Tunnel Segment Backfilling with Double Shield Tbms

Tunnel Segment Backfilling with Double Shield Tbms

Tunnel Segment Backfilling with Double Shield TBMs OVERVIEW • Factors Determining Backfilling Annulus Gap • Pea Gravel Backfill • Pea Gravel Grout Injection • Combination Pea Gravel & Mortar Backfill Factors Determining Backfilling Annulus Gap FACTORS DETERMINING BACKFILLING ANNULUS GAP General Aspects about Annulus Gap & Backfill • Ring build clearance • Tail shield thickness • Overcut for TBM steering and cutter wear allowance • “Tapered” or “non-tapered” shield body construction • Pea gravel injection through segments most common FACTORS DETERMINING BACKFILLING ANNULUS GAP Overcut for TBM Steering & Cutter Open Type Tail Shield Wear Allowance (Rock Tunnels) Tail Shield Thickness Segment Build Clearance Annulus Gap, Inside Tail Shield Annulus Volume Pea Gravel Backfill PEA GRAVEL BACKFILL Pea Gravel Backfill General Aspects • Often used for PCC segments in rock tunnels • Applied at full tail shield and open tail shield • Open tail shield with pea gravel injection through segments is common method in rock tunneling • Grout injection of pea gravel is often added PCC = Pre Cast Concrete PEA GRAVEL BACKFILL Pea Gravel Backfill w/Open Type Tail Shield • Invert segment placed on bored tunnel • “Feet” on invert segment provides ring stability during ring build • No tail shield brushes required; tail shield can be thinner • No tail shield grease required • Pea gravel backfill is simple and well proven PEA GRAVEL BACKFILL Pea Gravel Backfill w/Open Type 1600mm Tail Shield LONG SEGMENTS Grout in Pea Gravel Interstices (@30%) • Segments = 0.3 x 3.23m3 = with invert 0.973 per ring “feet” • The feet allow the segment ring to be Ø 7650 built directly Bore w/ Pea New on the rock Gravel Cutters 3.23m3 tunnel invert per ring 50mm Pads on Invert Segment • The feet 49.5 Invert Grout provide four 0.38 per ring (invert pads not point stability included) Invert Grout w/Invert Pads as shown Approx. 0.1m3 per ring Pea Gravel Grout Injection PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Pea Gravel Fill Via Hole… Rings Not Completely Backfilled #4 #3 #2 #1 No Tail Brushes 45° Angle of Repose PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Detail – hole for backfill injection pointed rearwards - no threaded insert Detail – hole for erector pickup. PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Self-clamping injection nozzle. No threaded insert required. PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Insert must be minimum Ø70mm clear to prevent clogging PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Segment backfill via segment at crown PEA GRAVEL BACKFILL Pea Gravel Backfill Injection via Segments Segment backfill via segment at invert area PEA GRAVEL BACKFILL Pea Gravel Backfill Technical Method • Pea gravel is delivered into the annulus by means of dry type rotary shotcrete pumps (“blowing”) • Shotcrete pump should be placed as far forward as possible to minimize hose length • Insert opening Ø70mm clear to prevent clogging • Hose size DN60 or DN70 • Pea gravel backfill takes place separate from TBM advance, thus no waiting is time required for annulus backfill to gain strength • Pea gravel annulus is usually grouted as a secondary operation - theoretic gravel interstices have volume 30%, but 50% more realistic PEA GRAVEL BACKFILL Pea Gravel Backfill Injection Equipment Dry type rotary shotcrete pump PEA GRAVEL BACKFILL Pea Gravel Backfill Handling in Large Tunnels There is room for bulk material handling and bunkering of pea gravel PEA GRAVEL BACKFILL Pea Gravel Backfill Handling in Small Tunnels • Limited space for pea gravel handling systems • Often times, there is not enough space to bunker a sufficient volume of pea gravel • Pea gravel will be offloaded from a rail car during the TBM cutting stroke; this needs attention with respect to train movements • Train operation cycle should be carefully considered to avoid “bottlenecks” PEA GRAVEL BACKFILL Pea Gravel Backfill Handling in Small Tunnels Pea Gravel Bunker and Conveyor Pea Gravel Pump Pea Gravel Transport Bin hauled on Flat Car PEA GRAVEL BACKFILL Pea Gravel Backfill Grout Injection • Grout is injected in pea gravel as a secondary operation • Theoretical interstices spaces in pea gravel at 30% • Realistically, it is 50% since pea gravel does not fill the gap completely • Uses grout mixer, agitator, and piston or mono type pump for injection via segment holes • Grout injection will be performed at a distance from the place of pea gravel injection Combination Pea Gravel & Mortar Backfill COMBINED PEA GRAVEL & MORTAR BACKFILL Combined Pea Gravel & Mortar Backfill Pea Gravel Backfill Invert Mortar Backfill COMBINED PEA GRAVEL & MORTAR BACKFILL Combined Pea Gravel & Mortar Backfill Invert Mortar Injection pipes built into Tail Shield COMBINED PEA GRAVEL & MORTAR BACKFILL Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte, Italy Limestone, Marl DS303 3.5 Kunming, China Siltstone, Mudstone DS234 4.1 Talave, Italy Limestone, Marl, Clay DS301 4.3 BAM, Russia Gneiss, Hornfels DS287 5 Busan, Korea Granite, Gneiss DS325 10 Veligonda India Quartzite, Schist DS318 10 AMR, India Granite, Porphry Thank You .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us