NHPC Limited

NHPC Limited

ENVIRONMENTAL MANAGEMENT PLAN OF DIBANG MULTIPURPOSE PROJECT , ARUNACHAL PRADESH Prepared for NHPC Limited WAPCOS LIMITED CONTENTS SERIAL PAGE CONTENTS NO. NO. CHAPTER 1 PROJECT DESCRIPTION 1.1 Introduction 1-1 1.2 Dibang Multipurpose Project: Historical Milieu 1-2 1.3 Environmental Management Plan (EMP) 1-3 1.4 Outline of Environmental Management Plans 1-4 CHAPTER 2 BIODIVERSITY CONSERVATION AND MANAGEMENT PLAN 2.1 Introduction 2-1 2.2 Compensatory Afforestation 2-1 2.3 Conservation Plan for Endangered species of plants 2-1 2.4 Establishment of Gardens for Voucher Specimen 2-4 2.5 Wildlife Conservation 2-5 2.6 Biodiversity Conservation 2-7 2.7 Preparation of peoples Biodiversity Registers (PBR) 2-11 2.8 Forest Protection Plan 2-11 2.9 Safeguards during construction phase 2-13 2.10 Biodiversity Management Committee (BMC) 2-14 2.11 Cost Estimate for Biodiversity Conservation Plan 2-15 CHAPTER 3 CATCHMENT AREA TREATMENT PLAN 3.1 Introduction 3-1 3.2 Catchment Area Treatment 3-2 3.3 Estimation of Soil Erosion 3-2 3.3.1 Drainage 3-3 3.3.2 Delineation of Watersheds and Sub-watersheds 3-3 3.3.3 Slope 3-4 3.3.4 Land Use/ Land Cover Mapping 3-6 3.3.5 Soils 3-11 3.3.6 Sediment Yield Index Model 3-12 3.3.7 Sediment Yield Weightage Value 3-13 3.3.8 Delivery Ratio 3-14 3.3.9 Sediment Yield Index 3-14 3.3.10 Prioritization of Subwatersheds 3-14 3.4 Methodology for Prioritization 3-14 3.5 Assignment of Erosivity Weightage Value 3-15 3.6 Assignment of Delivery Ratios (DRs) 3-16 3.7 Computation of Silt Yield Index 3-16 3.8 Prioritization of Subwatersheds 3-20 3.9 Area Identified for CAT 3-21 3.10 Period and Schedule of Implementation 3-22 3.11 Details of Treatment Measures with Unit Cost Estimate 3-26 3.11.1 Silt Retention Dams 3-26 3.11.2 Contour bunding 3-27 3.11.3 Brush Wood Check Dams 3-27 3.11.4 Loose Bolder Check Dam 3-28 i 3.11.5 Gabion Structures 3-30 3.11.6 Biological Measures 3-30 3.12 Administrative Charges 3-31 3.13 Administrative Setup 3-31 3.14 Contingency Charges 3-31 3.15 Monitoring, Evaluation and Maintenance 3-32 3.16 Cost Estimate 3-32 3.17 Cost Estimate for CAT Plan 3-34 CHAPTER 4 FISH MANAGEMENT PLAN 4.1 Introduction 4-1 4.2 Fish In Dibang River 4-1 4.3 Conservation And Management Considerations Of Dibang 4-2 River 4.4 Management Measures 4-3 4.5 Recommendations 4-5 4.5.1 Fish Hatchery 4-5 4.5.1.1 Seed Collection 4-5 4.5.1.2 Analysis of Water Quality 4-6 4.5.1.3 Seed Stocking 4-6 4.5.1.4 Organization of Fishermen 4-6 4.5.1.5 Other Requirements 4-6 4.5.1.6 Conservation of Downstream River Bed 4-6 4.5.2 Management of Reservoir Fisheries 4-7 4.5.2.1 Institutional Mechanism 4-7 4.5.2.2 Staffing Pattern 4-7 4.5.2.3 Planning and Monitoring 4-8 4.6 Cost Estimates for Fish Management Plan 4-8 CHAPTER 5 GREENBELT DEVELOPMENT PLAN 5.1 Introduction 5-1 5.2 Plantation 5-1 5.3 Cost Estimate for Greenbelt Development 5-2 CHAPTER 6 GEO - ENVIRONMENTAL MANAGEMENT PLAN 6.1 Introduction 6-1 6.2 Landslide Control 6-1 6.2.1 Landslide Control Measures 6-1 6.2.2 Treatment of slope conformation 6-2 6.3 Drainage of Landslide Areas 6-3 6.4 Mitigation Measures 6-6 6.5 Cost Estimate for Geo-Environmental Management Plan 6-12 CHAPTER 7 MUCK DISPOSAL PLAN 7.1 General 7-1 7.2 Muck Disposal Areas 7-1 7.3 Restoration of Muck Disposal Sites 7-2 7.3.1 Engineering Measures 7-2 ii 7.3.2 Phyto-remediation of Muck Disposal Areas 7-2 7.3.2.1 Re-vegetation of Spoil Tips 7-7 7.3.2.2 Soil Working and Plantation Technique 7-7 7.3.2.3 Species for Plantation 7-9 7.3.2.4 Irrigation Facility 7-9 7.3.2.5 Fencing 7-9 7.3.2.6 Watch and Ward 7-9 7.4 Recommendations 7-9 7.5 Cost Estimate for Muck Disposal Plan 7-10 CHAPTER 8 RESTORATION PLAN FOR QUARRY AREAS 8.1 Quarry Sites 8-1 8.2 Stabilization of Quarry Sites 8-5 8.2.1 Stabilization through phytoremediation 8-5 8.3 Cost Estimates for Restoration Plan for Quarry Areas 8-8 CHAPTER 9 LANDSCAPING AND RESTORATION OF CONSTRUCTION AREAS AND ENVIRONMENTAL MANAGEMENT IN ROAD CONSTRUCTION 9.1 Restoration of Construction Sites 9-1 9.2 Post Project Construction Landscaping 9-1 9.3 Cost estimate for Restoration of Construction Areas 9-2 9.4 Environmental Management in Road Construction 9-2 9.4.1 Design 9-3 9.4.2 Construction 9-3 9.4.3 Drainage 9-4 9.4.4 Grassing and Planting 9-4 9.4.5 Control of Landslides along the roads 9-5 9.4.6 Species recommended for plantation 9-5 Cost estimate for Environmental Management in Road 9.4.7 9-6 Construction 9.5 Restoration of Colony and Office Complex 9-6 Cost estimate for Landscaping & Restoration of 9.6 Construction areas and Environmental Management in 9-7 Road Construction CHAPTER-10 PUBLIC HEALTH DELIVERY SYSTEM 10.1 General 10-1 10.2 Mosquito Control Measures 10-1 10.2.1 Reservoir Operation 10-1 10.2.2 Residential Colonies For The Workers 10-1 10.2.3 Other Measures 10-2 10.3 Traditional Medicinal Practices 10-2 10.4 Development of Medical Facilities 10-2 10.4.1 Manpower 10-2 10.4.2 Proposed Health Facilities at Construction Sites and Labour 10-3 Camp 10.5 Surveillance 10-4 10.5.1 Malaria Control Activities 10-4 10.5.2 Vaccination and Health Check-Up Camps 10-5 iii 11.5.3 Health Extension Activities 10-5 10.6 Cost Estimates for Public health Delivery System 10-5 10.6.1 Fixed Cost (Non-Recurring) 10-6 10.6.2 Variable Cost (Recurring) 10-6 10.6.3 Overall Expenditure 10-7 CHAPTER 11 PLAN FOR SOLID WASTE MANAGEMENT AND SANITATION FACILITIES IN LABOUR CAMPS 11.1 Introduction 11-1 11.2 Quantity of Solid Waste Generation 11-1 11.3 Composition of Municipal Solid Wastes 11-2 11.4 Administrative Set Up 11-3 11.5 Solid Waste Management Plan 11-4 11.5.1 Segregation at source 11-4 11.5.2 Primary Storage of Wastes 11-5 11.5.3 Collection of Solid Wastes 11-7 11.5.4 Waste Handling 11-8 11.5.5 Transportation of Solid Wastes 11-8 11.6 Disposal of Solid Waste (Non-degradable Portion) 11-9 11.7 Treatment of Solid Waste (Degradable Portion) 11-10 11.8 Sanitation Facilities in Labour Camps 11-11 11.8.1 Increase in Labour Population 11-11 11.8.2 Facilities in Labour Camps 11-11 11.9 General Sanitary Measures 11-13 11.10 Cost estimate for Solid Waste Management Plan 11-13 CHAPTER 12 SAFETY PRACTICES DURING CONSTRUCTION PHASE 12.1 Introduction 12-1 12.2 Traffic Management During construction phase 12-1 12.3 Measures to be taken during Excavation of Earth 12-1 12.4 Safety practices during construction phase 12-2 12.5 Fire protection in labour camp and staff colonies 12-2 12.6 Cost estimate for safety practices during construction phase 12-5 CHAPTER 13 ENERGY CONSERVATION MEASURES 13.1 Introduction 13-1 13.2 Energy Conservation during construction phase 13-1 13.2.1 Construction of LPG depot & LPG Connection 13-1 Other Energy Conservation measures during construction 13.2.2 13-2 phase 13.3 Energy conservation during operation phase 13-2 13.4 Energy saving measures for population in study area 13-2 13.4.1 Distribution of Kerosene oil stoves 13-2 13.4.2 Distribution of Pressure Cookers 13-3 13.4.3 Solar Cookers 13-3 13.4.3 Installation of Improved Chulhas 13-4 13-4 13.5 Cost Estimate for Energy Conservation measures iv CHAPTER 14 RESETTLEMENT AND REHABILITATION PLAN 14.1 Existing Guidelines for Resettlement Programme in 14-1 Arunachal Pradesh 14.2 Objectives of R&R Plan 14-2 14.3 Definitions 14-3 14.4 Resettlement and Rehabilitation Grants 14-6 14.4.1 Compensation for Land along with Rights and Privileges 14-6 14.4.2 Housing Benefit and Compensation 14-7 14.4.3 Land Allotment and Compensation 14-7 14.4.4 Ex Gratia for the Landless 14-8 14.4.5 Ex Gratia for those Affected Families who are left with less 14-8 than 1 ha of land 14.4.6 Land Development Assistance 14-8 14.4.7 Livelihood Grant for Landless 14-8 14.4.8 Livelihood Grant for those who have been left with less than 14-8 1 ha of land 14.4.9 Financial Assistance for Self Employed 14-9 14.4.10 Transportation Grant 14-9 14.4.11 Assistance for Construction of Cattle shed 14-9 14.4.12 Subsistence Allowance 14-9 14.4.13 Pension for Life for Vulnerable Affected Persons 14-9 14.4.14 Schedule Tribe Family Grant 14-9 14.4.15 Training for Livelihood 14-10 14.4.16 Free Electricity 14-10 14.4.17 Special Provision 14-10 14.5 Financial Outlay for R&R Benefits 14-10 14.6 Application for Grant and Grant Distribution 14-12 14.7 Infrastructure Facility at Resettlement Site / Colony 14-12 14.7.1 Financial Outlay for Infrastructure Facilities 14-13 14.8 Lump sum Cash Assistance 14-15 14.9 Monitoring and Evaluation 14-15 14.10 Cost estimate for R&R Plan 14-16 CHAPTER 15 COMMUNITY AND SOCIAL DEVELOPMENT PLAN 15.1 Community and Social Development Plan (CSDP) 15-1 15.1.1 Aim of CSDP 15-1 15.1.2 Objectives of CSDP 15-1 15.2 Concerns raised during Public Hearing 15-2 CHAPTER 16 PLAN FOR PROTECTION OF CULTURAL IDENTITY OF LOCALS 16.1 Introduction 16-1 16.2 Strategies / Guidelines 16-1 16.3 Protection of Cultural Identity of Local Tribal 16-1 16.4 Protection of the Natural Habitat of Local Tribals 16-2 16.5 Regulation of Traffic on Roads 16-2 16.6 Institutional Arrangements 16-3 16.7 Action Plan 16-3 v 16.8 Surveillance Measures 16-4 16.9 Support to cultural Heritage/Programmes 16-4 16.9 Cost estimate of Plan for Protection of Cultural identity of 16-5 locals CHAPTER 17 CONTROL OF WATER, AIR AND NOISE POLLUTION 17.1 Water Pollution Control 17-1 17.1.1 Control of water pollution during construction phase 17-1 17.1.2 Control of Water Pollution during operation phase 17-1 17.2 Air Pollution Control 17-2 17.2.1 Control of Emissions 17-2 17.2.2 Control of Air Pollution due to DG Sets 17-2 17.2.3 Dust Control 17-3 17.3 Noise control Measures 17-4 17.3.1 Control of Noise from construction equipment

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    306 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us