Traffic Analysis Technical Report, I-5 Rose Quarter Improvement Project

Traffic Analysis Technical Report, I-5 Rose Quarter Improvement Project

FINAL Traffic Analysis Technical Report I-5 Rose Quarter Improvement Project Oregon Department of Transportation January 8, 2019 Traffic Analysis Technical Report Oregon Department of Transportation Contents Acronyms and Abbreviations ........................................................................................................ v Ex ec utive Summary .............................................................................................................. ES-1 1 Introduction .......................................................................................................................1 1.1 Project Location.........................................................................................................1 1.2 Project Purpose .........................................................................................................1 1.3 Project Need .............................................................................................................1 1.4 Project Goals and Objectives .......................................................................................5 2 Project Alternatives.............................................................................................................6 2.1 No-Build Alternative....................................................................................................6 2.2 Build Alternative.........................................................................................................8 2.2.1 I-5 Mainline Improvements ...............................................................................9 2.2.2 Highway Covers ........................................................................................... 10 2.2.3 Broadway/Weidler Interchange Improvements .................................................. 14 2.2.4 Related Local System Multimodal Improvements ............................................... 16 3 Regulatory Framework ...................................................................................................... 20 3.1 Federal Plans and Policies ........................................................................................ 20 3.1.1 ADA Guide .................................................................................................. 20 3.1.2 Federal Highway Administration (FHWA) Bicycle and Pedestrian Guides .............. 20 3.2 State Laws, Plans, and Policies.................................................................................. 20 3.2.1 Oregon Transportation Plan ........................................................................... 20 3.2.2 Oregon Highway Plan ................................................................................... 21 3.2.3 ODOT Highway Design Manual ...................................................................... 21 3.2.4 Division 51: Access Management Rules ........................................................... 22 3.3 Regional and Local Plans.......................................................................................... 22 3.3.1 TriMet Plans ................................................................................................ 22 3.3.2 City of Portland Transportation System Plan and Mixed-Used Multi-Modal Plan............................................................................................................ 22 3.3.3 Go Lloyd ..................................................................................................... 23 3.4 Other Relevant Guidance .......................................................................................... 23 3.4.1 American Association of State Highway and Transportation Officials (AASHTO) ................................................................................................... 23 3.4.2 National Association of City Transportation Officials Urban Street Design Guide.......................................................................................................... 24 4 Methodology and Data Sources .......................................................................................... 25 4.1 Project Area and Area of Potential Impact.................................................................... 25 4.2 Resource Identification and Evaluation ........................................................................ 25 4.2.1 Study Intersections ....................................................................................... 25 4.2.2 Traffic Volumes ............................................................................................ 28 4.3 Ass ess ment of Impac ts ............................................................................................. 30 4.3.1 Operational Criteria ....................................................................................... 30 4.3.2 Mobility Standards ........................................................................................ 31 4.3.3 Traffic Operations Software ............................................................................ 31 4.4 Cumulative Impacts.................................................................................................. 39 January 8, 2019 | i Traffic Analysis Technical Report Oregon Department of Transportation 75 Affected Environment........................................................................................................ 40 5.1 Existing Highway Traffic Operations............................................................................ 40 5.1.1 HCS Results ................................................................................................ 40 5.1.2 Lane-by-Lane Speed..................................................................................... 42 5.1.3 Highway Travel Time..................................................................................... 45 5.2 Existing Local Street Traffic Operations ....................................................................... 47 5.2.1 Sy nc hro Analys is Res ults............................................................................... 47 5.2.2 VISSIM Analysis Results ............................................................................... 49 5.2.3 Streetcar Travel Time .................................................................................... 51 5.2.4 Bic yc le Delay ............................................................................................... 51 6 Environmental Consequences ............................................................................................ 53 6.1 No-Build Alternative.................................................................................................. 53 6.1.1 Direct Impacts .............................................................................................. 53 6.1.2 Indirect Impacts ............................................................................................ 53 6.2 Build Alternative....................................................................................................... 53 6.2.1 Short-Term Construction Impacts .................................................................... 54 6.2.2 Long-Term and Operational Direct Impacts....................................................... 54 6.2.3 Long-Term and Operational Indirect Impacts..................................................... 80 6.3 Cumulative Effects ................................................................................................... 81 6.3.1 Spatial and Temporal Boundaries ................................................................... 82 6.3.2 Past, Present, and Reasonably Foreseeable Future Actions................................ 82 6.3.3 Results of Cumulative Impact Analysis............................................................. 83 6.4 Conclusions ............................................................................................................ 84 7 Avoidance, Minimization, and Mitigation Measures ................................................................ 85 8 Contacts and Coordination................................................................................................. 86 9 Preparers ........................................................................................................................ 87 10 References...................................................................................................................... 89 Tables Table 1. I-5 Ramps in the Project Area ...........................................................................................7 Table 2. Weave Distances within the Project Area............................................................................7 Table 3. Traffic Volume Summary – Existing Condition 8:00-9:00 AM ............................................... 36 Table 4. Traffic Volume Summary – Existing Condition 5:00-6:00 PM ............................................... 37 Table 5. HCS Analysis Results: Existing First Peak Hour AM (PM) ................................................... 41 Table 6. HCS Analysis Results: Existing Second Peak Hour AM (PM)............................................... 41 Table 7. Existing Conditions - Travel Time (minutes) ...................................................................... 45 Table 8. Synchro Analysis Results: Existing AM Peak Period........................................................... 48 Table 9. Synchro Analysis Results: Existing PM Peak Period..........................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    100 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us