Appendix 3 – Statement of Case on Planning Issues - Peter Minto – Conjoined Wind Farm Inquiry (Powys)

Appendix 3 – Statement of Case on Planning Issues - Peter Minto – Conjoined Wind Farm Inquiry (Powys)

Appendix 3 – Statement of Case on Planning Issues - Peter Minto – Conjoined Wind Farm Inquiry (Powys) Renewables Obligation Generators Your search returned 156 sites with a capacity of 767 MW. In the year to the end of Nov-2012 these sites generated 1,910,430 MWh and received 2,182,959 ROCs. Search Again Back to Main List Back to REF Website Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. R00001RDWA Nantcol Works Wales 60 Hydro Hydro 2002-04-01 67.9% 75.7% Aug-2012 362 362 Hafoty Ucha I On-shore R00001RQWA Wales 1,450 Wind 2002-04-01 32.2% 32.8% Nov-2012 4,173 4,173 & III wind Caerfai Wind On-shore R00001RZWA Turbine - D, E, Wales 20 Wind 2003-09-01 16.0% 17.7% Mar-2007 wind Y agent is TL Western Wood Dedicated R00002RAWA Wales 14,730 Biomass 2008-07-03 77.1% 65.4% Nov-2012 94,206 94,206 Energy Plant A biomass Uskmouth Biomass co- R00003RAWA Wales 393,000 Biomass 2005-07-01 0.2% 0.1% Jan-2012 33 33 Power Station firing Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. - A,C,B,E Dyffryn Brodyn On-shore R00003RQWA Wales 5,500 Wind 2002-04-01 18.9% 16.6% Nov-2012 8,027 8,027 Wind Farm - A wind Merthyr Dedicated R00004RAWA Wales 1,000 Biomass Y 2008-08-01 Biomass CHP biomass R00004REWA Dolanog Hydro Wales 178 Hydro Hydro 2002-04-01 15.2% 36.7% Nov-2012 573 573 North Hoyle Off-shore R00004RPWA Offshore Wind Wales 60,000 Wind 2003-11-01 33.7% 35.9% Nov-2012 189,257 189,257 wind Farm - A On-shore R00004RQWA Cemmaes B Wales 3,400 Wind 2002-04-01 29.1% 28.0% Nov-2012 8,365 8,365 wind Dinas Power R00005REWA Wales 13,500 Hydro Hydro 2002-04-01 14.6% 20.5% Nov-2012 24,308 24,308 Station - A Rhyl Flats Off-shore R00005RPWA Wales 90,000 Wind 2009-07-15 32.3% 39.1% Nov-2012 309,248 463,849 Wind farm wind UPM Shotton Dedicated R00006RAWA Paper Boiler 7 Wales 19,655 Biomass Y 2006-10-01 70.1% 68.7% Nov-2012 118,581 237,162 biomass (RA) - A, D Dolgarrog Low- R00006REWA Head Power Wales 14,980 Hydro Hydro 2002-04-01 14.9% 16.2% Nov-2012 21,312 21,312 Station - A C Plas Yn Vivod R00006RYWA Wales 29 Hydro Hydro 2004-05-01 18.0% 9.5% Mar-2007 Hydro - Y, Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. agent is TL Trostrey Dedicated R00007RAWA Generator Wales 3,480 Biomass 2009-08-13 Dec-2009 biomass Station R00007REWA Ffestiniog Wales 760 Hydro Hydro 2002-04-01 22.6% 28.3% Nov-2012 1,889 1,889 Nant-y-moch R00008RYWA dam GEN6 - Wales 50 Hydro Hydro 2004-09-01 56.3% 54.9% Mar-2010 A,C, M Llyn Brianne R00009REWA Wales 4,600 Hydro Hydro 2002-04-01 41.7% 47.8% Jan-2012 5,855 5,855 Dam R00010REWA Llyn Celyn Wales 4,507 Hydro Hydro 2002-04-01 18.3% 22.9% Nov-2012 9,059 9,059 Rheidol On-shore R00011RQWA Wales 2,400 Wind 2002-04-01 27.3% 31.1% Feb-2012 2,208 2,208 Windfarm wind R00012RJWA Docksway Wales 2,000 Landfill Gas Landfill Gas 2002-04-01 57.5% 47.7% Nov-2012 8,382 8,382 R00013REWA Cwmorthin Wales 415 Hydro Hydro 2002-04-01 25.0% 34.2% Nov-2012 1,248 1,248 Llangwyryfon On-shore R00013RQWA Wales 9,350 Wind 2002-04-01 28.6% 30.9% Nov-2012 25,381 25,381 Windfarm wind R00014REWA Elan Valley Wales 3,113 Hydro Hydro 2002-04-01 38.7% 41.5% Apr-2012 4,637 4,637 R00015RJWA Ferry Road Wales 1,000 Landfill Gas Landfill Gas 2002-04-01 21.4% 13.8% Nov-2012 1,212 1,212 Cemmaes C On-shore R00015RQWA Wales 11,900 Wind 2002-04-01 28.5% 31.3% Nov-2012 32,690 32,690 Windfarm wind R00015RYWA Clyn Hydro - D, Wales 6 Hydro Hydro 2004-04-01 29.8% 34.3% Mar-2007 Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. Y. agent is TL R00016REWA Caban Coch Wales 950 Hydro Hydro 2002-04-01 18.4% 35.5% Nov-2012 2,959 2,959 On-shore R00017RQWA Parc-Cynog Wales 3,600 Wind 2002-04-01 25.2% 20.7% Oct-2012 5,822 5,822 wind Tanyrhendy - On-shore R00017RZWA D,Y, agent is Wales 6 Wind 2005-11-01 5.7% 9.5% Mar-2007 wind TL R00018REWA Dulyn Weir Wales 505 Hydro Hydro 2002-04-01 39.0% 47.3% Nov-2012 2,100 2,100 Berwyn Hydro R00019RDWA Wales 240 Hydro Hydro 2006-10-01 34.3% 50.2% Nov-2012 1,059 1,059 - A Eithynffyndd R00020RYWA Wales 30 Hydro Hydro 2005-12-01 23.5% 1.7% Mar-2010 Hydro - A,D,M Pant yr Afon R00022RDWA Hydro Scheme Wales 400 Hydro Hydro 2007-10-01 48.6% 57.0% Nov-2012 2,004 2,004 - (14/3/07) Taff Ely Wind On-shore R00022RQWA Wales 9,000 Wind 2002-04-01 23.9% 23.5% Nov-2012 18,569 18,569 Farm - A wind R00023RDWA Osbaston Weir Wales 150 Hydro Hydro 2008-12-15 37.1% 60.2% Nov-2012 793 793 Afon Iwrch R00023REWA Hydro Power Wales 365 Hydro Hydro 2002-04-01 26.0% 40.6% Nov-2012 1,302 1,302 Station R00023RQWA Bryn Titli Wind Wales 9,900 Wind On-shore 2002-04-01 27.3% 28.6% Nov-2012 24,885 24,885 Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. Farm wind Ty Draw Hydro R00023RYWA Wales 6 Hydro Hydro 2006-01-01 38.7% 36.2% Mar-2010 - D, Y Maesgwyn Isaf, On-shore R00023RZWA Wales 6 Wind 2006-03-01 9.5% 17.1% Mar-2007 - Y, agent is TL wind Talybont-on- Usk Hydro R00024RYWA Wales 37 Hydro Hydro 2006-02-01 49.4% 73.4% Mar-2010 Electric Scheme - A, M Cwmclydach R00025RDWA Micro Hydro Wales 55 Hydro Hydro 2011-07-06 37.3% 37.4% Nov-2012 197 197 generator Garnedd Hydro R00025REWA Power Station Wales 560 Hydro Hydro 2002-04-01 24.1% 38.6% Nov-2012 1,899 1,899 - A Y Gaer - D,Y, R00026RYWA Wales 2 Hydro Hydro 2006-04-01 17.1% 17.1% Mar-2007 agent is TL Coed-Ddu - D, R00028RYWA Wales 2 Hydro Hydro 2005-10-01 22.8% 22.8% Mar-2007 Y, agent is TL Tyllwt - Y On-shore R00028RZWA (01/02/06), Wales 6 Wind 2006-02-01 9.5% 9.5% Mar-2007 wind agent is NP R00029REWA Dolgarrog Wales 18,400 Hydro Hydro 2002-04-01 25.8% 34.0% Nov-2012 55,022 55,022 Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. High-Head Power Station - A,C, G Croesor Power R00030REWA Wales 505 Hydro Hydro 2002-04-01 28.7% 28.6% Nov-2012 1,270 1,270 Station Pwerdy Bach R00030RYWA Llanuwchllyn - Wales 15 Hydro Hydro 2006-06-01 66.4% 70.8% Mar-2010 D, Y Penrhiw - Y, On-shore R00030RZWA Wales 6 Wind 2006-05-01 24.7% 24.7% Mar-2007 agent is TL wind Pontsticill R00031REWA Wales 375 Hydro Hydro 2002-04-01 WTW Cynwyd Power R00032REWA Wales 135 Hydro Hydro 2002-04-01 32.7% 32.7% Aug-2012 321 321 Station On-shore R00034RQWA Llanbabo Wales 20,400 Wind 2002-04-01 25.9% 26.6% Oct-2012 42,750 42,750 wind Alwen Hydro - R00034RYWA Wales 37 Hydro Hydro 2006-11-01 55.4% 36.7% Mar-2010 A, D, M Mynydd On-shore R00035RQWA Wales 600 Wind 2002-04-01 1.9% 17.7% Jul-2012 609 609 Glandulas wind Penrhyddlan On-shore R00036RQWA Wales 12,900 Wind 2002-04-01 19.6% 12.2% Oct-2012 11,400 11,400 Wind Farm - A wind R00037RQWA Llidiartywaun Wales 18,900 Wind On-shore 2002-04-01 21.1% 11.4% Oct-2012 15,193 15,193 Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a. p.a. Wind Farm - A wind Rhyd Y Groes On-shore R00039RQWA Wales 7,200 Wind 2002-04-01 28.3% 29.6% Oct-2012 16,836 16,836 Windfarm - A wind Tyn Y Cornel R00040REWA Hydro (Maes Wales 120 Hydro Hydro 2002-07-01 23.5% 19.9% Nov-2012 210 210 Glas) Gilfachwen - On-shore R00041RZWA D, Y, agent is Wales 5 Wind 2006-08-01 11.4% 11.4% Mar-2007 wind TL Cwm Dyli R00042REWA Power Station Wales 9,900 Hydro Hydro 12.2% 16.4% Jun-2012 8,658 8,658 - A,C On-shore R00046RQWA Carno B Wales 16,800 Wind 2002-04-01 19.8% 22.9% Jan-2012 11,118 11,118 wind On-shore R00047RQWA Carno A Wales 16,800 Wind 2002-04-01 19.3% 22.8% Jan-2012 11,136 11,136 wind The Old On-shore R00048RZWA Vicarage - Y, Wales 6 Wind 2006-07-01 22.8% 22.8% Mar-2007 wind agent is TL On-shore R00049RQWA Trysglwyn Wales 5,600 Wind 2002-04-01 26.6% 22.1% May-2011 wind Mynydd On-shore R00051RQWA Wales 10,200 Wind 2002-04-01 28.7% 30.9% Nov-2012 27,707 27,707 Gorddu wind Installed Latest Latest Generator Technology Technology Accreditation Rolling Annual Latest_ROC RID Country Capacity CHP MWh ROCs Name Group Sub-group Date LF LF Date (kW) p.a.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us