Basic Design of Replogle Flumes Eplogle Flumes Are Widely Examples of Replogle Flumes Are Shown Recommended Flow Measurement in Figure 1

Basic Design of Replogle Flumes Eplogle Flumes Are Widely Examples of Replogle Flumes Are Shown Recommended Flow Measurement in Figure 1

ITRC Report 02-010 IRRIGATION TRAINING AND RESEARCH CENTER California Polytechnic State University San Luis Obispo, California 93407 www.itrc.org Basic Design of Replogle Flumes eplogle flumes are widely Examples of Replogle flumes are shown recommended flow measurement in Figure 1. R structures for most open channel applications in irrigation canals. The Cal Poly Irrigation Training and Research Center (ITRC) has used the basic design promoted by Dr. John Replogle for over 20 years. Replogle Figure 1. Replogle flumes in irrigation canals flumes are particularly well suited for use in irrigation canals and have major To facilitate accurate flow measurement, advantages over all other known weirs this paper describes specific design and and flumes (e.g., Parshall flumes, construction considerations applicable to sharp-crested weirs, cutthroat flumes). Replogle flumes in irrigation applications. A design example is provided to illustrate Replogle flumes, technically known as these concepts. broad-crested weirs, belong to the family of long-throated flumes. One of WinFlume Software the most important benefits is the One of the primary advantages of the ability to place a Replogle flume into Replogle flume is the capability to custom an existing control section, thereby design and calibrate structures for unique greatly reducing the cost of a new operational and site requirements using the measurement device. Windows-based computer program In general, the term broad-crested weir WinFlume. The current version of the refers to a structure in which a program can be downloaded free-of-charge contraction of the flow is created by from the Bureau of Reclamation’s web site raising the channel floor. This at http://www.usbr.gov/pmts/hydraulics_lab/winflume/. contraction produces flow at critical depth resulting in a predictable and The reader is encouraged to refer to the unique head-discharge relationship recent publication Water Measurement over the entire range of flow rates. with Flumes and Weir (ILRI pub. 58, When the contraction is produced by a 2001) by Clemmens, Wahl, Bos, and combination of raising the channel Replogle for comprehensive information bottom and narrowing the width of the on design, calibration, construction, and channel, the term flume is used. operation issues. Design Considerations The upstream and downstream channels The following is a short summary of important should be investigated for possible flow design and related construction issues relevant to restrictions including culverts, check accurate flow measurement using Replogle structures, turnouts, etc. that might affect flumes in irrigation canals. These recommendations flows. The size and locations of these are applicable to most installations and are structures should be obtained. intended to simplify the design process using WinFlume. It is critical that the backwater effects, if any, of downstream control structures are • Definition of the existing channel conditions. evaluated at the proposed flume location. To The first design step is to select the proper determine the potential impacts from site and determine the field conditions under submergence, the water level at the nearest which the flume must operate. The following downstream control structure should be characteristics of the installation should be raised to its highest point, while at low flow established through site surveying and a conditions, and then survey data of the water thorough review of the conditions at high and level obtained at the flume site. low flows: • Recommended site conditions. For accurate - Range of flows to be measured flow measurement, it is important to take into - Freeboard requirement at maximum account the following: flow - Access to the site for construction and - The Froude number should not exceed subsequent measurement 0.5 in the approach channel and for a - Influence of any downstream control distance upstream of 30 times the structures, if any maximum head reading, H1max. - Uniform flow, Froude number Fr = v/(32.2*A/w)^0.5 - Lining material and material used for where, v = velocity, flume construction (roughness A = area, coefficient) w = top width - Cross-sectional dimensions and side - Note H1max is the sill-referenced energy slope head at maximum flow. Preferably the Froude number should be closer to 0.2. For design purposes, it is usually necessary to - The channel upstream of the flume measure the cross section of the canal at should be straight and uniform for a about four locations, including the site where distance of at least 30 times H1max. the flume will be, one upstream of the site - There should be no flow of highly about 50 ft, and two downstream at about turbulent water (e.g., undershot gates, 50 ft intervals. The survey data required at drop structures, hydraulic jumps, etc.) each location includes top of left bank, top of in the upstream channel for a distance left concrete, invert at left toe, invert at from the approach channel of 30 H1max. centerline, invert at right toe, top of right - If there is a bend close to the structure concrete, and top of right bank. (closer than 30 H1max), the water surface elevations at the two sides are likely to In addition, the water level elevation in the be different. Reasonably accurate canal should be surveyed at 100 ft intervals, measurements can be made with about for approximately 200 ft upstream and 300 ft 3% added error if the upstream straight downstream of the proposed site. This needs channel is at least 6 H1max. It is best to to be done at the maximum and minimum measure the water level on the inner flows, with estimates made of the bend of the channel. approximate flow rates. • Method of contraction. The designer’s • Suggested flume dimensions. Following the objective is to have the least expensive design generally recommended guidelines, the (usually the simplest shape to construct) that length of the approach channel, converging meets the operating criteria. For existing transition, throat, and diverging transition lined trapezoidal irrigation canals, the best depend on the value of the sill-referenced choice in terms of cost and performance is energy head (H1) at maximum flow. The often to construct a broad-crested weir using gage station should be located at a distance a bottom-only contraction (Figure 2). between two and three times H1max from the leading edge of the sill. The length of the converging transition is similarly related to the sill height above the approach channel invert (p1) such that it is between 2.4 p1 to 4.5 p1. In most cases the slope of the ramp in the converging section should be set at 3:1 (horizontal:vertical). For accuracy, the throat length (L) should be selected so that the ratio of H1max to the throat length is in the range of 0.070 to 0.70. Figure 2. Trapezoidal Replogle flume in existing concrete lined canal • Head loss design criteria. The main tradeoff in designing Replogle flumes is between Another option is to provide additional side having enough contraction to avoid contraction by having vertical walls through the submergence, but not so much contraction to section as shown in Figure 3 (rectangular cross- infringe on the freeboard and possibly section). overtop the canal banks. Assuming other design criteria do not control the flume design (e.g., the Froude number at maximum flow), the amount of contraction in Replogle flume designs is determined by the sill height. During design investigation, one should begin with an initial sill height of half the normal flow water depth. Using the WinFlume program, the sill height can be incrementally increased while checking for adequate submergence protection in the tailwater channel. Figure 3. Rectangular Replogle flume with tapered entrance and smooth rounded edges • All flume designs should have a downstream (Truckee-Carson Irrigation District) ramp. The ramps can either be 6:1 full ramps The shape and cross-sectional dimensions of the or 6:1 truncated ramps. approach, control, and tailwater sections are defined in the WinFlume program using the • The bottom of the flume should be painted Flume Geometry and Dimensions Form. with ablative (anti-fouling) paint to inhibit Elevation and length dimensions of the structure vegetative growth. are edited on the bottom profile drawing within this screen. Information about the channel geometry and sizes can also be entered using the Section Shape and Dimensions Form. • Head measurement method. For applications Replogle Flume Design Example where the flume will be used for control To illustrate the proper design techniques purposes, water level (head) must be summarized in this paper, the design for a measured very accurately using electronic Replogle flume in a medium-sized, earthen sensors (including redundant units). The lateral (Figure 4) is described. The minimum expected accuracy of current electronic water and maximum flow rates at this location are level sensors is about ± 1/16 inch. While the 5 and 90 cubic feet per second, respectively. WinFlume program estimates the combined error due to the accuracy of the rating table and the potential errors related to head measurement (depending on the chosen method), users are cautioned not to make unrealistic assumptions in the determination of expected errors in the design review which may result in impractical design criteria. • Flush pipe. A flush pipe(s) is required under the length of the structure to prevent pooling when the canal is drained. All flume designs (above 5 cubic feet per second) should have a 4-inch PVC or steel pipe installed to drain the Figure 4. Location for new Replogle flume in an upstream section of the canal. Larger flume earthen lateral designs require relatively larger drain pipe diameters (e.g., 12-inch). The pipe should be The constructed flume is shown in Figure 5. installed flush to the concrete. • Staff gage. A metal or plastic staff gage should be securely installed to the upstream wall.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us