Integrated Technical Approach and Results of the Tiong-Kepong Joint Resources Study

Integrated Technical Approach and Results of the Tiong-Kepong Joint Resources Study

411 Paper 26 Integrated technical approach and results of the Tiong-Kepong joint resources study .A.rAIB SINGH!, SHAHARUDIN AzIZ2, EDWIN J. BOMER! 1Esso Production Malaysia Inc. 2PETRONAS Carigali Sdn. Bhd. Wisma Peladang. Jalan Bukit Bintang P.O. Box 12407 50776 Kuala Lumpur The Joint Resource Study (JRS), a combined effort by Petronas, Petronas Carigali, and Esso Production Malaysia Inc., was initiated in 1993 to create a multidisciplinary team approach to determining remaining potential and optimal reservoir depletion plans for twelve oil fields in the Malay Basin. Integrated technical teams comprising of professionals from the three companies systematically upgraded the technical understanding of each major reservoir in the twelve fields with application of the latest geoscience technology. Tiong and Kepong field, located in the south-eastern part of the Malay Basin approximately 260 km east of Kerteh, were studied by a JRS multidisciplinary team to assess the potential of undrained hydrocarbons, and reservoir engineering data to delineate prospective reserves in a stratigraphic trap in the marginal marine J-18/19 reservoirs. A seismic amplitude anomaly in the saddle between Tiong and Kepong field highlighted the need for an integrated study. Detailed interpretation of recently acquired and existing 2D seismic data established an area of strong amplitude response and allowed reservoir thickness prediction based on isocronal mapping. Seismic modelling supported a correlation of strong seismic amplitude with thick, high-quality hydrocarbon filled sand. A strong Amplitude vs. Offset (AVO) seismic response was also seen in the target interval. Core data was integrated with well log expression to help build a detailed geologic facies model in the context of the regional sequence stratigraphic framework. A through understanding of the distribution and sealing nature of interbedded shales within the J-series was also required to ensure the production from existing wells in Tiong field which is from the underlying J-20/21 reservoir unit, which was initiated in 1983, had not drained the prospective area. An upcoming well will test the integrated model that the JRS team has created and confirm the viability of a proposed development program. Warta Geologi, Vol. 21, No.6, Nov-Dec 1995 Warta Geologi (Newsletter of the Geological Society of Malaysia), Vol. 21, No. 6, November-December 1995 Copyright © 2017 by Geological Society of Malaysia (GSM).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us