Humnabad.Pdf

Humnabad.Pdf

Estimated Expenditure For District Taluk Gram Panchayat Year Work Name Type Of Building Expenditure Work status Amount SC/ST Bidar Humnabad Belkera 2006-07 Construction of C.C. Road & Drain Near Sharanappa house CC Road and Drainage 30000 30000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road & Drain from Chirsab Mulla house to Hirlal house CC Road and Drainage 40000 40000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Mahadev Temple to Tukaram house CC Road 40000 40000 0 Completed Bidar Humnabad Belkera 2006-07 Construction fo C.C. Road from Nagayya Swamy house to Manik house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Laxmi Temple to Gajendra house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Mastan house Devappa house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Revanasidd Irabai house to Gundappa house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Manikavi Kori house to Main Road CC Road 60000 60000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Midal Primary School to Ismail house CC Road 120000 120000 0 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Ramesh Kinidar house to Bannalli Road CC Road 50000 49000 49000 Completed Bidar Humnabad Belkera 2006-07 Construction of C.C. Road from Laxmi Temple to Margamma Temple CC Road 55000 55000 55000 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road & Drain from Karbasappa house to Madeppa house CC Road and Drainage 40000 40000 0 Completed Bidar Humnabad Belkera 2007-08 Construction of Water Tank & Dhobi Gahat Water Tank 70000 70000 0 Completed Bidar Humnabad Belkera 2007-08 Counitinue Gram Panchayat Building Construction of Gram Panchayat100000 Building 100000 0 Completed Bidar Humnabad Belkera 2007-08 Counitinue Laibrery Building Construction Of Library 100000 100000 0 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road from Hunuman Temple to Majid CC Road 170000 170000 0 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road from Manik Mahi house to Jagadevi Hipparagi house CC Road 40000 40000 40000 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road from Tukaram Markal house to Ambedkar Chowk CC Road 70000 70000 70000 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road Near Helluva Colony CC Road 70000 70000 70000 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road from SC Colony Main Road to Gundappa Bandenoor house CC Road 104000 104000 104000 Completed Bidar Humnabad Belkera 2007-08 Construction of C.C. Road & Desk Slab from Tukram house to Shankar house CC Road and Desk Slab 119000 119000 119000 Completed Bidar Humnabad Belkera 2008-09 Construction of Mini Water Tank (2) from Margemma Tample & C.C. Road Water Tank 30000 30000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of Mini Water Tank Near Karepppa House Water Tank 30000 30000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Laxmi Tample to Gajendra house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Ramchandra Hotal to Hanamanth house CC Road 50000 50000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of Mini Water Tank Near Water Tank Water Tank 50000 50000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Mani Kavi Kor house to Main Road CC Road 60000 60000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Ladies Hotel to Hanumath house CC Road 70000 70000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Tukaram Markal house to Ambedkar house CC Road 70000 70000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Jaivanth house to Dastagir house CC Road 75000 74000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Majjid to Bhadur house CC Road 75000 75000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of Compound Vall Higher Pramery School Building Compound wall 90000 90000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Hunuman Tample to Bhimshayya house CC Road 107000 107000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Ashok house to Madeppa Mulgi house CC Road 120000 120000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Narayan reddi house to Way of Majjid CC Road 150000 150000 0 Completed Bidar Humnabad Belkera 2008-09 Construction of Mini Water Tank (2) from Heluva Street Water Tank 70000 70000 70000 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from SC Cominnity Hall to Kanji house CC Road 90000 90000 90000 Completed Bidar Humnabad Belkera 2008-09 Construction of C.C. Road from Tukaram house to Hasansab Shope CC Road 100000 100000 100000 Completed Bidar Humnabad Belkera 2009-10 Construction of R.C.C. Desk Slab Near Masijid Desk slab 30000 30000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of R.C.C. Desk Slab in Ward No -1 Near Majid Desk slab 35000 35000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of Cattle Trough and Washing Plat from Near Tukaram Rajgiri house Dhobi Ghat 35000 35000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of Desk Slab Near Amrut house in SC Galli Desk slab 50000 50000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of C.C. Desk Slab from Mallikarjun Shop to Mehatabsab house Desk slab 75000 75000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of C.C. Road from Jagappa Panchagar house to Eranna Kurnal house CC Road 100000 100000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of Toilet Block Near Sedikuni Construction of Toilet 100000 100000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of C.C. Road from Mallappa Kallappa house to Netaji Dandin house CC Road 120000 120000 0 Completed Bidar Humnabad Belkera 2009-10 Construction of C.C. Road from Pandappa Wadpalli house to Revanappa Pangargi house CC Road 125000 125000 0 Completed Bidar Humnabad Belkera 2009-10 Constrcution of R.C.C. Cistern and Pipe Line Near Margemma Temple Pipeline 50000 0 35000 Completed Bidar Humnabad Belkera 2009-10 Construction of Desk Slab from Aproch Road to Vithal Rukmani Temple in SC Galli CC Road and Desk Slab 40000 0 40000 Completed Bidar Humnabad Belkera 2009-10 Construction of Desk Slab Near Shivanna house in SC Galli Desk slab 40000 0 40000 Completed Bidar Humnabad Belkera 2009-10 Construction of Desk Slab Near Vaijinath Avarde house Desk slab 40000 0 40000 Completed Bidar Humnabad Belkera 2009-10 Construction of R.C.C. Desk Slab Near Vithal Sadu house Desk slab 40000 0 40000 Completed Bidar Humnabad Belkera 2009-10 Construction of R.C.C. Desk Slab Near Sharanappa Poolie house Desk slab 50000 0 50000 Completed Bidar Humnabad Belkera 2009-10 Construction of C.C. Road from Daulappa Christian house to Main Road CC Road 80000 0 80000 Completed Construction of Pipe Line & singal Phase Motar at Borwell Near Basaveshwar Temple at Bidar Humnabad Belkera 2010-11 Pipeline 60000 0 0 Progress Shamtabad Village Construction of Pipe Line & singal Phase Motar at Borwell Near Gyandev house & Rajkumar Bidar Humnabad Belkera 2010-11 Pipeline 60000 0 0 Progress Matar house at Bannalli Village Bidar Humnabad Belkera 2010-11 Construction of Singal Pahse Motar at Borwell Near Ambedkar Chowk ar Bannalli Village Drinking Water Supply 60000 0 0 Progress Bidar Humnabad Belkera 2010-11 Construction of Toilet at Gram Panchayat Budling at Belkera Village Construction of Toilet 30000 30000 0 Completed Construction of C.C. Drain from Omkar Hanmantrao Salgar house to Hanamnthrao Patil house at Bidar Humnabad Belkera 2010-11 Drainage 35000 35000 0 Completed Bannalli Villege Bidar Humnabad Belkera 2010-11 Construction of Pipe Line & singal Phase Motar at Borwell Near Main Road at Shamtabad Village Pipeline 40000 40000 0 Completed Bidar Humnabad Belkera 2010-11 Construction of C.C. Desk Slab & Drain Near Marugemma Temple at Madgol Village Drainage 40000 40000 0 Completed Constrcution of Pipe Linge from Narsareddi Kirana Shope to Bimrao Patil house at Madgol Bidar Humnabad Belkera 2010-11 Pipeline 45000 45000 0 Completed Village Bidar Humnabad Belkera 2010-11 Construction of Kaccha Nala Near Samil House at New Belkera Village Drinking Water Supply 50000 50000 0 Completed Bidar Humnabad Belkera 2010-11 Construction of New Pipe Line from Mian Gate to SC Colony Omkar house at Belkera Village Pipeline 50000 50000 0 Completed Bidar Humnabad Belkera 2010-11 Construction of C.C. Road Near Bimrao Patil house at Madgol Village CC Road 55000 55000 0 Completed Bidar Humnabad Belkera 2010-11 Construction of C.C. Drain from Ashok Guttur house to Dulappa hudgi house at Belkera Village Drainage 70000 70000 0 Completed Bidar Humnabad Belkera 2010-11 Constrcution of Kachanall from Shankar Ekkelli house to Dhasart house at Shamtabad Village Drinking Water Supply 35000 0 35000 Completed Construction of Kaccha Nala & Raipar of Road from Water Tank to Ganpati house at Belkera Bidar Humnabad Belkera 2010-11 Drinking Water Supply 50000 0 50000 Completed Village Bidar Humnabad Bemalkheda 2006-07 Construction of BSNL Office Building other works 100000 92000 0 Completed Bidar Humnabad Bemalkheda 2006-07 Construction of C.C. Road from Majjid to Big Open well CC Road 100000 99000 0 Completed Bidar Humnabad Bemalkheda 2006-07 Construction of C.C.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    15 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us