3Rd Ave, E 60Th St to E 72Nd St; 66Th St

3Rd Ave, E 60Th St to E 72Nd St; 66Th St

rd rd nd 3 Avenue, 63 - 72 Streets 2015 66th Street, 2nd-3rd Avenues Month& Pedestrian Safety Improvements Year 2016 New York City Department of Transportation Presented by the Pedestrian Projects Group, October 7, 2015 to Manhattan CB 8 Transportation Committee Project Area Shopping and restaurant corridor with dense residential use 6 Nearby subways and multiple bus routes 6 Near Central Park N/Q/R 2 4/5/6 Project Background • CM Garodnick requested median enlargement on 66th St at 3rd and 2nd Aves (2010) • Safety improvements implemented on 3rd Ave at 79th St and 86th St (2013) and 60th St (2014) • DOT repaving of 3rd Ave between 64th St and 72nd St is opportunity for updated road markings to improve safety (October 2015) 3 Vision Zero • Multi-agency effort to reduce traffic fatalities in NYC • Borough Action Plans released in 2015 Manhattan Priority Map • Priority Intersections, Corridors and Areas identified in each borough ► 3rd Ave and 2nd Ave are Priority Corridors in Manhattan ► Project locations are in Priority Area 4 Crash History 36 2 5-year period (2009-2013) # Total injuries # Severe injuries On 3rd Ave, both E 63rd St and E 66th St had seven 21 pedestrian injuries from 1 northbound left-turning vehicles, four of them 4 being moderate to severe 1 30 2 5 Rapid Response Toolkit • Painted and/or gravel surfaces • Planters with maintenance partner • Pavement markings • Flexible delineators • Sign installation • Concrete islands & sidewalk extensions 6 Existing Conditions 3rd Ave is wide corridor with excess capacity 70’ with 5 moving lanes Looking south on 3rd Ave at E 71st St 7 Cross Section: 3rd Ave from 60th to 72nd EXISTING 3rd Ave: 60th St to 72nd St PROPOSED 3rd Ave: 60th St to 72nd St *Left-turn lanes approaching 63rd, 66th, & 72nd Sts and right-turn bay approaching 66th St 8 Existing Conditions Pedestrians waiting in the roadbed to cross in the shadow of parking lane 9 Looking south on 3rd Ave at E 66th St rd Proposal: E. 63 St Neckdown on northwest corner* Ave Third E 63rd St MTA to build sidewalk extension as part of elevator project (2016) New left turn lane to clarify movements *Concrete or paint to be determined 10 Proposal E. 72nd St E 72nd St E 72nd St New left turn lane to clarify movements Third Ave Ave Third 11 Proposal: Similar Treatment BEFORE On 3rd Ave, both 79th St and 86th St have experienced a reduction of injuries in the year following implementation of the same treatment* 79th St 86th St Total injuries -44% -63% AFTER Pedestrian injuries -33% -45% *compared to 3-year average before implementation 12 Existing Conditions: E. 66th St Long diagonal crossings across 3rd and 2nd Aves at 66th St 13 Looking west on E 66th St at 2nd Ave Existing Conditions: E. 66th St Narrow pedestrian cut- through on island Lack of sidewalk along planting bed Looking south on 2nd Ave at 66th St Existing: 3rd Ave & E. 66th St Third Ave Ave Third 70’ E 66th St E 66th St 78’ Long diagonal crossing E 66th St 15 Proposal: 3rd Ave & E. 66th St Neckdown on northwest and northeast corners* Shortened Third Ave Ave Third crosswalks E 66th St 47’ E 66th St 62’ New left turn lane to E 66th St clarify movements Concrete extension of median New right turn bay *Concrete or paint to be determined 16 Existing: 2nd Ave & E. 66th St Second Ave Second E 66th St E 66th St E 66th St Long diagonal crossing 17 Proposal: 2nd Ave & E. 66th St Second Ave Second E 66th St E 66th St Removes right-turn E 66th St conflict between pedestrians and Concrete extension vehicles of median Clearly marked right turn lane 18 Summary Expected benefits: • Clarified vehicular movements and calmed traffic • Safer, shorter crosswalks • Expanded pedestrian space Fall 2015 1. Repave 3rd Ave between E 64th and E 72nd Sts 2. Install new lane assignment markings on 3rd Av between E 64th St and E 72nd Sts 3. Install neckdown on NW and NE corners of 3rd Ave and E 66th St 4. Initiate signal study for leading pedestrian intervals (LPIs) on 3rd Ave at E 66th St, E 65th St, and E 63rd St 2016 1. Build median extensions on E 66th St at 3rd and 2nd Aves 2. Install neckdown on NW corner of E 63rd St (pending MTA construction completion) 19 Thank nyc.gov/dot You Thank nyc.gov/dot You .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us