World Bank Document

World Bank Document

Environment and Social Impact Assessment Project Report Rehabilitation of Kisumu Sewage Treatment Plant Client Lake Victoria Environment Management Project Phase 2 (LVEMP II) Assignment: Carrying out Environmental and Social Impact Assessment on the Proposed Rehabilitation of Kisumu Sewage Treatment Plant Public Disclosure Authorized Report Title: Environmental Impact Assessment Project Report Report Prepared by: Aquaclean Services Limited Firm of Experts (NEMA Reg. No. 1899), P. O. Box 1902 – 00100, Nairobi KENYA Public Disclosure Authorized Signed: Date: Mr. Harrison W. Ngirigacha (MSc. WERM, BSc. Chem. NEMA Reg.), Lead EIA Expert (NEMA Reg. No. 0027) Aquaclean Services Limited Client: Public Disclosure Authorized The National Coordinator, Lake Victoria Environment Management Project II 2nd Floor, Reinsurance Plaza P. O. Box 9220 – 40100, Kisumu, Kenya Tel.: +254-57-2020563 Fax: +254-57-2022284 Email: [email protected] Public Disclosure Authorized Signed: Date: Lake Victoria Environment Management Project Phase 2 (LVEMP II) Page1 Consultant: Aquaclean Services Limited Environment and Social Impact Assessment Project Report Rehabilitation of Kisumu Sewage Treatment Plant Table of Contents ACRONYMS ............................................................................................................................................................... 6 EXECUTIVE SUMMARY ........................................................................................................................................... 7 CHAPTER 1: PROJECT BACKGROUND ...................................................................................................... 13 1.1 INTRODUCTION .................................................................................................................................................. 13 1.1.1 Category “A” Projects ............................................................................................................................ 13 1.1.2 Category “B” Projects ............................................................................................................................ 13 1.1.3 Category “C” Projects ............................................................................................................................ 14 1.2 LAKE VICTORIA ENVIRONMENT MANAGEMENT PROJECT ................................................................................ 14 1.3 THE REHABILITATION PROJECT ........................................................................................................................ 15 1.4 EIA JUSTIFICATION ........................................................................................................................................... 15 1.5 TERMS OF REFERENCE ..................................................................................................................................... 16 1.5.1 EIA Objectives ........................................................................................................................................ 16 1.5.2 Scope of EIA ........................................................................................................................................... 16 1.6 EIA METHODOLOGY ......................................................................................................................................... 17 1.6.1 Environmental Scoping ......................................................................................................................... 18 1.6.2 Impacts Assessments and Mitigation Measures ............................................................................... 18 1.6.3 Field Assessment .................................................................................................................................. 18 1.6.4 Reporting ................................................................................................................................................. 18 1.6.5 EIA Outputs ............................................................................................................................................ 18 1.6.6 EIA Team ................................................................................................................................................ 18 CHAPTER 2: PROJECT DESCRIPTION ........................................................................................................ 20 2.1 LOCATION .......................................................................................................................................................... 20 2.2 ADMINISTRATIVE SETTING ................................................................................................................................ 21 2.2.1 Water Supply .......................................................................................................................................... 21 2.2.2 Sewerage Services Coverage ............................................................................................................. 22 2.3 THE INFRASTRUCTURAL GENERAL STATUS ..................................................................................................... 25 2.3.1 Sewer System ........................................................................................................................................ 25 2.3.2 Nyalenda Sewage Treatment Lagoons .............................................................................................. 25 2.3.3 Kisat Sewage Treatment Plant ............................................................................................................ 26 2.3.4 Observations .......................................................................................................................................... 28 2.4 PROPOSED INTERVENTION PROJECT ............................................................................................................... 29 2.5 DESIGN PRINCIPLES ......................................................................................................................................... 30 2.5.1 General .................................................................................................................................................... 30 2.5.2 Sewage Treatment ................................................................................................................................ 30 2.5.3 Sewers..................................................................................................................................................... 35 2.5.4 Hazards in Wastewater Treatment Plants ......................................................................................... 38 2.6 PROJECT ALTERNATIVE ANALYSIS ................................................................................................................... 38 2.6.1 “NO Action” Alternative ......................................................................................................................... 38 2.6.2 Design Alternatives ................................................................................................................................ 38 2.6.3 Management Alternatives ..................................................................................................................... 39 2.7 ANTICIPATED CHALLENGES .............................................................................................................................. 39 2.8 INTERVENTION THOUGHTS ............................................................................................................................... 39 2.9 PROJECT IMPLEMENTATION PLAN .................................................................................................................... 40 2.10 PROJECT COST ESTIMATES ............................................................................................................................. 40 Lake Victoria Environment Management Project Phase 2 (LVEMP II) Page 2 Consultant: Aquaclean Services Limited Environment and Social Impact Assessment Project Report Rehabilitation of Kisumu Sewage Treatment Plant CHAPTER 3: POLICY, LEGAL ISSUES AND INSTITUTIONAL FRAMEWORK ....................................... 41 3.1 AN OVERVIEW ................................................................................................................................................... 41 3.2 POLICY PROVISIONS ......................................................................................................................................... 41 3.2.1 National Environment Action Plan (NEAP) ........................................................................................ 41 3.2.2 National Policy on Water Resources Management and Development .......................................... 41 3.2.3 Sessional Paper No. 6 of 1999 on Environment and Sustainable Development ......................... 42 3.3 LEGAL FRAMEWORK ......................................................................................................................................... 42 3.3.1 The Environment Management and Co-ordination Act, 1999 ......................................................... 42 3.3.2 Environmental Management Regulations .......................................................................................... 43 3.3.3 The Water Act 2002 .............................................................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    97 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us