Environmental Impact Assessment of Jamalpur Economic Zone June 2019 Submitted to Bangladesh Economic Zones Authority Submitted by Infrastructure Investment Facilitation Company [In association with Shahidul Consultant] Disclaimer Disclaimer The report has been prepared by Infrastructure Investment Facilitation Company in association with Shahidul Consultant (hereinafter referred as SC), as an associate firm whereas Infrastructure Investment Facilitation Company (IIFC) was the lead firm, for complete the regulatory requirement of Department of Environment (DoE), Ministry of Environment and Forests, The People’s Republic of Bangladesh. SC has undertaken a detailed environmental survey and has developed a comprehensive Environmental Impact Assessment (EIA) for Jamalpur Economic Zone. Any third party should obtain prior consent of SC before copying or reproducing, in whole or in part, the contents of this report. Furthermore, SC will not be bound to discuss, explain or reply to queries raised by any agency other than the intended recipients of this report. All information in the report is intellectual property of Jamalpur Economic Zone. This assessment and review are based on the facts and details provided during discussions specific to the project. The conclusions drawn and recommendations made are based on the information available at the time of writing this report. SC does not accept any liability or responsibility for the accuracy, reasonableness or completeness of, or for any errors, omissions or misstatements, negligent or otherwise and does not make any representation or warranty, express or implied, with respect to the information contained in this document. The information contained in this document is selective and is subject to updating, expansion, revision and amendment. It does not, and does not purport to, contain all the information that a recipient may require. Further this is not an audit report and no reliance should be based on this report for the purposes of audit. EIA: Jamalpur Economic Zone i Table of Contents Table of content ABBREVIATION AND ACRONYM ............................................................................................................... V EXECUTIVE SUMMARY ........................................................................................................................... VIII 1 INTRODUCTION ................................................................................................................................. 1 1.1 PRELUDE ...................................................................................................................................... 1 1.2 PROJECT BACKGROUND ................................................................................................................... 1 1.3 PROJECT DESCRIPTION .................................................................................................................... 2 1.4 DESCRIPTION OF THE PROJECT SITE .................................................................................................... 3 1.5 RATIONALE FOR THE PROPOSED PROJECT ............................................................................................. 4 1.6 NEED OF THE STUDY ....................................................................................................................... 5 1.7 SCOPE OF THE STUDY ...................................................................................................................... 5 1.8 METHODOLOGY OF THE STUDY .......................................................................................................... 6 1.9 LIMITATION OF THE STUDY ............................................................................................................... 8 1.10 TOR COMPLIANCE MATRIX .............................................................................................................. 8 1.11 EIA TEAM .................................................................................................................................. 12 1.12 STRUCTURE OF THE REPORT............................................................................................................ 12 1.13 REFERENCES ............................................................................................................................... 14 2 LEGISLATIVE, REGULATION AND POLICY CONSIDERATIONS ........................................................... 16 2.1 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK ............................................................................. 16 2.2 LEGAL ENFORCEMENT AGENCIES ..................................................................................................... 16 2.3 APPLICABLE ENVIRONMENTAL AND SOCIAL LAWS, REGULATIONS AND POLICIES .......................................... 20 2.4 WORLD BANK’S OPERATIONAL POLICIES AND GUIDELINES ..................................................................... 34 2.5 APPLICABILITY ............................................................................................................................. 34 2.6 APPLICABLE WORLD BANK GROUP EHS GUIDELINES ............................................................................ 42 2.7 ASIAN DEVELOPMENT BANK (ADB) SAFEGUARD PRINCIPLES AND POLICIES ............................................... 48 2.8 EQUATOR PRINCIPLE FINANCIAL INSTITUTIONS (EPFIS) GUIDELINES ........................................................ 52 2.9 INTERNATIONAL AND NATIONAL ENVIRONMENT STANDARDS/ GUIDELINES ................................................ 54 3 PROJECT DESCRIPTION .................................................................................................................... 64 3.1 INTRODUCTION ............................................................................................................................ 64 3.2 PROJECT OBJECTIVE ...................................................................................................................... 64 3.3 PROJECT OPTIONS ........................................................................................................................ 65 3.4 INTERVENTIONS UNDER SELECTED OPTIONS AND PROJECT ACTIVITIES....................................................... 68 3.5 PROJECT ACTIVITIES ...................................................................................................................... 72 3.6 PROJECT SCHEDULE ...................................................................................................................... 72 3.7 RESOURCES AND UTILITIES ............................................................................................................. 72 3.8 MAP AND SURVEY INFORMATION .................................................................................................... 74 3.9 PLANNING FOR EZ DEVELOPMENT ................................................................................................... 77 3.10 COST ESTIMATION ........................................................................................................................ 78 4 ENVIRONMENTAL AND SOCIAL BASELINE ....................................................................................... 80 4.1 METEOROLOGY ........................................................................................................................... 84 4.2 TEMPERATURE ............................................................................................................................ 85 4.3 AIR QUALITY AND NOISE................................................................................................................ 91 4.4 WATER RESOURCES ...................................................................................................................... 94 4.5 GEOLOGY ................................................................................................................................. 102 EIA: Jamalpur Economic Zone ii Table of Contents 4.6 LAND RESOURCES ...................................................................................................................... 105 4.7 AGRICULTURAL RESOURCES .......................................................................................................... 109 4.8 LIVESTOCK AND POULTRY ............................................................................................................. 113 4.9 FISHERIES RESOURCES ................................................................................................................. 115 4.10 ECOLOGICAL RESOURCES ............................................................................................................. 117 4.11 SOCIO-ECONOMIC CONDITION ...................................................................................................... 123 5 IDENTIFICATION AND ANALYSIS OF KEY ENVIRONMENTAL ISSUES .............................................. 133 5.1 ENVIRONMENTAL SENSITIVITY INVESTIGATION .................................................................................. 133 5.2 ENVIRONMENTAL ASSET .............................................................................................................. 135 5.3 ENVIRONMENTAL HOTSPOT .......................................................................................................... 136 5.4 LIKELY BENEFICIAL IMPACTS .......................................................................................................... 136 5.5 COMMUNITY RECOMMENDATIONS ...............................................................................................
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages270 Page
-
File Size-