As On31.03.2004

As On31.03.2004

Annex–IV Implementation Status of Projects costing Rs.20 crores and above (As on 31.03.2004) UNIT : (COST/EXPENDITURE :RS.IN CRORES) -------------------------------------------------------------------------------------------------------------- DATE OF ANTI- TIME % COST GOVT. CIPATED- OVER OVER SL. PROJECT CAPACITY APPRO- DATE OF RUN IN RUN 2003-2004 ANNUAL NO. (DISTRICT) VAL COMMISSION- MONTHS ANTI- ON ---------- EXPEND- (STATE) ORGNL ING (LAST- (% ON CIPATED ORIGINAL B.E ITURE CUMMULATIVE (RVSD) REPORTED) REVISED) COST (revised) (R.E) TILL EXPENDITURE --------------------------------------------------------------------------------------------------------------- (0) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) --------------------------------------------------------------------------------------------------------------- SECTOR: ATOMIC ENERGY NUCLEAR POWER CORPORATION OF INDIA LIMITED ------------------------------------------ 1. Tarapur atomic Mwe 1991/01 2007/01 0 525.00 89 991.00 1037.00 4203.00 power M’rshtra 2X540 1997/12 0 2 1091.00 2. Kaiga 3 & 4 Mwe 2001/05 2007/09 -25 3282.00 -22 375.00 148.00 775.00 Pwr Units,K’rtka2X220 2002/04 25 0 243.00 3. Atomic Power Mwe 2001/12 2008/12 0 13171.00 0 1150.00 1241.00 2780.00 Prjct,Ku’klam,TN2X1000 0 0 1750.00 4. RAPP 5&6 Mwe 2002/04 2008/02 0 3072.00 0 325.00 134.00 378.00 Rajasthan 2X220 0 0 220.00 URANIUM CORPORATION OF INDIA LIMITED ------------------------------------ 5. 3RD Shaft 1998/12 N.R. N.A. 1.07 0 - - 35.14 Sinking Jaduguda Bihar 2003/04 N.A. 0 - 6. NEW Uranium 2003/09 2006/06 0 343.26 0 - - - Ore Pro.Mill Bihar 0 0 - INDIRA GANDHI CENTRE FOR ATOMIC RESEARCH ---------------------------------------- 7. PFBR-Stage 1999/03 N.R. N.A. 95.00 0 - - 74.45 A Phase-I,TN, K’pakkam 2002/12 N.A. 0 - 8. PFBR-Stage 1997/03 2005/03 81 28.00 0 - - 5.61 A Phase-II,K’pakkam 540 0 - 9. PFBR PH I St 1999/01 N.R. N.A. 28.20 0 - - 4.26 A Site Infr.K’pakkam 2002/03 N.A. 0 - BHAVINI LIMITED --------------- 10.Fast Breeder Prototype 2003/09 2010/09 0 3492.00 0 - - 18.21 Reactor PR.K’pakkam 500 Mwe 0 0 - SECTOR: CIVIL AVIATION AIRPORT AUTHORITY OF INDIA LIMITED ---------------------------------- 11. Prov.Dedica- 1999/03 N.R. N.A. 70.00 21 - - 4.45 ted Satellite 2002/03 N.A. 21 - 12. Extn.of Runway 2000/08 2004/03 13 28.87 20 13.00 18.10 21.90 Jaipur Airport 43 20 - 13. Development 2000/01 2004/12 13 82.81 4 20.00 16.60 40.23 Amritsar Airport 28 4 - SECTOR: COAL : BHARAT COKING COAL LIMITED -------------------------- 14. Pootkee 3.00 1983/12 2004/03 48 182.60 -9 - 0.98 171.92 Balihari UG 1997/04 25 -9 - CENTRAL COAL FIELDS LIMITED --------------------------- 15. J.P.Rly Bokaro Line 1982/02 2005/03 93 48.78 206 - 0.06 61.33 1991/03 51 0 - 16. Bokaro OCP 0.80 1995/07 2005/03 60 46.78 0 - 3.31 41.99 Mty Bokaro 107 0 - 17. Jharkhand OC 1.0 Mty 1998/10 2004/03 0 110.89 0 12.41 17.76 62.46 SOUTH-EASTERN COAL FIELDS LIMITED --------------------------------- 18. Mahan OC 0.36 1996/06 2004/03 48 41.95 0 0.39 9.68 19.37 Surguja Mt 107 0 - 101 UNIT : (COST/EXPENDITURE :RS.IN CRORES) -------------------------------------------------------------------------------------------------------------- DATE OF ANTI- TIME % COST GOVT. CIPATED- OVER OVER SL. PROJECT CAPACITY APPRO- DATE OF RUN IN RUN 2003-2004 ANNUAL NO. (DISTRICT) VAL COMMISSION- MONTHS ANTI- ON ---------- EXPEND- (STATE) ORGNL ING (LAST- (% ON CIPATED ORIGINAL B.E ITURE CUMMULATIVE (RVSD) REPORTED) REVISED) COST (revised) (R.E) TILL EXPENDITURE --------------------------------------------------------------------------------------------------------------- (0) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) --------------------------------------------------------------------------------------------------------------- 19. Pindura Ug 0.48 1998/03 2004/03 12 49.93 0 2.44 0.15 6.67 Aug.Shahol Mty 20 0 - 20. Vindhya Ug 0.585 1998/03 2004/03 12 49.90 0 2.52 0.41 3.70 Aug’n MP Mty 20 0 - SECTOR: COAL 21. Rehar Ug Rpr 0.31 1998/12 2004/03 3 29.91 14 5.57 0.11 10.80 Shabol Mty 5 14 - 22. Gayatri Ug 0.31 1998/12 2004/03 3 26.30 0 3.35 0.34 6.28 Rpr Mty 5 0 - 23. Rani Atari 0.48 1999/07 2004/07 0 48.54 0 5.22 1.11 4.33 Ug, Rpr Mty 0 0 - 24. Amadand &Bar 0.465 1999/07 2005/03 8 45.26 0 3.40 - 35.35 Tarai Mty 13 0 - 25. Bagdeva Ug 0.405 1999/07 2005/07 12 38.46 0 3.39 2.24 18.74 Rpr Mty 20 0 - 26. Sheetal(Ug) 0.88 2000/05 2006/05 0 98.98 0 3.18 1.06 37.54 Dhara-kuraj Mty 0 0 - 27. Damni Ug 0.48 2000/04 2005/04 0 39.32 0 0.04 0.22 0.22 Shahdol Mty 0 0 - 28. Jhiria Ug 0.33 2000/10 2006/03 0 32.07 0 3.84 - 0.33 Shahdol MP Mty 0 0 - 29. Nawapara OC 0.36 2000/10 2006/03 0 42.55 0 0.19 0.24 9.01 Rpr Mty 0 0 - 30. Kanchan OC 0.32 Mty 2001/03 2004/03 0 23.92 0 - - - 31. Amera OC MP 1.0 Mty 2002/07 2005/07 0 41.69 0 1.59 - - 32. Seam-V Ncph UG0.405 Mty 2002/12 2009/03 0 49.29 0 - - - 33. Baroud OC Expn1.000 Mty 2003/05 N.A. N.A. 28.02 0 - - - Chhatisgarh 34. Saraipali OC 1.400 2003/02 N.A. N.A. 22.82 0 - - - Chhatisgarh Mty N.A. 0 - 35. KHAIRAHA UG 0.585 2003/09 N.A. N.A. 88.33 0 - - - Madhya Pr. Mty N.A. 0 - EASTERN COAL FIELDS LIMITED --------------------------- 36. Jhanjra Ug 3.50 1982/12 2004/03 72 386.44 109 9.33 0.40 364.09 Burdwan 2.00 Mty. 1995/08 39 -4 - 37. J.K.Nagar Ug 0.87 1991/02 2004/03 108 54.15 -43 2.12 0.07 48.71 Burdwan 0.65 Mty 220 -43 - NORTHERN COAL FIELDS LIMITED ---------------------------- 38. Dudhichua OC 10.0 1992/08 2004/03 0 1281.39 47 120.82 98.22 1233.43 Phase-I Mty 2001/03 0 0 - 39. Nigahi Expn. 10 1997/07 2004/03 0 1846.49 0 287.39 139.80 1369.45 OC Mty 0 0 - MAHANADI COAL FIELDS LIMITED ---------------------------- 40. Natraj Ug Ori 0.64 Mty 2001/01 2004/01 0 92.11 0 3.49 0.04 1.86 41. Jaganath Ug 0.67 Mty 2002/03 2010/03 0 80.75 0 5.45 - 0.49 42. Talcher(W)Ug 0.52 Mty 2003/02 2010/03 0 85.05 0 - - - 43. Lingaraj OcOri5.0 Mty 2003/02 2007/03 0 98.89 0 - - - 44. Hingula-II Oc 2.0 Mty 2003/02 2005/03 0 87.10 0 - - - 45. Bharatur Ocp 6.0 Mty 2003/06 2006/06 0 95.87 0 - - - 46. Basundhra OCP 2.4 Mty 2003/10 2007/10 0 176.55 0 - - - WESTERN COAL FIELDS LIMITED --------------------------- 47. Naharia Ug 0.36 1996/06 2004/03 12 46.17 0 5.11 0.26 23.60 Chindwara Mty 15 0 - 48. Kumbharhkani 0.36 1998/12 2005/03 0 34.91 -39 6.21 2.67 19.82 Ug Mty 2002/07 0 0 - Yeotmal 0.30 102 UNIT : (COST/EXPENDITURE :RS.IN CRORES) -------------------------------------------------------------------------------------------------------------- DATE OF ANTI- TIME % COST GOVT. CIPATED- OVER OVER SL. PROJECT CAPACITY APPRO- DATE OF RUN IN RUN 2003-2004 ANNUAL NO. (DISTRICT) VAL COMMISSION- MONTHS ANTI- ON ---------- EXPEND- (STATE) ORGNL ING (LAST- (% ON CIPATED ORIGINAL B.E ITURE CUMMULATIVE (RVSD) REPORTED) REVISED) COST (revised) (R.E) TILL EXPENDITURE --------------------------------------------------------------------------------------------------------------- (0) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) --------------------------------------------------------------------------------------------------------------- 49. Conv.Kamptee 0.65 2000/05 2007/03 0 88.39 0 15.84 6.68 31.65 Ug To Ocp Mty 0 0 - 50. Adasa Ug Mty 2000/12 2006/03 12 39.87 0 3.82 0.46 1.58 Nagpur 0.21 24 0 - 51. Dhurwasa Oc 0.55 2001/08 2007/03 12 62.74 0 4.93 1.06 6.42 Wardha Mty 22 0 - 52. Tandsi Ug Exp 0.59 Mty 2001/07 2005/03 12 69.06 0 8.20 0.12 10.77 53. Kalgaon Oc 0.4 Mty 2001/08 2006/03 0 74.97 0 2.03 0.86 1.48 54. Gauri-Deep Oc 0.4 2001/11 2010/03 0 86.21 0 1.68 - 0.25 Ballarpur Mty 0 0 - 55. Urdhan Ocp 0.5 2002/05 2006/03 0 43.50 0 4.65 0.06 3.60 Pench Mty 0 0 - 56. Makardhokra 0.5 2003/01 2005/03 0 44.62 0 1.76 0.27 20.35 II Oc Mty 0 0 - SINGARENI COLLIERIES COMPANY LIMITED ------------------------------------ 57. Ktk-8 Incl 0.686 1995/12 2008/03 0 41.54 20 3.55 - 0.16 Ug W’gal AP Mty 2002/06 0 0 - 58. Ktk-9 & 9A 0.48 1996/08 2005/03 0 43.41 0 0.05 - 0.18 Ug Mt 0 0 - 59. Ktk-3 Incl 0.30 1996/08 2007/03 0 47.33 26 5.40 4.25 20.35 Ug Mt 2002/06 0 0 - Warangal 0.572 60. NO.21 Inc Bg 0.285 2000/02 2004/03 0 27.05 0 - 0.55 5.90 Khammam Mty 0 0 - 61. Koyagudem 1.0 2000/11 2004/03 0 25.84 -34 0.70 1.40 7.94 Ocp Mty 2001/09 0 0 - 62.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    21 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us