2021 Invasive Spartina Project Treatment Schedule

2021 Invasive Spartina Project Treatment Schedule

2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 01a Channel Mouth X Lower Channel (not including 01b X mouth) 01c Upper Channel X Alameda Flood 4 years with no 1 Upper Channel - Union City Blvd to Control Channel 01d invasive Spartina I-880 (2017-2020) 01e Strip Marsh No. of Channel Mouth X No Invasive 01f Pond 3-AFCC Spartina 2020 02a.1a Belmont Slough Mouth X X X 02a.1b Belmont Slough Mouth South X X X Upper Belmont Slough and 02a.2 X X X Redwood Shores 02a.3 Bird Island X 02a.4 Redwood Shores Mitigation Bank X 02b.1 Corkscrew Slough X X Steinberger Slough South, 02b.2 X X Redwood Creek Northwest 02c.1a B2 North Quadrant West X X 02c.1b B2 North Quadrant East X X 02c.2 B2 North Quadrant South X X 02d.1a B2 South Quadrant West X 02d.1b B2 South Quadrant East X 02d.2 B2 South Quadrant (2) X 2 Bair/Greco Islands 02d.3 B2 South Quadrant (3) X 02e Westpoint Slough NW X X 02f Greco Island North X X 02g Westpoint Slough SW and East X X 02h Greco Island South X X 02i Ravenswood Slough & Mouth X Ravenswood Open Space Preserve 02j.1 X (north Hwy 84) * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 1 of 10 2 Bair/Greco Islands 2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering Ravenswood Open Space Preserve 02j.2 X (south Hwy 84) Redwood Creek and Deepwater 02k X X X Slough 02l Inner Bair Island Restoration X Alameda Flood 1 Pond B3 - Middle Bair Island Control Channel 02m X Restoration 3 years with no 02n SF2 Invasive Spartina (2018-2020) 02o Central Bair 8/2-8/3 X 2 years with no 03a Blackie's Creek (above bridge) Invasive Spartina (2019-2020) 3 Blackie's Pasture 4 years with no 03b Blackie's Creek Mouth Invasive Spartina (2017-2020) Corte Madera Ecological Reserve 04a X X (CMER) College of Marin Ecology Study No invasive 04b Area Spartina 2020 04c Piper Park East X 2 years with no 04d Piper Park West Invasive Spartina (2019-2020) 04e Larkspur Ferry Landing Area X 04f Riviera Circle 6/4 (COI) X X Corte Madera 4 Creek Complex 04g Creekside Park 6/8 (COI) X X Upper Corte Madera Creek (Above 04h X X Bon Air Road) Lower Corte Madera Creek 04i 6/9 (COI) X X (between Bon Air Rd & HWY 101) Corte Madera Creek Mouth - North 04j.1 X X Bank Corte Madera Creek Mouth - South 04j.2 X X Bank 04k Boardwalk No. 1 (Arkites) 6/10 (COI) X 04l Murphy Creek X 05a.1 Mowry Marsh & Slough X X 05a.2 Calaveras Marsh 7/30 X X X * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 2 of 10 Coyote 5 Creek/Mowry Complex 2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 05b Dumbarton/Audubon X X 05c.1 Newark Slough West X X 05c.2 Newark Slough East X X Alameda Flood 1 ControlCoyote Channel 5 Creek/Mowry 05d LaRiviere Marsh X Complex 05e Mayhew's Landing X 05f Coyote Creek- Alameda County X X 05g Cargill Pond (W Hotel) X 05h Plummer Creek Mitigation X 05i Island Ponds X 06a Emeryville Crescent East X Emeryville 6 Crescent 06b Emeryville Crescent West 7/29 X 07a Oro Loma Marsh-East 10/28-10/29 X X 7 Oro Loma Marsh 07b Oro Loma Marsh-West 10/28-10/29 X X 8 Palo Alto Baylands 8 Palo Alto Baylands X X X 9 Tiscornia Marsh 9 Tiscornia Marsh X 10a Whittell Marsh X 10b Southern Marsh X X Point Pinole 10 Marshes 10c Giant Marsh X X 10d Breuner Marsh X Southampton 11 11 Southampton Marsh X Marsh 5 years with no 12a Pier 94 invasive Spartina (2016-2020) 3 years with no 12b Pier 98/Heron's Head Invasive Spartina (2018-2020) 7 years with no 12c India Basin invasive Spartina (2014-2020) 4 years with no 12d Hunters Point Naval Reserve Invasive Spartina (2017-2020) Southeast San 12 Franciso * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 3 of 10 2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering Southeast San 12 12e Yosemite Channel X Franciso 6 years with no 12f Candlestick Cove invasive Spartina (2015-2020) 7 years with no Alameda Flood 1 12g Crissy Field invasive Spartina Control Channel (2014-2020) 7 years with no 12h Yerba Buena Island invasive Spartina (2014-2020) 7 years with no 12i Mission Creek invasive Spartina (2014-2020) 13a Old Alameda Creek North Bank X 13b Old Alameda Creek Island X 13c Old Alameda Creek South Bank X 13d Whale's Tail North Fluke X 13e Whale's Tail South Fluke X 13f Cargill Mitigation Marsh X Whale's Tail 13g Upstream of 20 Tide Gates 13 X Complex 13h Eden Landing-North Creek X No invasive 13i Eden Landing-Pond 10 Spartina 2020 13j Eden Landing-Mt Eden Creek X Eden Landing Reserve South- 13k X North Creek Marsh Eden Landing Reserve North- Mt 13l X Eden Creek Marsh Eden Landing - Pond E8A, E9, and 13m 8/2 X X E8X Charleston Slough to Mountain 15a.1 X View Slough 15a.2 Stevens Ck to Guadalupe Sl X 15a.3 Guadalupe Slough 15a.4 Alviso Slough X X South Bay 15 Marshes 15a.5 Coyote Creek to Artesian Slough X X 15a.6 Knapp Tract (Pond A6) X 15b Faber/Laumeister Marsh X * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 4 of 10 2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review SouthWhere: Bay Site Locations (map) How: Treatment Methods Herbicide Use: 15 of Imazapyr Marshes Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 15c Shoreline Regional Park X Cooley Landing 16.1 Cooley Landing Central X X X 16 Salt Pond Restoration 16.2 Cooley Landing East X X X Alameda Flood 1 Control Channel Alameda Island South (Elsie 17a Roemer Bird Sanctuary, Crown X Memorial State Beach, Crab Cove) 17b Bay Farm Island X 17c.1 Arrowhead Marsh West 9/28-9/29 X X 17c.2 Arrowhead Marsh East WILL NOT BE TREATED IN 2021 MLK Regional Shoreline - Fan 17d.1 7/19-7/20 X Marsh Shoreline 17d.2 Airport Channel - MLK Shoreline 7/19-7/20 X 17d.3 East Creek -MLK Shoreline 7/19-7/20 X MLK Regional Shoreline-Damon 17d.4 X X Marsh Damon Sl/Elmhurst Cr - MLK 17d.5 7/19-7/20 X Shoreline Alameda/ 17e.1 San Leandro Creek North 7/19-7/20 X 17 San Leandro Bay Complex 17e.2 San Leandro Creek South 7/19-7/20 X 17f Oakland Inner Harbor X X 17g Coast Guard Island X 17h MLK New Marsh WILL NOT BE TREATED IN 2021 17i Coliseum Channels X 17j.1 Fan Marsh Wings X 17j.2 Fan Marsh Main WILL NOT BE TREATED IN 2021 17k Airport Channel 7/19-7/20 X X 17l Doolittle Pond 7/19-7/20 X Alameda Island East: Aeolian 17m X Yacht Club & Eastern Shoreline 3 years with no 18a Colma Creek invasive Spartina (2018-2020) * Scheduling occurs throughout the treatment season. Additions and changes are regularly posted. Page 5 of 10 Colma Creek/ 18 San Bruno Marsh Complex 2021 Invasive Spartina Project Treatment Schedule Updated: 6/11/21 Environmental Review Site Locations (map) Treatment Methods Where: How: Herbicide Use: of Imazapyr Treatment Method Treatment Location Treatment Dates* Imazapyr Herbicide Manual Digging, Site Sub-Area *(COI=Dug during Complete Amphibious Aerial: Mowing, Site Name Sub-Area Name Truck Backpack Airboat # Number course of inventory) for 2021? vehicle Broadcast and/or Covering 4 years with no 18b Navigable Slough invasive Spartina (2017-2020) 2 years with no 18c Old Shipyard invasive Spartina (2019-2020) Alameda Flood 1 7 years with no Control Channel 18d Inner Harbor invasive Spartina Colma Creek/ (2014-2020) 18 San Bruno Marsh Complex 18e Sam Trans Peninsula X 4 years with no 18f Confluence Marsh invasive Spartina (2017-2020) 2 years with no 18g San Bruno Marsh invasive Spartina (2019-2020) 18h San Bruno Creek X 19a Brisbane Lagoon X 6 years with no 19b Sierra Point invasive Spartina (2015-2020) 5 years with no 19c Oyster Cove invasive Spartina (2015-2020) 6 years with no 19d Oyster Point Marina invasive Spartina (2015-2020) 19e Oyster Point Park X 19f Point San Bruno X 3 years with no 19g Seaplane Harbor invasive Spartina (2018-2020) 19h SFO X X 19i Mills Creek Mouth X X West San 19 19j Easton Creek Mouth X X Francisco Bay 19k Sanchez Marsh 7/28 X X X X 19l Burlingame Lagoon X X 9 years with no 19m Fisherman's Park invasive Spartina (2012-2020) 19n Coyote Point Marina / Marsh X * Scheduling occurs throughout the treatment season.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us