Apresentação Do Powerpoint

Apresentação Do Powerpoint

Município de Itatiaia/RJ Brazil Characterization of the Municipality State of Rio de Janeiro / Brazil; Region of Agulhas Negras, Middle Paraíba, South of the State; 225.54 km² of Território; 30 thousand residents; O, 737 of IDH-M (16th of the State of Rio de Janeiro and 850 of Brazil); 03 Administrative Units (Centro, Penedo and Maringá / Maromba). Special features First National Park for the Conservation of Biodiversity of the Atlantic Forest; It belongs to the Region with the second largest automotive pole in the country, behind only the São Paulo ABC; Largest Tourist Pole in the Agulhas Negras Region (Itatiaia, Resende and Porto Real) with more than one million visitors per year. PROJECTS FOR SUSTAINABLE URBAN DEVELOPMENT Mobility and Urban Accessibility; Environmental sanitation; Family Living Spaces. Mobility and Urban Accessibility MAIN PROBLEMS FOOTWEAR WITH BARRIERS ACCESSIBILITY AND MOBILITY, ESPECIALLY, FOR ELDERLY AND DISABLED PEOPLE; CYCLE FAILURE OR TRACK CYCLE; UNEXISTENT OR INADEQUATE URBAN FURNITURE; PROPOSALS ACCESSIBLE FOOTWEAR WITH STANDARDS FOR THE FREE MOVEMENT OF ALL; IMPLANTATION OF CYCLOPAXES AND BICYCLES; INCENTIVE TO SHARED TRAFFIC (BICYCLES AND VEHICLES); IMPLANTATIONS OF SUSTAINABLE FURNITURE. FOOTWEAR AND SHARED TRAFFIC PARKLET STANDARDS OF BUS SHELTERS Sanitation Environmental MAIN PROBLEMS NEARLY 10 THOUSANDS OF INHABITANTS ARE NOT SERVED WITH SANITARY SEWAGE COLLECTION SERVICES; NO COLLECTED SEWAGE IS TREATED; Itatiaia Center Construction of 01 Sewage Treatment Plant; Construction of 02 Sewage Lift Station; Construction of 09 Fossa Filter; Planned 21,543.24 m of pipe with diameter of 150 mm, 344.27 m with diameter of 200 mm, 329.51 with diameter of 250 mm for sewage network; 4,309 families served with sewage network; Itatiaia/RJ Penedo Construction of 01 Sewage Treatment Plant; Construction of 07 Sewage Lift Station; Construction of 14 Fossa Filter; Predicted 23,836.68 m of pipe with a diameter of 150 mm, 1,586,39 m with a diameter of 200 mm, 1,544,87 m with a diameter of 250 mm for sewage network; 8,444 families served with sewage network; Penedo - Itatiaia/RJ Family Living Space MAIN PROBLEMS PUBLIC EQUIPMENT OF LEISURE AND SPORTS WITHOUT MAINTENANCE OR INADEQUATE; MUNICIPAL THEATER WITHOUT SAFETY AND IMPROPER STANDARDS FOR USE; IMPROPER AREAS FOR FAMILY ENROLLMENT. PROPOSALS PUBLIC SPORTS AND LEISURE SPACES WITH FURNISHED FURNITURE; IMPLEMENTATION OF ACADEMIES OUTDOORS; NEW PUBLIC PREMISES; NEW AREAS OF SPORTS AND LEISURE; REFORM AND REVITALIZATION OF THE MUNICIPAL THEATER. PRACTICES PENTICO PENEDO THEATER ITATIAIA Thank you! Carlos César de Cima Aires Secretary of Planning - Itatiaia / RJ – Brazil (24) 3352-2316 [email protected].

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    47 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us