San Bernardino SOSEO8 Los Angeles County County Riverside Villa County Park Reservoir Orange Project Orange County Pacific Ocean H a n d Orrange y S C a re n e ti Miles k a g o 0 8 C an Irvine ntiago Cree k 241 yo Sa n Rd Regional Legend Park Stream Gauge Selected Streams Santiago Hills II: Cha East Orange Area 1: pm Stage 2 J a Selected Roads a n Stage 3 m A v e b n o u Water Bodies re e e R d Regional Park County Boundary City Boundary PCR SHII: Stage 1 Irvine Lake SHII: Stage 2 East Orange Area 1: Stage 3 Santiago Hills II: h s a Stage 1 W n o Tusttiin Footthiilllls y n a C rs te S e an P tia Can go yon Rd Figure 2-1 261 241 Santiago Hills II and East Orange Area 1: Project Location Map Tusttiin (Roads and water bodies provided by RBF Consulting) Feet May 2005 GeoSyntec 0 2,250 4,500 P:\GIS\Irvine\SHii\projects\May(05)\SantiagoHillsII(Fig_2-1).mxd Consultants Stage 1 Stage 2 Ultimate Conditions Irvine Irvine Irvine Regional Regional Regional Park Park Park ntiago tia Sa Cree Santiago Cr San go C k eek reek J a J J a a m m m b b b o o r o e 1 r 1 r 1 4 e 4 e 4 e 2 e 2 e 2 R R R R S R S R S d d d PCR PCR PCR Irvine Lake Irvine Lake Irvine Lake 61 61 1 2 2 26 R R R S S S h s h h s s a a a W W W n S n n o an o Sa o Sa y tia go Can y ntia y nti n yon Rd n go Canyon Rd n a go Canyon R a a a d C C C rs rs rs te te e e S e S et S P R P R P R 2 2 2 4 4 4 1 1 1 Feet 0 3,000 6,000 Legend Figure 2-2 Land Uses Santiago Hills II and East Orange Area 1: Major Streams Single Family Residential Park Land Use Delineations for Stage 1, Stage 2 Improved Conveyance Multi Family Residential Open Space and Ultimate Conditions Water Bodies School Future Development Irvine Regional Park Road (Water bodies, and land use delineations provided by RBF Consulting) Prepared by The Irvine Company for GeoSyntec May 2005 Consultants P:\GIS\Irvine\SHII\projects\May(05)\SantiagoHillsII(Fig_2-2).mxd Consideration by the City of Orange S a n t i a g o C a n y o n R Irvine d Santiago C Regional reek Park D 1 24 R S anyon C E t C reek on T m H C re a - F C 7 n E d ha y pm C a T C J E a n - r A T e m v B 6 e b en C o k u - C r e 9 e Black Willow e R Forest d Lacustrine North Area Tributary PCR A Irvine Lake So T u ri th bu ta ry h s a W n o y n a C s r e t e P S R 2 6 1 Canyo go n R ntia d ry Sa buta ri T S s R ' E y 2 d 4 1 o o W Lower Peters Canyon Retention Basin Feet 0 2,250 4,500 Legend Existing Subwatershed Areas Selected Roads Area A Ephemeral Tributary Figure 2-3 Intermittent Tributary Area B Santiago Hills II and East Orange Area 1: Major Streams Area C Existing Subwatershed Areas and Natural Tributaries Improved Conveyance Area D Water Bodies Area E Lower Peters Canyon Retention Basin (Roads, water bodies, and subwatershed delineations provided by RBF Consulting) Irvine Regional Park Black Willow Forrest Lacustrine Area Prepared by The Irvine Company for GeoSyntec May 2005 Consideration by the City of Orange Consultants P:\GIS\Irvine\SHII\projects\May(05)\SantiagoHillsII(Fig_2-3).mxd S a n t i a g o C a n y o n R antiag d S o Cree Irvine k Regional Park 1 24 R S yo t Can n Creek on m H C re h F a ap B n m d Drainage 4 an y A C J v a e r n e m u e b e D k o r e Drainage 5 e R d Drainage 3 C Drainage 6 PCR Drainage 3 Drainage 1 Irvine Lake Drainage 2 h A s a W n o y Drainage 7 n a C s r e t e P S R 2 6 1 o Canyon iag Rd Sant S R 2 4 E 1 Lower Peters Canyon Retention Basin Feet 0 2,250 4,500 Legend Proposed Subwatershed Areas Selected Roads Area A Major Streams Area B Figure 2-4 Improved Conveyance Area C Santiago Hills II and East Orange Area 1: Water Bodies Area D Subwatershed Areas and Drainage Areas- Ultimate Conditions Drainage Boundary Area E Lower Peters Canyon Retention Basin (Roads, water bodies, and subwatershed delineations Irvine Regional Park provided by RBF Consulting) Prepared by The Irvine Company for GeoSyntec May 2005 Consultants P:\GIS\Irvine\SHII\projects\May(05)\SantiagoHillsII(Fig_2-4).mxd Consideration by the City of Orange Weir Canyon Fremont Blind Canyon Canyon Black Star Canyon Handy Santiago Creek Creek Ladd Baker Canyon Canyon Silverado Limestone Canyon Canyon Williams Canyon Harding Canyon Santiago Creek Watershed Figure 2-5 Santiago Creek Watershed and Subwatersheds (Source: http://www.ocwatersheds.com/watersheds/santaana_santiago_subwatershed.asp) Prepared by The Irvine Company for GeoSyntec May 2005 Consideration by the City of Orange Consultants ek go Cre ntia Sa Irvine 6A2 Regional Park 1 24 6A1 R S G1 G2 J G3 C8 6D2 C2 E 2A F2 6D1 2B C1 PCR B1 A1 HR1 S R 2 6G 6 1 S ant iago Cany on Rd S R 2 4 1 Legend Hydrodynamic Separator System (HSS) Treatment Swale Selected Roads Major Streams Extended Detention Basin Emergent Marsh Irvine Regional Park Water Body Feet 0 625 1,250 2,500 Nutrient Source Control Areas (Fertilizer Application Reduction) Non-Impact Open Space (Tributary to Emergent Marshes) Preserved Open Space Areas Treated By: Figure 5-1 Hydrodynamic Separator System Santiago Hills II and East Orange Area 1: Extended Detention Tributary Areas to Treatment System and Locations for Treatment Control PDFs Extended Detention, Hydrodynamic Separator System Treatment Swale, Hydrodynamic Separator System (Roads, water bodies, and BMP Locations Extended Detention, Treatment Swale provided by RBF Consulting) Extended Detention, Hydrodynamic Separator System, Bioretention Prepared by The Irvine Company for GeoSyntec Extended Detention, Bioretention May 2005 Consideration by the City of Orange Consultants P:\GIS\Irvine\SHII\projects\May(05)\SantiagoHillsII(Fig_5-1).mxd S R 2 4 1 6A2 2A C 2B HAPMAN AVENUE 6A1 C2 G1 C3 C1 VS G2 -G 1 C8 S R 2 G3 6 1 4 F2 -C C4 VS E J AM C5 BO S R V Feet E S R E V - 0 375 750 S B1 S R - 2 O C 2 A 5 4 D 1 Legend B2 Hydrodynamic Separator System (HSS) Land Use C6 B3 Streams Multi Family HR1 B4 C7 6 Flow Path Park V S-C Water Body Road Catchment Boundary School Subwatershed Boundary Single Family VS-B3 VS-B4 Areas Treated with Bioretention Open Space From Extended Treatment or Conveyance Swales A2 Detention Basin VS HR1 Extended Detention Basin -A2 V Emergent Marsh S - S 1 A1 Figure 5-2 Santiago Hills II and East Orange Area 1: Peters Proposed Treatment Systems for Areas Canyon Tributary to PCR Reservoir (Roads, water bodies, grading plan and BMP locations provided by RBF Consulting) Mary 2005 GeoSyntec P:\GIS\Irvine\SHii\projects\May(05)\SantiagoHillsII(Fig_5-2).mxd Consultants Plan View Max Elevation of Extended Detention Pool Forebay Inflow Vegetated Low Flow Channel Outflow Maintenance Access Rd Profile Influent Pipe WQ Elevation Riser Pipe Forebay Figure 5-3 Conceptual Illustration of an Extended Detention Basin (Adapted from CA BMP Handbook, 2003) GeoSyntec May 2005 Consultants Plan View Diversion Weir High Flows Over Weir Weir Box Inlet Outlet Separation Screen Profile High Flow Bypass Inlet Outlet Separation Screen Figure 5-4 Conceptual Illustration of a Typical Hydrodynamic Separator System (schematic by CDS Technologies) GeoSyntec May 2005 Consultants Plan View Energy Dissipater Inlet Side Slope: 4H :1V or less Outlet Roadway Check dam Bottom Slope: 2- 6% if bottom slope exceeds 4% Flow Spreader Profile 6” Min Topsoil Roadway Grass height exceeds water quality design flow by 2” Flood Flow Depth Water Quality Depth 6” Freeboard 1 Shoulder 4 Swale Vegetation: Small plants, tall grasses and shrubs Swale Width (recommended 3ft,channel divider if >10ft) Figure 5-5 Conceptual Illustration of a Treatment Swale (Adapted from CA BMP Handbook, 2003) GeoSyntec May 2005 Consultants Plan View Parking Lot Sheet Flow Curb Stops Stone Diaphragm Grass Filter Strip Optional Sand Layer Outlet Gravel Curtain Drain Overflow Underdrain Collection System Profile Curb Stop Stone Diaphragm Gravel Curtain Drain Optional Sand Filter Layer Underdrain Figure 5-6 Conceptual Illustration of a Bioretention Facility (Adapted from CA BMP Handbook, 2003) GeoSyntec May 2005 Consultants Portland, Oregon Chino, California Chino, California Chino, California Figure 5-7 Examples of Bioretention Facilities GeoSyntec May 2005 Consultants 533 532 531 530 529 528 water surface elevation (ft) elevation surface water 527 526 525 1/1/2002 3/6/2002 5/9/2002 7/12/2002 9/14/2002 11/17/2002 1/20/2003 3/25/2003 5/28/2003 7/31/2003 10/3/2003 Existing Condition Project condition Figure 7-1 Peters Canyon Reservoir Modeled Water Surface Elevation Source: Flow Science (8/30/04) GeoSyntec May 2005 Consultants eek Cr 6A go 6A2 tia an S 1 24 6A1 R S G1 6A2 G1 G2 G2 J G3 F2 6A1 G3 E 6D2 C8 2A E 6D2 2A C5 C2 C4 C7 C3 C6 6D1 C1 2B J SWALE B4 S2 A2 B1 S2 6D1 PCR B1 2B A1 S1 A1 h s a HR1 W n B3 o y HR1 n a C s r e t e 6G P HR1 S R 2 6G 6 1 San tiago Cany on Rd S R 2 4 1 Feet 0 625 1,250 2,500 Legend Soil Texture Hydrodynamic Separator System Clay Treatment Swale Clay Loam Gravely Loam Figure C-1 Major Streams Loam Santiago Hills II and East Orange Area 1: Improved Conveyance Loamy Sand Soil Texture Map Selected Roads Outcrop Water Body Sand (Roads, water bodies, and BMP Locations Sandy Loam provided by RBF Consulting) Extended Detention Basin Silt Loam Emergent Marsh A1 Catchment Boundary Prepared by The Irvine Company for GeoSyntec May 2005 Consideration by the City of Orange Consultants P:\GIS\Irvine\SHII\projects\May(05)\SantiagoHillsII(Fig_C-1).mxd .
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages15 Page
-
File Size-