City of Tampa Surtax for Transportation Improvements 2020 Project Plan Presentation Overview

City of Tampa Surtax for Transportation Improvements 2020 Project Plan Presentation Overview

City of Tampa Surtax for Transportation Improvements 2020 Project Plan Presentation Overview ▪ Guiding Principles ▪ Background ▪ AFT City of Tampa Calendar Year 2020 Project Plan ▪ Program Areas (Project Types) ▪ Proposed Projects ▪ Certification Statement ▪ Questions Transportation Surtax – City of Tampa Proposed 2020 Project Plan 2 Guiding Principles: Rethinking Mobility ▪ Implement within the City of Tampa. ▪ Make walking and biking more comfortable and convenient for short trips by expanding the City’s network of trails and greenways. ▪ Make transit a viable option for medium or long trips by focusing on land use and transit planning along key corridors. ▪ Incorporate safety, equity, health, sustainability and resiliency into all transportation initiatives. ▪ Use “City as a Lab” approach to test new ideas and innovation – such as evolving parking garages into smart mobility hubs, and harnessing solar energy to power traffic signals. Transportation Surtax – City of Tampa Proposed 2020 Project Plan 3 Background ▪ Comprehensive Plan & Long Range Transportation Plan ▪ Citywide Mobility Plan updated in 2012 ▪ Walk-Bike Plans 2012-2016 ▪ Ph 1 – Downtown, Westshore & University Areas ▪ Ph 2 – Interbay Peninsula & West, Central & East Tampa ▪ Ph 3 – New Tampa ▪ Ph 4 – Downtown & Channel District ▪ Ph 5 – Green ARTery Perimeter Trail Transportation Surtax – City of Tampa Proposed 2020 Project Plan 4 Background Public Engagement Project Prioritization: ▪ Maintenance Needs ▪ Safety Issues ▪ Congestion & Bottlenecks ▪ Walk/Bike Network Leveraging grant opportunities, partnerships and existing resources Transportation Surtax – City of Tampa Proposed 2020 Project Plan 5 Programs & Project Types AFT Surtax Project Plan: Overview City of Tampa Project Plan – Project Types These program areas represent the types of projects the City will be directing surtax revenue towards. ▪ Complete Street & Safety Corridor Improvements ▪ Congestion Relief & Intersection Projects ▪ Neighborhood/Area-wide Improvements ▪ Walk & Bike Improvements ▪ Bridges & Seawalls ▪ Transit Projects ▪ Citywide Programs Transportation Surtax – City of Tampa Proposed 2020 Project Plan 7 AFT 2020 Project Plan: Buckets & Project Types Maintenance Bike/Ped Project Types: Congestion Safety Project Types & Vulnerability Network Citywide Programs ✓ ✓ ✓ ✓ Corridor Projects ✓ ✓ ✓ ✓ Congestion & Intersection Projects ✓ ✓ Neighborhood Improvements ✓ ✓ Walk/Bike Projects ✓ ✓ Bridge & Seawall Projects ✓ ✓ ✓ Transit Projects ✓ Transportation Surtax – City of Tampa Proposed 2020 Project Plan 8 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Planning & Program Management Citywide Programs ▪ Citywide Mobility Master Plan ▪ Robust public engagement & outreach Corridor Projects ▪ Future vision & framework Congestion & ▪ Guides future project plans Intersection Projects ▪ Program Management Neighborhood ▪ Management & Production Support Improvements Walk/Bike Projects Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 9 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Citywide Programs Citywide Programs ▪ Smart Street Lights Corridor Projects ▪ Smart Mobility ▪ School Safety Improvements Congestion & Intersection Projects ▪ Roadway Signage Neighborhood ▪ Pavement Markings Improvements ▪ Vision Zero Programs Walk/Bike Projects ▪ Sidewalks – Assessments, Maintenance, Filling Gaps Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 10 AFT Surtax 2020 Project Plan PROJECT TYPES: Project Types Complete Street & Safety Corridor Program th th Citywide Programs ▪ 109 Ave., Nebraska to 30 ▪ Columbus Dr., Nebraska to 14th CorridorCorridor ProjectsProjects ▪ Grady Ave., Spruce to Columbus ▪ 21st Ave., Nebraska to 50th St. Congestion & Intersection Projects ▪ 22nd St., Busch to Fowler Neighborhood ▪ Main St., MacDill to Willow Improvements ▪ El Prado Blvd., West Shore to Bayshore Walk/Bike Projects ▪ Cypress St., Himes to N. Boulevard Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 11 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Congestion Relief & Intersection Citywide Programs Improvements ▪ Interbay Blvd., Manhattan to Himes Corridor Projects ▪ Ybor City Traffic Signals Congestion & Intersection Projects ▪ Zack St. Traffic Signals Neighborhood ▪ Sligh Ave. at Rowlett Dr. Improvements Walk/Bike Projects Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 12 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Neighborhood Resurfacing & Improvements Citywide Programs ▪ North Bon Air Corridor Projects ▪ North Tampa ▪ University Square Congestion & Intersection Projects ▪ West Shore Palms Neighborhood ▪ Terrace Park &Improvements Improvements Walk/Bike Projects Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 13 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Walk/Bike Improvements Citywide Programs ▪ N Glen Ave., Main to Columbus Corridor Projects ▪ Green ARTery Perimeter Trail ▪ Green Spine Cycle Track Congestion & Intersection Projects Neighborhood Improvements Walk/Bike Projects Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 14 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Bridges & Seawalls Citywide Programs ▪ Bermuda Blvd. Seawall Corridor Projects ▪ Brorein Street Bridge ▪ Cass Street Bridge Congestion & Intersection Projects Neighborhood Improvements Walk/Bike Projects Bridge & Seawall Projects Transit Projects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 15 AFT Surtax 2020 Project Plan ProjectPROJECT Types TYPES: Transit Projects Citywide Programs ▪ Streetcar Phase 3 Extension & Modernization - Design Corridor Projects ▪ Streetcar Extension Phase 4 - Feasibility Congestion & Intersection Projects Neighborhood Improvements Walk/Bike Projects Bridge & Seawall Projects TransitTransit ProjectsProjects Transportation Surtax – City of Tampa Proposed 2020 Project Plan 16 2020 Project Plan: Surtax Allocation Distribution Maintenance/ Congestion Bike/Ped Vulnerability Reduction Safety Network MINIMUM TARGETS PER CHARTER AMENDMENT $9.8M $12.7M $13.2M $5.9M (20%) (26%) (27%) (12%) PROPOSED 2020 PROJECT PLAN $15.4M $13.2M $13.9M $6.4M (31.4%)✓ (27%) ✓ (28.5%)✓ (13.1%)✓ The 2020 Project Plan meets the minimum targets for distribution of surtax proceeds as per the original Charter Amendment. Transportation Surtax – City of Tampa Proposed 2020 Project Plan 17 2020 Project Plan: By the Numbers Certification of 2020 Project Plan ▪ Approved by Tampa City Council on September 5, 2019. ▪ Certified by Chief Transportation Engineer Transportation Surtax – City of Tampa Proposed 2020 Project Plan 19 Thank you.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us