Ashley River/Rakahuri Management Strategy a Community Vision

Ashley River/Rakahuri Management Strategy a Community Vision

Ashley River/Rakahuri Management Strategy A Community Vision Prepared for: The Ashley River/Rakahuri Advisory Group July 2008 Adopted for: Inclusion in the Environment Canterbury Long Term Council Community Plan 2009/19 Table of Contents What is the Ashley River/Rakahuri Management Strategy? 2 Introduction 3 Terms of Reference 4 The Process 4 Summary of Goals and Objectives 5 Goal 1 6 Goal 2 9 Goal 3 11 Implementation and Monitoring of the Plan 17 Advisory Group Summary of Findings 17 Public Meetings Input 20 Outline of Proposals by River Section 22 Map 1 - Strategy Area 25 Map 2 - Okuku River to Rossiters Road 26 Map 3 - Rossiters Road to Tulls Road 27 Map 4 - Tulls Road to Waikuku Beach 28 1 What is the Ashley River/Rakahuri Management Strategy? This management strategy There are three overall goals for the strategy. Some of the objectives which follow and many of the actions • is an outcome of the investigation into the establishment which are intended to achieve these, will help to of an Ashley Rakahuri Regional Park achieve more than one of the goals. • has been prepared by community representatives Area covered • sets goals and clear objectives which are intended The strategy covers both sides of the Ashley River/Rakahuri to guide Environment Canterbury’s future management from the Coastal Marine Reserve (approximately one of the Ashley River/Rakahuri kilometre upstream of the river mouth) to the confluence • describes the many actions necessary to achieve of the Okuku River. See Map 1 these goals with indications of priority and timing. This strategy does not include the Ashley River/ The essential elements of the strategy are contained Rakahuri Estuary. in the tables of goals, objectives and actions. 2 Introduction The significant majority of the Ashley River/Rakahuri bed and of the Waimakariri River Regional Park, a proportion of the Ashley River/Rakahuri Liaison Committee adjacent berm within the river protection stopbanks from the anti-social behaviour previously experienced there including Okuku confluence downstream to the Coastal Marine Reserve rubbish and car dumping has transferred to the Ashley Ashley River/Rakahuri Rivercare Group is vested in Environment Canterbury through the Ashley River River/Rakahuri. Combined 4WD Clubs Improvement Act 1925, for river protection works or as an Until the passing of the Local Government Act 2002, endowment to generate funds for river protection works. The Environment Canterbury’s management of this land was Community representatives from Rangiora, land totals approximately 1700 hectares. This includes 280ha constrained to functions authorised by the Soil Conservation Ashley and Fernside of leased land which helps finance river works and 137ha of and Rivers Control Act. This limited the opportunities to protection pine forest, run as a commercial forest. There are promote, develop and manage recreational use of the river. Department of Conservation also sections of the riverbed and adjoining berm that are in private ownership. These are shown on Map 1. This management strategy has grown from a community desire North Canterbury Fish & Game to better integrate the protection and endowment management The boundaries for the strategy, which include the of this land and ecological values with recreation use. North Canterbury Cycling Club Environment Canterbury (ECan) and private land associated with the Ashley River/Rakahuri, are shown on Map 1 and The programme to produce the strategy included public Christchurch Readymix fall within the Waimakariri District Council territory. meetings followed by a consultative process with an advisory group which was formed from the initial public meetings and Taggarts Earthmoving Due to the close proximity of Christchurch City and the invitations to key stakeholders. The advisory group includes townships of Waikuku Beach, Ashley and Rangiora, the Te Kohaka o Tuhaitara Trust representatives from: river and berm land has always been used by the public for recreation and leisure activities. Today, these populations Te Ngai Tuahuriri Runanga have expanded and new forms of recreation have developed Waikuku Community Group placing considerable pressure and competing demands upon the river and its ecology. Additionally with the development Waimakariri District Council 3 The Process Public meeting held May 2007 Series of public meetings, Advisory Group established to oversee June – November 2007 strategy preparation, December 2007 Presentations from mana whenua, statutory authorities, recreation groups, environmental groups, community groups Draft Management Strategy prepared, and individuals. March – May 2008 SWOT analysis completed, ‘wish lists’ prepared. Community feedback, May - June 2008 Draft Strategy revision & final Strategy release Draft Management Strategy presented to WDC, DOC, Iwi 2008 Plan Implementation Terms of Reference The terms of reference for the Ashley River/Rakahuri • advise on how to enhance the public s understanding • provide information to ECan relating to present and future Advisory Group are: and value of the flood protection system and the recreational opportunities in the Ashley River/Rakahuri river environment The Advisory Committee shall meet as necessary to: • comment on draft documents leading to the preparation of • advise on how to lead the public to use Ashley River/ a non statutory Concept Development Plan • help determine ways of managing the sustainable Rakahuri sensitively development of recreational use of the Ashley River/ It is hoped that this group or others from their Rakahuri providing for flood protection and • provide information to ECan relating to the natural organisations will stay on to assist in the development natural values values in the Ashley River/Rakahuri of detailed proposals and their implementation. 44 Mission Statement: “Enhance Ashley River/Rakahuri Diverse Values” Summary of Goals and Objectives GOAL 1: GOAL 2: GOAL 3: TO PROVIDE FOR ESSENTIAL RIVER MANAGEMENT TO PROTECT AND ENHANCE THE NATURAL TO PROVIDE FOR SAFE AND BALANCED RECREATION AND FLOOD MITIGATION OPERATIONS SAFELY ENVIRONMENT. WITH A MINIMUM OF CONFLICT BETWEEN WIDELY AND EFFECTIVELY WHILE CAUSING A MINIMUM OF DIFFERENT USER GROUPS. Objective 4 DISTURBANCE TO NATURAL AND RECREATIONAL Objective 7 VALUES AND USERS. Restore, maintain and protect the river’s mauri (life force). Protect and enhance the sport fishery of the Ashley Objective 1 Objective 5 River/Rakahuri. Protect the full range of distinctive bird populations and Recreational users and residents understand the flood Objective 8 protection system and the necessity for protection habitats of the lower Ashley River/Rakahuri. Recreational users value the river environment and the operations including shingle extraction. Objective 6 flood protection system and use them sensitively with­ Objective 2 Protect and enhance populations and habitats out causing damage. of native plant and animal species. Develop detailed procedures for the management Objective 9 of river protection operations in association with Recreational river users will have a clear understanding wildlife and habitat protection. of what activities are welcomed and appropriate Objective 3 in different sections of the river. Separate machinery and truck movements from Objective 10 other river users wherever practicable. Sections of the river are attractive, natural and safe areas to visit for family recreation. Objective 11 Recreational opportunities are maintained and extended. Objective 12 Noisy and dangerous misuse of vehicles is eliminated in the heavily used lower sections of the river and minimised elsewhere. 5 GOAL 1: To provide for essential river management and flood mitigation operations safely and effectively while causing a minimum of disturbance to natural and recreational values and users. Objective 1: Recreational users and residents understand the flood protection system and the necessity for protection operations including shingle extraction. Performance measure: An increasing trend in river users’ understanding of the protection system and shingle operations. Measured by annual survey. Map No. Action Explanation Priority Funding Number 1.1 The main entrances to the river will be upgraded The existing entrances are open, dusty and High 2-4 This is one of the more expensive actions. to reflect its high community value. The upgrade industrial, inviting misuse of the river and The progress and scale will be determined will include integrated traffic management, planting, its surrounds. The entrances need to be by the funding stream available. This action signage, information kiosks and night gates. welcoming with appropriate information will be a priority if a Regional Park is established. readily accessible. Information kiosks will be located at the main entrances on either side of the river. These will inform the public on a wide range of issues including river management and flood mitigation. 1.2 ECan will continue to work with a wide range Different sections within ECan are responsible Immediate 1 Existing budget of recreational and resident groups to minimise for different aspects of ECan’s work and these conflict with river protection operations. groups will work with the community depending on their responsibilities. 1.3 Interpretive material by way of the ECan website, The works required to manage the river are not Staged 1 Progress will depend on Ashley Rating District leaflets, information panels. well understood. For example trail bike riders as per or Regional Park funding.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    30 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us