Madhya Pradesh MPUDC - Madhya Pradesh Urban Development Company OHT - Overhead Tank PIU - Project Implementation Unit PMC - Project Management Consultant PMU - Project Management Unit RFCTLARR - The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 ROW - Right of Way RWA - resident welfare associations SPS - safeguard policy statement UADD - Urban Administration and Development Directorate UDED - Urban Development and Environment Department ULBs - Urban Local Body WRD - Water Resource Department WTP - Water Treatment Plant WEIGHTS AND MEASURES Ha Hectare KL Kiloliter Km Kilo meter LPCD - Litre per capita day MLD - Million litre per day M - Meter MM - Millimeter ii This Land Acquisition and Involuntary Resettlement Due Diligence Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. iii TABLE OF CONTENTS I. INTRODUCTION .............................................................................................................. 1 A. Background ...................................................................................................... 1 B. Project Description ........................................................................................... 1 C. Scope of this Report ......................................................................................... 2 II. POLICY FRAMEWORK, AND ENTITLEMENTS .............................................................. 3 III. SUBPROJECT DESCRIPTION ........................................................................................ 3 A. Description about Subproject Towns ................................................................ 3 B. Existing Water Supply Scheme of town Bagli ................................................... 3 C. Proposed Water Supply .................................................................................... 4 IV. FIELD WORK AND PUBLIC CONSULTATION ................................................................ 9 A. Outline of Field Work ........................................................................................ 9 B. Field work Report ............................................................................................. 9 C. Public Consultation ........................................................................................... 9 V. LAND AVAILABILITY AND INVOLUNTARY RESETTLEMENT IMPACTS ......................10 VI. BUDGET .........................................................................................................................16 VII. CONCLUSIONS ..............................................................................................................17 A. Summary and Conclusions ..............................................................................17 B. Compliance with Involuntary Resettlement DDR Requirements ......................17 FIGURE Figure 1: Key Plan of Bagli and Hatpiplya Group WSS ................................................................. 8 Figure 2: Google Map Showing Proposed Components of Group WSS for towns Bagli and Hatpiplya from source to OHTs ........................................................................................................ 18 Figure 3: Site Photographs ............................................................................................................... 50 TABLE Table 1: Summary of Existing Water Supply of town Bagli ........................................................... 4 Table 2: Summary of the Existing Water Supply of town Hatpiplay ............................................. 4 Table 3: Details of Proposed Clear Water Feeder Maims (Bagli and Hatpiplya) ....................... 5 Table 4: Details of Proposed Distribution Network at Town Bagli ................................................ 6 Table 5:Details of Proposed Bagli and Hatpiplya Grouped WSS ................................................. 6 Table 6 Proposed sub-project components in Bagli and Hatpiplya group Water Supply Scheme and their Involuntary Resettlement Impact status .......................................................................... 13 Table 7: Budgetary Requirements ................................................................................................... 16 APPENDICES Appendix 1: Details of Land Ownership for Sites where New Subproject Components Proposed: .............................................................................................................................................................. 19 i Appendix 2: Summary of the Stakeholder Consultation ............................................................. 23 Appendix 3: Photograph of Stakeholder Consultation and List of Participants ....................... 30 Appendix 4 Involuntary Resettlement Screening Checklist ......................................................... 43 Appendix 5: Land records of Proposed Subproject Components ............................................. 46 Appendix 6: Land Status Certificate Issued by Chief Municipality Officer ............................... 49 ii I. INTRODUCTION A. Background 1. Government of Madhya Pradesh (GOMP) with a sector project loan funding from Asian Development Bank (ADB) has proposed to implement Madhya Pradesh Urban Services Improvement Project (MPUSIP), herein after referred as ‘Project’. Madhya Pradesh Urban Development Company Limited (MPUDC) shall be the implementing agency and the State Urban Development and Environment Department (UDED) shall be the executing agency for the Project. A project management unit (PMU) created under MPUDC is implementing MPUSIP. 2. The Resettlement Framework for MPUSIP outlines the objectives, policy principles and procedures for land acquisition, if any, compensation and other assistance measures for Displaced Persons / Affected Persons1, if any. This framework reflects the borrower’s law on the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013, state government policies, ADB’s Safeguard Policy Statement (SPS), 2009 and other social safeguard guidelines. A detailed description of compensation measures and assistance is provided in the entitlement matrix. 3. An entitlement matrix, consistent with the existing norms and guidelines of the country and the state government, and ADB’s Safeguard Policy Statement has been prepared to cover losses identified in this Project. The matrix recognizes that the lack of title/customary rights recognized under law will not be a bar to entitlement and has special provisions for non-titled persons. The eligibility for compensation will be determined through a cut-off date. People moving into the sub- project area after the cut-off date will not be entitled to compensation or other assistance. 4. Madhya Pradesh Urban Services Improvement Program (MPUSIP) proposed to be funded by Asian Development Bank (ADB) envisages provision of sustainable water services to 128 towns in the State out of which provision of sewerage and storm water management services is proposed in 10 towns. The State Urban Development and Housing Department is the Executing Agency while the Madhya Pradesh Urban Development Company (MPUDC) Limited is the implementing agency for the Program. B. Project Description 5. Coverage: As per revised procurement plan, MPUSIP’s physical components include (a) improvements to water supply scheme in 69 subproject towns, and (b) sewage collection and treatment services proposed in four (4) identified towns namely Saikheda, Sanawad, Anjad and Badwaha under Phase I while in Phase II – water supply scheme in 59 subproject towns and sewage collection and treatment services proposed in eight towns namely Sanchi, Dhamnod, Mandsaur, Nagda, Jabalpur (part-II), Maihar, Khajuraho & Rajnagar. The objective of the proposed improvements in subproject towns is to achieve safe and sustainable water services both in terms of services to customers, cost recovery and conservation of precious water resources. The project proposals envisage providing 100% coverage of population with 1 In the context of involuntary resettlement, displaced persons are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages55 Page
-
File Size-