Non-Notified Resource Consents Approved Between 7 May and 10 June 2005

Non-Notified Resource Consents Approved Between 7 May and 10 June 2005

Non-notified resource consents approved between 7 May and 10 June 2005 File Reference Consent Holder Site Name Purpose Description Activity Type WGN000007 Plimmerton Landscaping Adjacent Taupo Swamp, To deposit 300mm of concrete quarry material Structure: General, Supplies Ltd Plimmerton and clean fill, and extract peat to an average Earthwork, Stream depth of 1 metre from the bed of Taupo Work Swamp, associated with the formation of a platform for industrial development in the bed of the Taupo Swamp. WGN000007 Marathon Developments Adjacent Taupo Swamp, To deposit 300mm of concrete quarry material Structure: General, Ltd Plimmerton and clean fill, and extract peat to an average Earthwork, Stream depth of 1 metre from the bed of Taupo Work Swamp, associated with the formation of a platform for industrial development in the bed of the Taupo Swamp. WGN050003 IBM New Zealand Ltd IBM, 85 The Esplanade, Petone To change condition 4 relating to timing for Discharge To Air increasing stack heights for the operation of a gas-fired boiler and emergency diesel generator. WGN050164 Keryn Martin 16 Sim Street, Johnsonville To place and maintain a pipe in the bed of an Stream Work unnamed stream for property access, including associated stream bed disturbance. WGN050212 Carrus Limited Stage IV Aotea Block To reclaim sections of three unnamed Reclamation, Development, Porirua ephemeral tributaries of Kenepuru Stream, and Stormwater Discharge discharge contaminants (including sediment and other local material) to land where it may enter water in association with earthworks. WGN050221 Mark Corrigan 245 Ngatiawa Rd, Reikorangi To install eight gabion basket groynes in the Stream Work ATTACHMENT 1 TO REPORT05.306 bed of Ngatiawa River, and to excavate the bed to remove a gravel constriction, for the purposes of flood and erosion protection. WGN050242 Summerset Village Summerset Villages, Aotea Drive, To discharge contaminated stormwater from Stormwater Discharge (Paraparamu) Ltd Porirua an area of bulk earthworks to land where it may enter water. WGN050246 Transit NZ Paukumu/Reservoir Stream, To permanently divert the stream, and install a River/Stream Diversion Paekakariki larger pipe culvert. PAGE 1OF3 PAGE 2OF3 ATTACHMENT 1 TO REPORT05.306 File Reference Consent Holder Site Name Purpose Description Activity Type WGN050247 Transpower New Zealand Within the Cook Strait Cable To use and maintain three high voltage Occupation Ltd Protection Zone submarine cables and two fibre optic cables within the coastal marine area, and to occupy the coastal marine area with these cables and three additional unused cables. WGN050253 Greg & Rachelle Beale Rangiora River, 102 Rangiora To realign a section of a tributary, and divert Stream Work, Road, Reikorangi the flow, of the Rangiora River, including Reclamation, associated reclamation, diversion and river bed River/Stream Diversion disturbance. WGN050258 GW Parks and Forests Foreshore near Pencarrow Head, To place and maintain boulders and/or Coastal Department Eastbourne concrete blocks on the foreshore near Work/Disturbance Pencarrow Head to prevent stock access, including any associated disturbance and occupation of the foreshore. WGN050265 The Environmental Tributary of Makara Stream To place and maintain rock rip-rap in the bed Stream Work Challenge Ltd of an unnamed tributary of the Makara Stream for erosion protection of an existing culvert, including associated stream bed disturbance. WGN050267 Pauatahanui Golf Club Inc Little Waitangi Stream, 450 To take and use surface water from Little Water Use Flightys Road, Judgeford Waitangi Stream. WGN050269 R J B Clevely 316 Reikorangi Road, Reikorangi To undertake crossblading in the beds of Stream Work, Waikanae River and Reikorangi Stream, River/Stream Diversion including associated permanent flow diversion. WGN050271 Department of Unnamed tributary of the To take surface water from an unnamed Take, Stream Work Conservation Waiotauru River, Otaki tributary of the Waiotauru River to supply a micro-hydro power system, and to place a pipe in the stream bed. WGN050279 Mobil Oil NZ Limited 24-30 Main Rd, Waikanae (Mobil) To construct up to eight bores for groundwater Bore monitoring purposes. WGN050280 Philip & Dorothy Tortell Waikakariki Stream To place, use and maintain a rock ramp in the Stream Work Waikakariki Stream, including associated stream bed disturbance. WGN050281 GW Biosecurity Western Akatarawa Saddle, To aerially discharge sodium Agrichemical Discharge Department Upper Hutt monofluoroacetate (1080) to land and surface water bodies in a cereal bait form. File Reference Consent Holder Site Name Purpose Description Activity Type WGN050282 Cosgrove Goodwin Korimako Stream, 35-37 To use and maintain the extension of an Bridge Architecture Waikowhai Street, Ngaio existing culvert in Korimako Stream. WGN050283 Todd Elliot 99 Main Rd North, Waikanae To construct a bore for domestic and stock Bore use. WGN050285 M & J Page Ringawhati Road, Otaki To construct a bore for domestic use and stock Bore watering. WGN050286 Hutt City Council 45 and 55 Brookfield Lane, To place, use and maintain rock rip-rap in the Stream Work, Moores Valley bed of the Wainuiomata Stream and undertake River/Stream Diversion associated stream bed disturbance; and to permanently divert the flood flows of the Wainuiomata Stream during flood events in association with the construction of a stopbank. WGN050288 Department of Catchpool Stream, Rimutaka To place, use and maintain a foot bridge Bridge Conservation Forest Park, Wainuiomata across the Catchpool Stream. WGN050290 Transpower New Zealand Oteranga Stream, Black Gully, To periodically extract gravel from, and Stream Work Ltd South Makara recontour the bed and banks of, the Oteranga Stream at various crossing points and undertake associated disturbance of the stream bed. WGN050291 GW Resource Policy Adjacent to lower reaches of To construct up to 12 bores/pits for Bore Department Waiwhetu Stream, Lower Hutt geotechnical investigations. WGN050293 Napier Sandblasting Co Ltd NZ Oil Services, 43-55 Port Road, To discharge contaminants to air associated Discharge To Air Petone with the abrasive blasting of a fuel storage tank. WGN050295 GW Resource 149 Peka Peka Road, Peka Peka To construct a bore for groundwater Bore Investigations Department monitoring. WGN050296 Shane Haggland Paremata Bridge area, Paremata To construct a new swing mooring. Mooring ATTACHMENT 1 TO REPORT05.306 WGN050297 Peter Beddek 40 Monarch Place, Paraparaumu To construct a bore for irrigation purposes. Bore WGN050345 GW Resource Policy Waiwhetu Stream, Gracefield, To take groundwater by way of dewatering Take Department Lower Hutt during the construction of test pits. WGN050347 Stuart Shaw Located outside Mana Marina To construct a swing mooring. Mooring PAGE 3OF .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us