Issues Pertaining to Government of Chhattisgarh

Issues Pertaining to Government of Chhattisgarh

ISSUES PERTAINING TO GOVERNMENT OF CHHATTISGARH S.No Name of the Issues in Brief Action to be Taken company and location 1 NMDC Ltd. For providing Power Supply for State Government should NMDC Iron & the Integrated Steel Plant at expedite the process of Steel Plant at Nagarnar, Chhattisgarh state getting Forest Clearance Nagarnar, Power Transmission Corporation from Ministry of Chhattisgarh Limited (CSPTCL) has to Environment and Forests construct the following: (MoEF) in respect of a) 400 KV line from Raipur to items at ‘a’ above and Jagdalpur ensure its completion by b) 400/220 KV substation at March-2015 for starting Jagadalpur commissioning activities c) 220KV line from Jagdalpur of the plant. Also for to Nagarnar. item ‘b’, the State For providing the above Government has to hand transmission facilities, as per over the site to the agreed terms with CSPTCL, an contractor for starting amount of Rs.257.81 Cr has the work. CSPTCL shall been deposited by NMDC with also explore the CSPTCL. Orders were placed possibilities of starting for items ‘a’ and ‘b’ in Nov. the work in non-forest 2011 and March 2012 area. respectively Completion times for these jobs are 33 months and 31 months respectively. However, the works are held up due to non availability of forest clearances. NMDC has requested Chhattisgarh State Chhattisgarh State Government Government may to acquire land for the proposed expedite additional land pellet plant contiguous to the site acquisition for about 250 of steel plant at Nagarnar. acres of land for pellet Request has been sent to District plant and other Collector, Bastar District in associated activities. March, 2011. Mining Lease ML application for Sadartera Early grant of ML for (ML) granting Dolomite Block over an area of the required area. for Sadartera 5.259 Sq. Km. is required to be Dolomite granted by the State Block Government. All required informations have been submitted to the District Collector, Bastar on 21.12.2011. In addition to this, as desired by Secretary, Mineral Resource Department (MRD) necessary NOC’s from Forest Dept,, village panchayats etc. have been submitted to District Collector, Bastar on 10.01.2012. 2 TATA STEEL Land has been acquired by the State Government should LIMITED Government of Chhattisgarh and be requested to expedite transferred to Chhattisgarh State approval/ resolutions of Chhattisgarh Industrial Development issues. Steel Plant Corporation (CSIDC) for TSL has signed allotment to TSL on 99 years a MoU with lease. Letter of intent has been Government of issued by CSIDC to TSL Chattisgarh for informing that land has been setting up a 5.5 acquired for the project and can MTPA be allotted to TSL. TSL has Integrated Steel requested for demarcation of the plant at Baster. said land before taking possession of the same. The work has not commenced. 3 Monnet Ispat & PL for Maabamleshwari Iron ore Request for the PL to be Energy Ltd. mines was allotted to them on restored at the earliest 25/10/2010. After commencement of work and 1.5 MTPA investment of money the PL was Integrated Steel cancelled by the Minerals Plant at Resource Department (MRD), Raigarh, Chhattisgarh on 13/12/2011 on Chhattisgarh grounds of certain formalities not having been met. The cancellation has been stayed by the Tribunal, Ministry of Mines. Land acquisition for Rajgamar SECL should be advised to Dipside (South of Phulkadih transfer the land Nala) Coal Block. Total mining immediately as the mining Lease Hold Area is 625 Ha, out lease can be signed only of which 450 Ha of area already after land acquisition. acquired by SECL under CBA Act. They have requested for SECL to transfer the land on 21/1/2011. In this process, joint survey of the mine by the surveyors of Monnet and SECL has been completed on 15/2/2012. Detailed Land schedule is prepared and further action for surrender of Mineral Rights for overlapped land is pending with SECL. Coking coal and iron ore linkage The State Government and required. Even after meeting the Ministry Coal to be advised raw material requirements from to provide required captive mines there remains a linkages. shortfall 4 Jindal Steel & Land Acquisition Issues: Power Ltd. Support is required from Expansion Total land requirement is 1396 the State Govt. in Project at Ha. Out of which 151.068 ha acquiring the remaining Raigarh Plant land is in possession 1244.932 Ha. Environmental and Forest Environmental Clearance Clearance and Forest Clearance should be cleared within the time limit prescribed in EIA Note dt 14/9/96 and guidelines under FC Act,1980 respectively. Delay in conducting Public Public hearing to be held Hearing : on time Draft EIA Reports submitted to CECB to conduct public hearing in March 2012 and April, 2012 for 1 MTPA and 7 MTPA expansion projects respectively. The dates for holding public hearing are yet to be fixed. Iron Ore Linkage: Additional Iron Ore Mines needed to meet Prospecting License for one iron the requirement of the ore mine at Dantewada against project. the requirement of 410 MT for 30 years. Coal Linkage/Allotment of No coal mine has been suitable captive coal mines in allocated for the Chhatisgarh expansion project at Raigarh Plant. 5. VISA STEEL VISA Steel has acquired 265.12 Chhattisgarh State is to LIMITED acres of land against requirement be advised to speed up Chhattisgarh of 1000acre. Balance is yet to be handing over of the Project allotted by the State balance area. Government. ISSUES PERTAINING TO GOVERNMENT OF ODISHA S.No Name of the Issues in Brief Action to be Taken company and location 1 SAIL Bolani Ore Mines was granted Forest clearance proposal Stage-I forest clearance on 12.11.10 for the 317 ha in the Proposed for compliance of conditions. After proposed Karo- Elephant lapse of 11 months forest deptt, Karampada corridor in Corridor Odisha has proposed an elephant 5.1 Sq Mile Lease to be passing through corridor cutting across the 5.1 sq recommended by State 5.1 Sq mile mile lease. There has not been any Govt. for approval of lease of Bolani interface with elephants during the MoEF, GoI. Ore, operation of mine since 1960. Odisha Mining operations at Bolani resumed on 27th December, 2012 in part of the broken area excluding 317 ha in view of restriction imposed by MoEF while granting Stage-II forest clearance due to proposed Karo-Karampada Elephant Corridor passing through the lease. Vide order dated 19th December, 2012 MoEF has already issued revised Guidance document for taking up non forestry activities in wildlife habitats wherein, elephant reserves and Elephant Corridor have been exempted from obtaining National Board for Wildlife (NBWL) clearance. The issue has been taken up with Govt. of Odisha to allow SAIL for continuation of mining in already broken area of the 5.1 Sq. Mile lease as no biodiversity can be affected in already broken area. SAIL, Barsua ML-130 leases of Barsua-Kalta mine Govt. of Odisha to Iron Ore Mines, was granted Stage-I forest clearance recommend compliance Jharkhand on 8.3.11 for compliance of report on Stage-I forest conditions. Barsua mine has clearance condition for complied all the conditions and the approval of MoEF, GoI compliance report has been for grant of Stage-II submitted to Sate Govt. in forest clearance. January’13.Working permission for compliance of conditions is valid up to 7.3.13. Non grant of final forest clearance within the time limt will cause closure of operations at Barsua mine and supply of iron ore to Rourkela Steel Plant will be affected. 2 Arcelor Mittal a) Renewal of MoU – the Arcelor State Govt. of Odisha to Keonjhar, Mittal signed an MoU with expedite necessary Odhisa Government of Odisha 21/12/2006 action. for a period fo 5 years. Arcelor Mittal applied on 08/12/2011 for the renewal of the MoU and it is under consideration of the State Government. Recommendation of PL/ML Application 7 Nos. of PL application and one No. of ML application of Arcelor Mittal for allocation on Iron ore blocks are with the office of Director, Mines, Govt. of Odisha, Bhubneswar 3. Posco India ISP Land acquisition In order to start the Project at - Requirement: 4004 ac construction of 8MTPA Paradip, - Availability: The possession of ISP (Phase 1 & 2, 4 Jagatsinghpur, 1,703 ac land was handed over to MTPA for each phase), Odisha POSCO-India on Jan, 2013 2700 ac Govt Forest Land should be handed over. Steel Plant Environment Clearance Revalidation This EC should be ‐ Current status: Expert Appraisal revalidated immediately Committee (EAC) recommended to avoid unnecessary revalidation of 4‐mtpa steel plant noises raised by NGO Environment Clearance during its and anti-project entities meeting held on 14th June 2012. etc during the Revalidation recommendation is, implementation of land however, been awaiting MoEF acquisition by GoO. approval till date. 4 VISA STEEL Allotment of captive Iron Ore is Odisha State should be LIMITED pending since 2005. The Iron Ore directed by centre to District Jajpur, lease needs to be allotted on grant Iron Ore leases. Kalinganagar urgent/SOS basis as it is critical for (Odisha) survival. Supply of adequate quantity of Iron Steel Ministry should Ore and Chrome Ore at reasonable take up this with Odisha price under long term agreement State. from OMC. Availability and prices are a major bottleneck. Long Term Linkage of Iron Ore Steel Ministry should from OMDC at reasonable price to direct OMDC meet company’s requirement is to be accordingly. ensured till the captive mines become operational. Formulation of policy on RML for Steel Ministry should Iron Ore leases should favour take up this with the existing steel units having MOU Odisha State and with Govt.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us