A Practical Guide to Implementing Integrated Water Resources Management & the Role of Green Infrastructure Prepared for: Prepared for: Funded by: Prepared by: May 2016 ACKNOWLEDGEMENTS Environmental Consulting & Technology, Inc. (ECT), wishes to extend our sincere appreciation to the individuals whose work and contributions made this project possible. First of all, thanks are due to the Great Lakes Protection Fund for funding this project. At Great Lakes Commission, thanks are due to John Jackson for project oversight and valuable guidance, and to Victoria Pebbles for administrative guidance. At ECT, thanks are due to Sanjiv Sinha, Ph.D., for numerous suggestions that helped improve this report. Many other experts also contributed their time, efforts, and talent toward the preparation of this report. The project team acknowledges the contributions of each of the following, and thanks them for their efforts: Bill Christiansen, Alliance for Water Efficiency James Etienne, Grand River Conservation Christine Zimmer, Credit Valley Conservation Authority Authority Cassie Corrigan, Credit Valley Conservation Melissa Soline, Great Lakes & St. Lawrence Authority Cities Initiative Wayne Galliher, City of Guelph Clifford Maynes, Green Communities Canada Steve Gombos, Region of Waterloo Connie Sims – Office of Oakland County Water Julia Parzens, Urban Sustainability Directors Resources Commissioner Network Dendra Best, Wastewater Education For purposes of citation of this report, please use the following: “A Practical Guide to Implementing Integrated Water Resources Management and the Role for Green Infrastructure”, J. W. Ridgway, R. Higuchi, L. Hoffman, and R. Pettit, Environmental Consulting & Technology Inc. Report, 30 pp, May 2016. Lastly, communications can be directed to [email protected]. Project Team John Jackson – Great Lakes Commission, Project Director Ryan Higuchi – Environmental Consulting & Technology, Inc., Project Engineer Lauren Hoffman – Environmental Consulting & Technology, Inc., Green Infrastructure Topic Leader Victoria Pebbles – Great Lakes Commission, Project Manager Robert Pettit – Environmental Consulting & Technology, Inc., Project Scientist Rebecca Pearson – Great Lakes Commission, Project Manager James W. Ridgway, PE – Environmental Consulting & Technology, Inc., Project Manager TABLE OF CONTENTS Section Page 1.0 INTEGRATED WATER RESOURCES MANAGEMENT – A GUIDE FOR MUNICIPAL USE ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 1 1.1 Integrated Water Resources Management ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 3 1.2 Implementation ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 4 2.0 ESTABLISH MUNICIPALITY SPECIFIC PRIORTIES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 2.1 Establish A Steering Committee ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 5 2.2 Prioritize the Challenges ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 7 3.0 ASSEMBLE AVAILABLE INFORMATION ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 9 4.0 PROVIDING COST‐EFFECTIVE DRINKING WATER SOURCES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 10 5.0 PROVIDING COST‐EFFECTIVE WASTEWATER MANAGEMENT ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 11 6.0 PROVIDING COST‐EFFECTIVE DRAINAGE SYSTEMS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 13 6.1 Value of Green Infrastructure ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 13 6.2 Understanding the Cost of Green Infrastructure ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 15 6.3 Selecting Design Drivers ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 17 6.4 Prioritizing Green Infrastructure Projects ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 18 7.0 IDENTIFYING & PRIORITIZING PROJECT LISTS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 20 7.1 Maximize Benefit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 20 7.2 Minimize Cost & Maximize Benefit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 22 8.0 IDENTIFYING FUNDING NEEDS & OPPORTUNITIES ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 23 9.0 A PRACTICAL PATH FORWARD – AGGREGATING PROJECTS FOR LARGE‐SCALE IMPLEMENTATION ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 24 9.1 Task 1 – Identifying the Existing Condition ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 24 9.2 Task 2 – Data Collection ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 25 9.3 Task 3 – Water Budget ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 26 9.4 Task 4 – Prioritize Potential Projects ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 26 9.5 Task 5 – Economic & Sustainable Analysis ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 27 9.6 Task 6 – Implementing the Strategy ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 28 A Practical Guide to Implementing Integrated Water Resources Management & the Role of Green Infrastructure i 10.0 BIBLIOGRAPHY ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 30 List of Tables Table 6‐1: A comparison of green infrastructure cost savings (ASLA 2015) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 14 Table 6‐2: Stand‐alone costs and the relationship to incremental costs ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 17 List of Figures Figure 1‐1: IWRM is a nexus of best practices related to potable water, wastewater, and stormwater ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 4 Figure 6‐1: Answer to question “How did use of GI impact costs” in a survey of 465 Case studies from across the country ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 15 Figure 6‐2: Costs and cumulative volume of stormwater removed from the CSO System through various gray and green strategies ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 15 Figure 6‐3: Incremental cost per square foot managed ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 16 Figure 6‐4: Incremental cost per annual gallon captured ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 16 Figure 7‐1: Identifying least cost management practices at a community park ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 22 List of Appendices Appendix A Selecting Design Drivers A Practical Guide to Implementing Integrated Water Resources Management & the Role of Green Infrastructure ii 1.0 INTEGRATED WATER RESOURCES MANAGEMENT – A GUIDE FOR MUNICIPAL USE This guide was developed to aid municipalities that are considering implementing integrated water resources management (IWRM). It provides a brief summary of the type of information that should be considered, a series of questions that can guide a municipality to a logical position, a recommendation of how best to proceed, and an example of how to implement this guidance, including tools to aid the municipality. Each section also includes a series of links to other notable, related articles/tools. IWRM can provide sustainable practices that address water resource challenges in a comprehensive manner. Because water management is impacted by many entities, changes are likely to be slow and incremental. This guide is divided into eight sections listed below: Section 1 – Integrated Water Resources Management – A Guide for Municipal Use Section 2 – Establish Municipality Specific Priorities Section 3 ‐ Assemble Available Information Section 4 ‐ Providing Cost‐Effective Drinking Water Systems Section 5 ‐ Providing Cost‐Effective Wastewater Management Section 6 ‐ Providing Cost‐Effective Drainage Systems Section 7 – Identifying & Prioritizing Project Lists Section 8 ‐ Identifying Funding Needs & Opportunities Section 9 ‐ A Practical Path Forward ‐ Aggregating Projects for Large‐Scale Implementation This guide addresses the hydrologic cycle as it affects municipalities ‐ water supply and distribution; wastewater collection and treatment; and stormwater management. However, special emphasis is given to stormwater management and the use of green infrastructure. While water supply and wastewater treatment are highly regulated with specific performance standards, stormwater remains less regulated – even though it has tremendous impact on the hydrologic cycle and water and wastewater management. Effective integrated water resources management requires efficient and powerful stormwater management that encourages infiltration, reduces peak flows, and scales down total runoff volumes. Appropriately designed, constructed, and maintained green infrastructure is capable of delivering these results. Preparing a successful integrated management plan can be a staged, multi‐step process targeting the root causes of water management challenges, presents options for best management practices, and provides a cost benefit analysis to guide the decision‐making process. The plan must address the unique challenges of each municipality. It should also provide a cost‐efficient method of retrofitting aging infrastructure in a resilient, sustainable way – all within restricted operating budgets. An integrated management approach simultaneously manages drinking water, wastewater treatment, and stormwater and offers a cost‐effective, alternative solution to address expensive infrastructure improvement costs. A Practical Guide to Implementing Integrated Water Resources Management & the Role of Green
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages38 Page
-
File Size-