Selby Canalside Park

Selby Canalside Park

AINA CASE STUDY PLACE MAKING AND SHAPING Selby canalside park Environmental improvements to benefit all waterway users The broad 20 kilometre Selby Canal in North Yorkshire links the River Ouse with the Aire and Calder Navigation. A programme of improvements was carried out to encourage better links between the canal and the historic town centre. These were initially identified in a detailed canal corridor study. Proposals were developed to create a linear canalside park, approximately one kilometre in length, linking with pedestrian routes to the town centre and the regenerated Ouse waterfront. The scheme included improved towpath surfacing, significant landscape work, better access and signage, seating and public art, car parking and new provision for anglers. Issues to be addressed included measures to reduce user conflict, access for all, refurbishment of an original swing bridge, liaison with neighbouring industrial premises and positive involvement of local people and schoolchildren. Local schools were invited to contribute ideas for a sculpture to celebrate the history of the canal, and a mosaic was also developed with their input. Adjoining businesses were asked to consider the ways in which their towpath boundaries could be improved and, where possible, funds were made available to assist. An innovative part of the work included the development of a dedicated off-side walkway which caters for anglers without potential conflicts from other users. This also included a series of timber platforms specially built to cater for disabled anglers. Car parking for anglers was also provided. Towpath surfacing was a combination of limestone with dust and spray and chip, with timber boards or stone setts used as edging. All were chosen to cater for multi-use including cycling. New mooring bollards were installed with improved facilities in the small basin at Selby Lock. A second phase allowed towpath works to continue further south and included an additional fifty angling pegs, with five designed for disabled use. The improvements have been successfully maintained and the Trans-Pennine Trail now passes along the towpath (see separate case study). Funding for the £150,000 scheme came from central government, Selby District Council, British Waterways and Landfill Tax credits. The local Groundwork Trust and Selby Angling Amalgamation also provided support. The canalside park at Selby features maturing trees, shrubs, moorings, seating, angling platforms and public art. Dedicated car parking is provided on the adjacent road AINA www.aina.org.uk .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us