Lichtenburg 1

Lichtenburg 1

LICHTENBURG 1 North West Province Social Impact Assessment (SIA) Report November 2018 Social Impact Assessment (SIA) Report November 2018 Lichtenburg 1 North West Province Prepared for: ABO Wind Lichtenburg 1 PV (Pty) Ltd Lichtenburg 1 North West Province November 2018 REPORT DETAILS Title : Social Impact Assessment (SIA) Report for Lichtenburg 1, a PV energy facility and associated infrastructure near Lichtenburg, in the North West Province Authors : Savannah Environmental (Pty) Ltd Sarah Watson External Peer Review : Dr. Neville Bews & Associates Dr. Neville Bews Client : ABO Wind Lichtenburg 1 PV (Pty) Ltd Report Revision : Revision 0 Date : November 2018 When used as a reference this report should be cited as: Savannah Environmental (2018). Social Impact Assessment (SIA) Report for Lichtenburg 1, a PV energy facility and associated infrastructure near Lichtenburg, in the North West Province. COPYRIGHT RESERVED This technical report has been produced for ABO Wind Lichtenburg 1 PV (Pty) Ltd. The intellectual property contained in this report remains vested in Savannah Environmental (Pty) Ltd. No part of the report may be reproduced in any manner without written permission from Savannah Environmental (Pty) Ltd or ABO Wind Lichtenburg 1 PV (Pty) Ltd. Report Details Page i Lichtenburg 1 North West Province November 2018 SPECIALIST DECLARATION OF INTEREST I, Sarah Watson , declare that – » I act as the independent specialist in this application. » I will perform the work relating to the application in an objective manner, even if this results in views and findings that are not favourable to the applicant. » I declare that there are no circumstances that may compromise my objectivity in performing such work. » I have expertise in conducting the specialist report relevant to this application, including knowledge of the Act, Regulations and any guidelines that have relevance to the proposed activity. » I will comply with the Act, Regulations and all other applicable legislation. » I have no, and will not engage in, conflicting interests in the undertaking of the activity. » I undertake to disclose to the applicant and the competent authority all material information in my possession that reasonably has or may have the potential of influencing – any decision to be taken with respect to the application by the competent authority, and – the objectivity of any report, plan or document to be prepared by myself for submission to the competent authority. » All the particulars furnished by me in this form are true and correct. » I realise that a false declaration is an offence in terms of Regulation 48 and is punishable in terms of section 24F of the Act. Sarah Watson Name Signature November 2018 Date Specialist Declaration of Interest Page ii Lichtenburg 1 North West Province November 2018 TABLE OF CONTENTS PAGE REPORT DETAILS...............................................................................................................................................................i SPECIALIST DECLARATION OF INTEREST .......................................................................................................................ii TABLE OF CONTENTS ..................................................................................................................................................... iii ACRONYMS ....................................................................................................................................................................v 1. INTRODUCTION .......................................................................................................................................................1 1.1. Project Description .............................................................................................................................................1 1.2. Details of the Independent Specialist..............................................................................................................3 1.3. Structure of this SIA Report ................................................................................................................................3 2. METHODOLOGY AND APPROACH........................................................................................................................5 2.1. Purpose of the Study ..........................................................................................................................................5 2.2. Approach to the Study ......................................................................................................................................5 2.2.1. Stakeholder Identification and Analysis ......................................................................................................6 2.2.2. Collection and Review of Existing Information............................................................................................9 2.2.3. Collection of Primary Data..............................................................................................................................9 2.3. Impact Assessment Evaluation Method ........................................................................................................10 2.4. Limitations and Assumptions...........................................................................................................................12 3. LEGISLATION AND POLICY REVIEW .....................................................................................................................13 3.1. National Policy and Planning Context...........................................................................................................13 3.1.1. Constitution of the Republic of South Africa (1996) .................................................................................14 3.1.2. National Environmental Management Act (No. 107 of 1998) (NEMA).................................................14 3.1.3. White Paper on the Energy Policy of the Republic of South Africa (1998) ..........................................15 3.1.4. White Paper on the Renewable Energy Policy of the Republic of South Africa (2003)....................15 3.1.5. National Energy Act (No. 34 of 2008)..........................................................................................................16 3.1.6. Integrated Energy Plan (IEP) (2016).............................................................................................................16 3.1.7. Integrated Resource Plan for Electricity (IRP) 2010 – 2030 (2011)..........................................................17 3.1.8. National Development Plan 2030 (2012)....................................................................................................18 3.1.9. Strategic Infrastructure Projects (SIPs) .........................................................................................................19 3.2. Provincial Policies.............................................................................................................................................19 3.2.1. North West Provincial Development Plan (PDP) 2030 (2013)..................................................................20 3.2.2. North West Provincial Growth and Development Strategy (PGDS) (2004 – 2014) .............................20 3.2.3. Renewable Energy Strategy for the North West Province (2012) ..........................................................21 3.2.4. North West Provincial Spatial Development Framework (2017) ............................................................23 3.3. District and Local Municipalities Policies.......................................................................................................24 3.3.1. Ngaka Modiri Molema DM IDP 2017 – 2022 (2017)...................................................................................24 3.3.2. Ditsobotla LM IDP 2017 – 2018 (2017) ..........................................................................................................25 3.4. Conclusion ........................................................................................................................................................26 4. SOCIO-ECONOMIC PROFILE ...............................................................................................................................27 4.1. North West Province .........................................................................................................................................27 4.2. Ngaka Modiri Molema DM..............................................................................................................................28 4.3. Ditsobotla LM ....................................................................................................................................................29 4.4. Project Site ........................................................................................................................................................30 4.5. Adjacent Properties .........................................................................................................................................30 4.6. Baseline Description of the Social Environment ...........................................................................................34 4.6.1. Population Size.................................................................................................................................................34 Table of Contents Page iii Lichtenburg 1

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    103 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us