Trans-Adriatic Pipeline

Trans-Adriatic Pipeline

Project of common interest: Trans-Adriatic Pipeline (TAP), including metering and regulating station (M/R) and compressor station (CS) at Nea 7.1.3 Messimvria (EL) PCI fiche Southern Gas Corridor PCI 7.1.3 - Gas compressor station CATEGORY BY PL PCI 7.1.3 - Gas pipeline Gas RU Existing pipeline network CZ KZ CLUSTER SK UA AT 7.1: PCI Cluster of integrated, HU Projects belonging to cluster 7.1 dedicated and scalable transport RO Gas pipeline infrastructure and associated BA RS BG equipment for the transportation of a GE IT AZ minimum of 10 bcm/a of new sources TM San EL of gas from the Caspian Region, Foca TR SE LV crossing Azerbaijan, Georgia and LT BY RU SY DE PL Turkey and reaching EU markets in CZ UA AT H U K Z IQ IR R Greece and Italy. IT S RO BG UZ AZ JO TR TM COUNTRIES CONCERNED SY I Q IR Albania (AL) LY EG SA LY EG Greece (EL) SA M AE NE TD SD O Italy (IT) Source: PLATTS, GISCO, European Commission PROMOTERS Technical description Trans Adriatic Pipeline A.G. (TAP TAP Pipeline: new onshore and offshore pipeline between Greece/Turkey and Italy with a total length of approx. 878 km (773 km Pipeline) (AL, EL, IT) onshore and 105 km offshore). Connecting with TANAP at the Greek-Turkish border, TAP will cross Northern Greece, Albania and the DESFA S.A. (EL) Adriatic Sea before reaching Southern Italy, where it connects to the Italian gas network. The initial capacity is 10 bcm/y. The power of the compressor station(s) is 90 MW. PCI WEBSITE(S) For the interconnection of TAP with the Greek transmission system a metering and Regulating station (capacity of 142 GWh/d) will https://www.tap-ag.com/the- be built in Nea Messimvria. Furthermore, a compressor station (27 MW) will be built in Nea Messimvria in order to enable flow pipeline/the-big-picture/the-eu- status. from the Greek system to TAP. Commissioning of the last part of the PCI project enabling the Greek gas transmission system to inject gas to TAP will be commissioned in 2024. LOCATION From the Greece-Turkey border point CEF funding at Kipoi (tie-in to TANAP) to Province 7.1.3-0013-ELIT-S-M-16: Awarded CEF co-funding: 14,018,347 EUR of Lecce (IT) via Nea Messimvria (EL), https://ec.europa.eu/inea/en/connecting-europe-facility/cef-energy/7.1.3-0013-ELIT-S-M-16 Albania and the Adriatic Sea 7.1.6-0007-EL-S-M-16: Awarded CEF co-funding: 243,250 EUR COMMISSIONING DATE https://ec.europa.eu/inea/en/connecting-europe-facility/cef-energy/7.1.6-0007-EL-S-M-16 TAP: 01/2020, M/R: 06/2020, CS: 02/2024 Note: In line with the provisions of the TEN-E Regulation, the content of this document Energy relies on information provided by the promoter(s) of the Project of Common Interest LAST UPDATE and INEA does not guarantee its accuracy. The European Commission and INEA accept December 2018 no responsibility or liability whatsoever with regard to the information contained therein..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us