Improving Efficiency of Coiled Tubing Operations on Vankor Field (Russian)

Improving Efficiency of Coiled Tubing Operations on Vankor Field (Russian)

TECHNICAL PAPER SPE 130626-RU (in Russian) SPE-130626 (in English) ISBN 978-1-55563-313-4 IMPROVING EFFICIENCY OF COILED TUBING OperatiONS ON VanKOR FIELD (RUSSIAN) Suleyman Sitdikov, Rosneft; Bert von Hertzberg and Stanislav Zagranichniy, Trican Well Service Ltd. Copyright 2010, Society of Petroleum Engineers This paper was presented at the SPE Russian Oil and Gas Conference and Exhibition, held in Moscow, Russia, October 26-28, 2010. ABSTracT Coiled tubing is commonly used as an intervention tool for treatment delivery in long horizontal wells. As with any intervention tool, however, coiled tubing has operational limitations. Depending on the diameter of the horizontal sections and the well trajectory, accessing laterals greater than 1,000 m is often problematic or not possible due to helical friction lock-up. The well profiles inV ankor, a new frontier oil and gas field in East Siberia, are designed with a reverse bend in it allowing the horizontal section of more than 1,000 m the wellbore to be directly beneath the wellhead. There is an 800 m thick layer of perma-frost which is coupled with extremely low reservoir temperatures that complicates the intervention causing the wax precipitation in tubing. Conventionally, it is possible to change the geometry of the intervention (CT OD), optimize the string design, utilize lubricants (metal to metal friction reducers), straighten the coiled tubing string, use downhole tractors and vibration tools. The use of different methods yields incremental reach of 5 – 20% in some cases. This paper highlights an approach that has been implemented in Vankor field to enable the coiled tubing intervention to access the horizontal lateral with the methods of string design optimization and utilization of downhole BHA vibration. The coiled tubing string design requires the special attention for successful intervention in horizontal and extended reach wells. The optimized tapered string allows increasing the advance of coiled tubing to 5-15% compared to traditional design. The vibrator tool can effectively increase CT access to the extended reach hole by reducing the implied friction coefficient of the wellbore up to additional 10 %. The tool is actually delaying the helical shape and reducing the number of coiled tubing contact points dragging on the well bore. This paper reviews the engineering and operational challenges related to utilizing coiled tubing in Vankor field and the solutions required to overcome these issues. To order the full paper, visit http://www.onepetro.org/mslib/servlet/onepetropreview?id=SPE-130626-RU 1332/021015 Corporate Head Office | 2900, 645 – 7th Avenue SW | Calgary, Alberta | Canada T2P 4G8 | P 403.266.0202 | TricanWellService.com Houston Office | Suite 600, 5825 N. Sam Houston Parkway West | Houston, Texas | United States 77086 | P 1.281.716.9152 | TricanWellService.com.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us