Portsmouth Lane Closures and Traffic Alerts The Department of Engineering reminds drivers of the following lane closures and traffic alerts -- Intermittent lane closures on High Street at the Churchland Bridge will resume on Friday evening, October 23rd, at 7 p.m. and last until 5 a.m. Saturday morning. The intermittent lane closures with flaggers will be approximately once an hour during Verizon work in support of the Churchland Bridge project. During milling and paving work, Taft Drive, between Cavalier Boulevard and Avondale Road, will have moving lane closures with flaggers until Thursday, October 29th. Two-way traffic will be maintained during the work which is scheduled for 7 a.m. until 6 p.m. daily. For more information, please call the Department of Engineering at 393-8592. DriveERT WEEKLY LANE CLOSURE SCHEDULE From Friday, October 23 to Friday, October 30 Below is a list of significant tunnel/lane closures for the Elizabeth River Crossings (ERC) facilities. All work is dependent upon weather conditions and closure dates are subject to change. For updates, follow us on Twitter @DriveERT. US 58 West Midtown Tunnel: Full closure in the Midtown Tunnel westbound on Sunday, October 25 from 9 p.m. to 4 a.m. the following morning. US 58 West Midtown Tunnel: Alternating lane closures in the Midtown Tunnel westbound on Monday, October 26; Tuesday, October 27; Wednesday, October 28 and Thursday, October 29 from 8 p.m. to 5 a.m. the following morning. I-264 East Downtown Tunnel: Left lane closure in the Downtown Tunnel eastbound on Friday, October 23 from 8 p.m. to 5 a.m. the following morning. I-264 East: Left lane and left-center lane closures on I-264 East between Frederick Blvd. and Effingham St. on Sunday, October 25 from 7 a.m. to 2 p.m. I-264 West: Left lane and left-center lane closures on I-264 West between Effingham St. and Fredrick Blvd. on Sunday, October 25 from 7 a.m. to 2 p.m. I-264 East: Alternating lane closures on I-264 East from Frederick Blvd. to the Berkley Bridge on Monday, October 26 and Tuesday, October 27 from 8 p.m. to 5 a.m. the following morning. I-264 West: Alternating lane closures on I-264 West from the Berkley Bridge to Frederick Blvd. on Monday, October 26 and Tuesday, October 27 from 8 p.m. to 5 a.m. the following morning. VA 164 West: Left lane and left-center lane closures on VA 164 West from London Blvd. to Port Norfolk Exit on Sunday, October 25 from 7 a.m. to 2 p.m. Follow us! The Virginia Department of Transportation (VDOT) encourages motorists to “Know Before You Go” and plan your trip with free tools: • Download the 511 smartphone app • Visit the 511 Virginia website or dial 511 for traffic information on your phone HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS For the week of Oct. 25-31 NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges. *Scheduled closures are subject to change based on weather conditions and other factors.* For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511. Bridges & Tunnels: Monitor-Merrimac Memorial Bridge-Tunnel, I-664: Alternating, mobile, single-lane closures northbound on Oct. 25 from 9 p.m. to 5 a.m. Single-lane closures southbound on Oct 26-28 from 8 p.m. to 5 a.m. Alternating, mobile, single-lane closures: Northbound on Oct. 27 from 9 a.m. to 2 p.m. Southbound on Oct. 28 from 9 a.m. to 2 p.m. HRBT Expansion Project: For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org. James River Bridge, Route 17: Alternating, mobile, single-lane closures: Northbound on Oct. 28 from 9 a.m. to 3 p.m. Southbound on Oct. 28-29 from 9 a.m. to 3 p.m. George P. Coleman Bridge, Route 17: Alternating, mobile, single-lane closures in both directions on Oct. 30 from 9 a.m. to 3 p.m. Elizabeth River Tunnels (Downtown/Midtown tunnels): Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164). I-64 Widening Segment III Project, York County: Single-lane closures on I-64 east and west from Route 199/Lightfoot (exit 234) to Route 199/Humelsine Parkway (exit 242) Oct. 25-29, starting as early as 7 p.m. to 5 a.m. Brief, intermittent stoppages scheduled overnight Oct. 29, on I-64 west between Route 199/Lightfoot (exit 234) and Route 143/Camp Peary (exit 238). Lane closures under flagger control on East Rochambeau Drive between Route 199/Newman Road and Oaktree Road Oct. 28-30, from 7 a.m. to 5 p.m. A consecutive, long-term full ramp closure and diversion on the existing Route 199 west on-ramp to I-64 west in Lightfoot continues. Westbound traffic on Route 199 follow detour signage in place directing motorists to a new temporary median crossover to access the Route 199 east on- ramp to I-64 west during the closure. A consecutive, long-term lane closure under traffic signal control on Colonial Parkway at the I-64 overpass continues. A consecutive, long-term full ramp closure on Route 143 Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure. I-64, Southside Widening, High Rise Bridge Expansion: For a full list of on-going traffic impacts and lane closures, visit the project traffic alerts page: 64highrise.org/news_and_traffic_alerts/lane_closures.asp Alternating, single-lane closures on I-64 in both directions between South Military Highway (exit 297) and Greenbrier Parkway (exit 289): Oct. 26-29, from 7 p.m. to 5 a.m. Oct. 30, from 9 p.m. to 7 a.m. Oct. 31, from 8 p.m. to 9 a.m. Nov. 1, from 8 p.m. to 5 a.m. Slow rolls with stoppages of up to 20 minutes on I-64 east starting as early as 9 p.m.: On Oct. 28 at the Yadkin Road overpass On Oct. 29 at the Shell Road overpass I-64, Williamsburg: Full closure of the off-ramp (exit 242A) from I-64 west to Route 199 west (Humelsine Parkway) on Oct. 25-27 from 7 p.m. to midnight. I-64, Express Lanes: Full closure of I-64 Express Lanes in both directions on: Oct. 26-28 from 9 a.m. to as late as noon Oct. 26-30 from 8 p.m. to 3 a.m. I-64 / I-264 Interchange Improvements Project, Norfolk/Virginia Beach: Alternating, multi-lane closures in both directions on I-264 between Newtown Road (exit 15) and Witchduck Road (exit 16) on Oct. 25-30 starting as early as 7 p.m., with more than two lanes closed no earlier than 9 p.m., through 5 a.m. Resuming as early as Oct. 26, a nightly closure and detour on Grayson Road at South Witchduck Road, through mid-November. Click here for the full traffic alert: conta.cc/30xPFAz I-95, Emporia: Intermittent, full closures of both on-ramps from Route 58 to I-95 on Oct. 25-26 from 9 p.m. to 5 a.m. Other Notable Closures Full closure of the off-ramp from Route 199 east (Humelsine Parkway) to Route 143 north (Merrimac Trail) on Oct. 26-28 from midnight to 6 a.m..
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages6 Page
-
File Size-