King County Metro Updates November 19Th, 2019 Accommodating Future Growth Metro Plans to Increase Service 70% by 2040

King County Metro Updates November 19Th, 2019 Accommodating Future Growth Metro Plans to Increase Service 70% by 2040

Washington State Transportation Commission King County Metro Updates November 19th, 2019 Accommodating future growth Metro plans to increase service 70% by 2040. Add 2.5 million more Add 625 more buses Create more facilities needed service hours on bus to operate and maintain buses routes 2 South Campus Expansion 3 South Campus FUTURE SOUTH ANNEX BASE 2025 FUTURE INTERIM BASE 2020 South King County Base 2020 3 to 1 Selection Process Initiate FTA Concurrence Process 2024 Acquisition Complete (Target) 2026 Construction Commencement 2030 Operational 5 Site Search & Selection Targeted Features: • Approximately 30 acres (250–300 buses) • Access to major freeways and arterials • Rectangular in shape Evaluation Criteria • Deadhead Cost • Impacted Populations • Site Constructability • Sensitive Areas • Equity & Social Justice Opportunities 6 South King County Transit Service November 19, 2019 Renton-Kent-Auburn Area Mobility Plan RapidRide I Line Federal Way Link Extension Restructure Renton-Kent-Auburn Area Mobility Plan • Improve equitable transit access • Increase network efficiency and invest in equity priority areas • Develop a network of mobility services • Create a single route from Renton to Kent to Auburn to be upgraded to the RapidRide I Line Service Change Needs and Outreach and Plan Service Change Service Change Ordinance Priorities Development Developed Education Begins Spring 2019 Summer – Fall 2019 Summer 2020 Sept 2020 Fall 2019 – Spring 2020 8 Types of Changes Re-allocating service from Simplifying the network Eliminating a route peak routes to all day routes Re-allocating service to a Implementing new service Adding service new pathway 9 I Overview . Upgrades current routes 169 & 180 . 6,000 Daily riders . ~$120M capital investment Final Design & Planning Preliminary Start Service Design Construction 2019 September 2023 2019-2021 2021-2023 PHASE 1: Needs Assessment (Spring 2019) PHASE 2: Draft Concepts (Summer 2019) PHASE 3: Final Concepts (Fall 2019) 10 RapidRide Expansion Timeline Downtown Seattle- Rainier Beach East or Madison Valley- Downtown South King Downtown Seattle Seattle-Roosevelt County Line 20212021 20222022 20232023 20242024 20252025 2026 20272027 Burien- Renton-Kent- Totem Lake- Downtown Auburn Eastgate Seattle 11 Federal Way Link Extension Restructure • Service integration project planned for 2023-24 • Project scope will include community and stakeholder engagement and in-depth technical analysis • Will build on Renton-Kent-Auburn Area Mobility Plan • Metro coordinating with Sound Transit • RapidRide A Line will serve three new stations 12.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us