The Wisconsin Avenue Bridge in Downtown Milwaukee Will Be Closed for Rehabilitation from October 2011 to August 2012. the Work W

The Wisconsin Avenue Bridge in Downtown Milwaukee Will Be Closed for Rehabilitation from October 2011 to August 2012. the Work W

Please patronize all the businesses on Wisconsin Avenue during the bridge closure, especially those most directly affected: East of the River John Hawks Pub Wells Fargo Bank Chase Bank West of the River Shops of Grand Avenue Mo’s Restaurants Subway Riverside Theater Uhle’s Tobacco Stir For more about shops and activities downtown: www.milwaukeedowntown.com www.easttown.org www.historicthirdward.org www.westown.org For bus route changes and more: RideMCTS.com RideWCCE.com www.coachusa.com/wisconsincoach For downtown parking information: The Wisconsin Avenue bridge in downtown ParkMilwaukee.com Milwaukee will be closed for rehabilitation from October 2011 to August 2012. The work For more information about the bridge will include rehab of the structural, electrical, rehabilitation and copies of the pedestrian guide: hydraulic and mechanical elements of the http://city.milwaukee.gov/mpw bridge, as well as new decking, railings, sidewalks and bridge approaches. The project is largely funded by federal stimulus dollars. This guide is designed to help pedestrians get to their destination during the closure. Please explore the many alternatives for crossing the Milwaukee River while the Wisconsin Avenue bridge is closed October 2011 to August 2012. Go Up: Use the skywalks, especially during inclement weather. Go Down: Go down by the river and use the Riverwalk. Go Around: Use Wells Street to the north or Michigan Street to the south. Wells Street Wells Street The Safe House N Rock Bottom City Center at 735 Brewery John Hawks Pub H. Reuss Mo‘s Best Hampton Avenue Plankinton 100 East Federal Western Inn Riverside Office Plaza 7 8 Old World Third Old Street World Mo‘s Theatre Building 10 11 9 Wisconsin Avenue 6 STREET / BRIDGE CLOSED 1 2 5 Water Street Water Second Street Second THE SHOPS 3 Boston THE SHOPS OF OF GRAND Marriott 4 Chase Store GRAND AVENUE AVENUE Residence Tower Inn Courtyard by Marriott ASQ Center Michigan Street Michigan Street Sidewalks will remain open from Plankinton Avenue Skywalk entrances, connections and hours and Water Street to the actual construction zone. (Times are 7 days/week unless noted. Times subject to change.) Sidewalk connections to the Riverwalk will be 1 Shops of Grand Avenue at Old World Third Street: 5:30 a.m.-10 p.m. maintained at the northwest, southwest and southeast corners of the bridge – except for temporary closure 2 Shops of Grand AvenueSkywalk at 161 W. Plankinton Avenue: 5:30 a.m.-8 p.m. to accommodate specific construction activity. The 3 Shops of Grand Avenue skywalk across Plankinton Avenue: 5:30 a.m.-11 p.m. Skywalk evening hours Riverwalk at the northeast quadrant of the bridge 4 ASQ skywalk across Milwaukee River to Chase Tower: M-F 6 a.m.-7 p.m. will be closed for bridge construction during 2011. Shopping/ Residential Hotels/ Skywalk 5 Chase Tower, 111 E. RiverwalkWisconsin: M-F 6 a.m.-7 p.m. Signs will be posted Retailalong the Riverwalk indicatingAccomodations 6 Skywalk across Wisconsin Avenue: 6 a.m.-midnight that the crossing at Wisconsin Avenue will be closed Riverwalk Street level walk-around throughout construction. 7 Empire Building, 710 N. Plankinton: M-F 6:45 a.m.-7:00 p.m. and Sat. 8 a.m.-4:30 p.m. In addition, signs will be posted directing pedestrians 8 Skywalk across Milwaukee River to 100 East: 6 a.m.-midnight to skywalks on the north and south side of Wisconsin Avenue which can be used to cross the river while the 9 100 East Wisconsin Avenue entrance: 8 a.m.-6 p.m. bridge is closed. The signs will describe the hours the 10 100 East building entrance on Water Street: skywalks are open and point pedestrians to the entrances. Open to office tower 8 a.m.-6 p.m. Open to John Hawks Pub during Pub hours. Pedestrian access to all businesses will be maintained 11 Parking structure at 720 N. Water open to skywalk 6 a.m.-midnight throughout construction..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us